Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹1.6 Cr
EMD Value
₹1.6 L
Closing Date
20 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Petlad Irrigation Division Petlad
Constructing RCC box type VRB in place of existing damaged VRB @ Ch 6380 m on alang 5 drain.
355538
11 of 2026-27
Open
Miscellaneous Works
Works
Anand
13 documents required · 10 mandatory · 3 optional
₹3,600
Executive Engineer Petlad Irrigation Division Petlad
₹1.6 L
6 Nov 2026
6 Nov 2026
6 Nov 2026
20 Nov 2026
6 Nov 2026
120 days
Bill Of Quantities
Memorandum showing items of works to be carried out
NAME OF Constructing RCC box type VRB in place of existing damaged VRB @ Ch 6380 m on alang
Quantity Total amount
Quantity Total amount
SR. accoarding to
but may Item of work Unit
No. be more or Rs. in figs. Rs. in words estimated
less quantities
ITEM NO :- 1 Excavation for foundation in all sorts of
soil including yellow sandy gravelly soils ,soft & hard
murrum etc. in dry condition including depositing the
excavated stuff in uniform layers in banks or as and
where directed etc. complete for lead up to 500m and
all lift. (BY MACHINERY) Including dewatering.
ITEM NO :- 2Providing & Laying in position
"NOMINAL MIX" cement concrete using cement, sand
and crushed aggregate by mass and machine mix for
C.C./R.C.C work incl. necessary formworks centering, Rs. Three
scaffolding, compaction by vibrator, curing as directed Thousand
2 153.00 with all lead & lift etc complete Without Dewatering 3346.00 Three Cum
and excluding cost of steel reinforcement. (A) For Hundred
Foundation concrete / General purpose (a) C. C. Forty Six Only
Nominal Mix, M-10 and MSA-40 mm
ITEM NO :- 3(A) Providing & Laying in position
"DESIGN MIX" cement concrete using cement sand
and crushed aggregate for C.C./ R.C.C work by
"FLORI" including necessary formwork, centering,
scaffolding, compaction by vibrator, curing as directed Rs. Four
with all lead & lift etc complete without dewatering Thousand
3 342.00 and excluding the cost of steel reinforcement. (A) For 4190.00 Cum
Footing of column / Abutment / Pier / Bottom slab of Ninety Only
barrel / Plinth course / Coping / Approach Slab etc.
(b) Concrete grade M-15 and MSA-20 mm
ITEM NO :- 3(B) Providing & Laying in position
"DESIGN MIX" cement concrete using cement sand
and crushed aggregate for C.C./ R.C.C work by
"FLORI" including necessary formwork, centering, Rs. Five
scaffolding, compaction by vibrator, curing as directed Thousand Six
4 157.00 with all lead & lift etc complete without dewatering 5642.00 Hundred Cum
and excluding the cost of steel reinforcement. ((E) For Forty Two
Column / Beam / Solid Slab of Road Bridge /Barrel / Only
Cutoff wall etc. (q) Concrete grade M-25 and MSA-20
ITEM NO :- 3 (C) Providing & Laying in position
"DESIGN MIX" cement concrete using cement sand
and crushed aggregate for C.C./ R.C.C work by
"FLORI" including necessary formwork, centering, Rs. Five
scaffolding, compaction by vibrator, curing as directed Thousand
5 32.00 with all lead & lift etc complete without dewatering 5481.00 Four Hundred Cum
and excluding the cost of steel reinforcement. (D) For Eighty One
Kerb / Wearing coat. (n) Concrete grade M-25 and Only
MSA -10 to 20mm
ITEM NO :- 4 Providing & Laying in position "DESIGN
MIX" cement concrete using cement sand and crushed
aggregate for C.C./ R.C.C work by "FLORI" including
necessary formwork, centering, scaffolding, Rs. Four
compaction by vibrator, curing as directed with all lead Thousand
& lift etc complete without dewatering and excluding Eight
the cost of steel reinforcement.(A)For Footing of Hundred
column/Abutment/pier/Bottom slab of barrel/Plinth Fifteen & Fifty
course/coping/Approch slab -Concrete grade M-30 Paise Only
ITEM NO :- 5 Providing & Laying in position "DESIGN
MIX" cement concrete using cement sand and crushed
aggregate for C.C./ R.C.C work by "FLORI" including
necessary formwork, centering, scaffolding, Rs. Five
compaction by vibrator, curing as directed with all lead Thousand
& lift etc complete without dewatering and excluding Eight
the cost of steel reinforcement.(E) For Hundred Six
column/Beam/Solid slab of road bridge/Barrel/cutoff & Fifty Paise
wall etc grade M-30 and MSA-20 mm Only
ITEM NO :- 6 Providing & Placing in position
reinforcement bars including cutting, bending, welding Rs. Seven
joints where necessary, hooking etc. complete as per Thousand
8 925.00 drawing for all lead and lifts. TMT 7194.00 One Hundred Qtl
ITEM NO :- 7 Providing and fixing in position pre-
moulded asphalt or bitumen cork board of approved Rs. One
quality and specifications as per design and drawing. Thousand
25 mm thickness Five Hundred
ITEM NO :- 8 Providing and fixing in position P.V.C.
heavy duty water stops in barrels, troughs and wing
walls with 25 mm wide expansion joint as shown in Rs. Five
drawing including filling the joints with asphalt pad Hundred
10 91.00 or bitumen cork board of approved quality. Asphalt 587.70 Eighty Seven mt
pad or bitumen cork board will be paid separately) & Seventy
225 mm WIDE P.V.C. WATER STOP Paise Only
ITEM NO :- 9 Providing and filling the polysulphide
joint sealent of the approved make in the expansion
and contraction joints in the C.C. lining including
11 91.00 181.20 Eighty One & mt
clearing the joints with air water jet.
ITEM NO :- 10 Providing and fixing 110 mm diameter Rs. Three
P.V.C..Pipe (6 kgf / sq cm) Water spout with necessary Hundred Sixty
12 7.00 iron grating as per design 369.20 Nine & mt
ITEM NO :- 11Backfilling the foundation trenches
around the structures etc with selected excavated stuff Rs. Thirty Six
13 469.00 including watering, ramming, compacting etc. 36.90 & Ninety Paise Cum
complete. (By Machinery) Only
ITEM NO :- 12 Providing and fixing in position 1.80 m
high above finished ground level canal data boards of
standard size 0.6 m x 0.45m with M.S. angle 40mm x
40mm x 6mm with 3mm thick iron plate in 1:5:10
14 1.00 proportion concrete block size 40cm x 40cm x 75 cm 1817.00 No
including painting existing data on the board etc.
complete as directed.
ITEM NO :- 13 Providing rubble and sand layer
including supplying of rubble & coarse clean sharp Rs. One
sand at site including spreading rubble & coarse sand Thousand
materials in 25 cm layer including filling in the gaps in One Hundred
15 70.00 rubble, and levelling etc.complete as directed (80% 1155.90 Cum
rubble & 20% coarse sand) including consolidation, Ninety Paise
watering etc. complete. Only
ITEM NO :- 14 Carrying out "Footing load Test" as per
GERI -Vadodara's SOR for the Year 2023-24 (SOR Rs. Fifty
available on GERI web site) Three
ITEM NO :- 15 Providing and laying in position
mm dia (6 kgf/sqcm) P.V.C. Pipe for weep holes with Rs. Two
non corroding jali in abutments, wing walls, retaining Hundred Sixty
walls etc. complete. Two & Fifty
ITEM NO :- 16 Providing and fixing in position (
different diameter ) NP2 R.C.C. pipe with collar Rs. Two
including filling and caulking the joints with cement Thousand
18 12.50 mortar 1:1 proportion, finishing to design grade and 2200.80 Two Hundred Rmt
level curing etc. complete for all leads and lifts. NP-2 & Eighty Paise
class 900 mm dia pipe. Only
ITEM NO :- 17 Providing and laying inverted filter of
specified thickness in two layears Gravel/Metal, Sand
as specified in drawing at the back of abutment, Rs. Five
returns & wing walls etc. complete (Assumining 0.60 m Hundred Five
thick.,0.30mGravel/Metalfilter& 0.30m. Sand filter) & Ten Paise
ITEM NO :- 18 providing and Placing in position
mechanically woven double twisted, galvenized without
PVC coating "GABIONS" made of mesh size 10 X 12 cm
with Mesh wire diameter 3.0 mm, including proving
and lying stones with least dimention of 200 mm and Rs. One
tying with lacing wire of diameter 2.2 mm and Thousand
arranging the same as instructed or as per drawing at Eight
the locations/ structures etc including dressing the Hundred
slope , minor earth fill with all lead and lift etc Forty Nine
complate (b) 1.00 m x 1.00 m x 0.60 m size Only
(stone weight between 10kg to 40kg)
ITEM NO :- 19 Providing drone videography on the
occaion of function or for before/on going/after Rs. Four
completion of construction work including dubbing , Job
21 1.00 4000.00 Thousand
titeling etc. complete including cost of cassette/CD work
ITEM NO :- 20 Dismantling the R.C.C. work and
disposing off the stuff including stacking of the useful Rs. One Thousand
materials etc. complete as directed. Seven Hundred
22 79.00 1732.80 Thirty Two &
(a) Light Reinforcement ( Main bar upto 16 mm. dia.)
Eighty Paise Only
ITEM NO :- 21 Dismantling the existing foundation
concrete including sorting out the dismantalled stuff Rs. One Thousand
and stacking the useful material, removing the One Hundred
23 20.00 debries and making good the damages etc. complete as 1155.20 Fifty Five & Cum
and where directed. Cement Concrete Twenty Paise
ITEM NO :- 22 Dismantling the existing brick masonry
including sorting out and stacking the useful material
24 495.00 and removing the debries and making good the 750.90 Hundred Fifty & Cum
damages etc. complete as directed. In Cement Mortar Ninety Paise Only
ITEM NO :- 23 Providing temporary all weather and
fair weather diversion suitable for traffic during the Rs. Nine Lac
construction period of the structure including
25 1.00 providing necessary drain diversion and all safty 982225.45 Hundred Twenty
measures including red lamps/ signals at night for Five & Forty Four
traffic etc. com Paise Only
Rs one caror fifty six lakh elevan thousand nine hundred four and Ninty five paisa only
I / We am / are willing to carry out the work at………………..% above / below precent.
(Should be written in figure and words) of the estimate reates mentioned above.
Amount of my / our tender works out as under.
Estimated amount put Estimated amout put
to tender Rs……………. to tender Rs……………..
Deduct …………..% Add………………%
below Rs………… Above Rs……………
Net Rs……………….. Total Rs…………….
In words…………………………….. In words………………
Notes 1 - The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra payment shall
Notes 2 - The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
Notes 3 - GST and Income tax TDS will be deducted at a source while making payments of bills
Note 4 - In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.G.R.:PRC-10/2017 Cement Consumption / 16 / CDate:
11/05/2017asstated in S.O.R. there fore in R.C.C. items where there is a change as per actual mix design the cost of difference of cement consumption have been
deducted from the rate of original item at the rate of 5483.37/- per MT.
Signeture of Contractor Deputy Executive Engineer
Drain Sub Division
Divisional Account Officer
Petlad irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Notice 11 of 2026-27 online.pdf
1 Front Page.pdf
3.Notice Inviting online Tender.pdf
4.Final SBD Correncted.pdf
5 General and special condition alang 5 drain.pdf
7. Bill of Quantities alang 5.pdf
8 Itemwise specification alang 5.pdf
BOQ.pdf
dssd.pdf
Price Escaltion.pdf
work and site condition.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .