Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC E 2 216 GROUND FLOOR SHIV RAM PARK NEAR LUCKY GARDEN NANGLOI NEW DELHI 110041 | WEST DELHI | DELHI | 110041 | ₹1.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.3 Cr+₹4.7 L (3.94%)Rejected-Finance | ₹1.3 Cr+₹4.7 L (3.94%) | L2 | Rejected-Finance Not L1 |
| 3 | L3₹1.4 Cr+₹16.9 L (14.0%)Rejected-Finance E76 LGF KALKAJI BHAIRAV MANDIR NEW DELHI DELHI 110020 | SOUTH EAST DELHI | DELHI | 110020 | ₹1.4 Cr+₹16.9 L (14.0%) | L3 | Rejected-Finance Not L1 |
| 4 | Not Admitted-Fee D S 185 186 SECTOR D LDA COLONY KANPUR ROAD LUCKNOW LUCKNOW UTTAR PRADESH 226012 | LUCKNOW | UTTAR PRADESH | 226012 | - | - | Not Admitted-Fee EMD Exemption Certificate not received |
| 5 | Not Admitted-Fee | - | - | Not Admitted-Fee EMD/Instrument is not valid |
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
26 May 2020, 5:30 pmClosed
SM (E-E)
O/o AIRPORT DIRECTOR JPNI AIRPORT PATNA
Annual Operation Comprehensive Maintenance of Centralized AC Plant Package AC Unitay AC units at JPNI Airport Patna
2020_AAI_45860_1
AAI/ER/PAT/SM (E-E)/AOCM-AC-Plant/e-NIT- 13/19-20
Open Tender
AMC/ Maintenance Contracts
Works
730 days
JPNI Airport Patna
Please refer Tender Documents
10 documents required · 10 mandatory
₹1,120
Yes
AAI
₹2.8 L
Yes
2 Jul 2020
17 Mar 2020
8 Jun 2020
17 Mar 2020
26 May 2020
17 Mar 2020
17 Mar 2020 - 25 May 2020
Amount
Operation of different Capacities of microprocessor based Centralized AC Plants, Water Cooled Package air-conditioning units & duct able air-cooled split AC units etc installed at Patna Airport by engaging manpower in three shifts on all days i/c Sundays & holidays as per detailed specifications, terms & conditions covered under this contract.
1st Year (Yr. 2020-21)
2nd Year (Yr. 2021-22)
All-inclusive Comprehensive maintenance of following Capacity microprocessor based centralized AC Plants comprising of all machineries, equipment’s installed in the A/C plant Room i/c Cooling Tower, AHU's, electrical control panel, starters etc. with arresting of leakage, toping up of refrigerant ,insulation, spares parts, lubrication, rewinding/ replacing of all type of motors, valves/strainer, compressors and electrical components etc to keep the air-conditioning units in serviceable condition all the time. (a) 2x60 TR (Make:Batliboi)
For 1st Year( For the Year : 2020-21)
For 2nd Year( For the Year :2021-22)
All-inclusive Comprehensive maintenance of following Capacity microprocessor based centralized AC Plants comprising of all machineries, equipment’s installed in the A/C plant Room i/c Cooling Tower, AHU's, electrical control panel, starters etc. with arresting of leakage, toping up of refrigerant ,insulation, spares parts, lubrication, rewinding/ replacing of all type of motors, valves/strainer, compressors and electrical components etc to keep the air-conditioning units in serviceable condition all the time. (b) 2x40 TR (Make:Voltas)
For 1st Year( For the Year : 2020-21)
For 2nd Year( For the Year :2021-22)
All-inclusive Comprehensive maintenance of 3x22 TR (Make: Voltas) water cooled package air-conditioning units comprising of all machineries, equipment’s installed in the A/C plant Room i/c Cooling Tower, electrical control panel, starter etc. with arresting of leakage, toping up of refrigerant gas, lubrication, rewinding/ replacing of all type of motors, compressors and electrical components etc to keep the air conditioning units in serviceable condition all the time.
For 1st Year( For the Year : 2020-21)
For 2nd Year( For the Year :2021-22)
All-inclusive Comprehensive maintenance of following capacity duct able air-cooled package air-conditioning units and comprising of all machineries, equipment’s installed i/c AHU's, electrical control panel, starters etc. with arresting of leakage, toping up of refrigerant gas, lubrication, rewinding/ replacing of all type of motors, compressors and electrical components etc to keep the air conditioning units in serviceable condition all the time. (a) 2x22 TR (Make: Blue Star)
For 1st Year( For the Year : 2020-21)
For 2nd Year( For the Year :2021-22)
All-inclusive Comprehensive maintenance of following capacity duct able air-cooled package air-conditioning units and comprising of all machineries, equipment’s installed i/c AHU's, electrical control panel, starters etc. with arresting of leakage, toping up of refrigerant gas, lubrication, rewinding/ replacing of all type of motors, compressors and electrical components etc to keep the air conditioning units in serviceable condition all the time. (b) 2x17 TR(Make: Carrier)
For 1st Year( For the Year : 2020-21)
For 2nd Year( For the Year :2021-22)
All-inclusive Comprehensive maintenance of following capacity duct able air-cooled package air-conditioning units and comprising of all machineries, equipment’s installed i/c AHU's, electrical control panel, starters etc. with arresting of leakage, toping up of refrigerant gas, lubrication, rewinding/ replacing of all type of motors, compressors and electrical components etc to keep the air conditioning units in serviceable condition all the time. (c) 1x17 TR(Make:Voltas)
For 1st Year( For the Year : 2020-21)
For 2nd Year( For the Year :2021-22)
All-inclusive Comprehensive maintenance of capacity 2x 50HP Set (Make: Bluestar) microprocessor based modular duct able type variable refrigerant flow(VRF) AC units and comprising of all machineries, equipment’s installed i/c AHU's, electrical Control panel, starters, fan motor, interconnecting refrigerant piping, cabling, insulations, spares etc. with arresting of leakage, toping up of refrigerant gas, lubrication, rewinding/ replacing of all type of motors, inverter compressor's, filters and electrical components etc to keep the air conditioning units in serviceable condition all the time.
For 1st Year( For the Year : 2020-21)
For 2nd Year( For the Year :2021-22)
All-inclusive Comprehensive Maintenance of the following capacity and type of all makes of air conditioner/inverter type AC units installed at different locations of airport including providing and replacing all necessary consumables, spares, compressors, refrigerant and all accessories including servicing etc complete as required as per special condition of contract. (a) For 1st Year( For the Year : 2020-21)
1.0 TR Split type AC
1.5 TR Split type AC
2.0 TR Cassette/Split type AC
3.0 TR Cassette/Tower/Split type AC
4/4.5.0 TR Cassette/Tower/Split type AC
All-inclusive Comprehensive Maintenance of the following capacity and type of all makes of air conditioner/inverter type AC units installed at different locations of airport including providing and replacing all necessary consumables, spares, compressors, refrigerant and all accessories including servicing etc complete as required as per special condition of contract. (b) For 2nd Year( For the Year : 2021-22)
1.0 TR Split type AC
1.5 TR Split type AC
2.0 TR Cassette/Split type AC
3.0 TR Cassette/Tower/Split type AC
4/4.5.0 TR Cassette/Tower/Split type AC
Supply & fixing of refrigerant copper tubing of suitable size for both suction and discharge along with nitrile/polythene foam insulation for tubing covering and electrical cable of suitable size copper conductor and communication cable from indoor to outdoor suitable for 3.0 TR/4.0 TR Air conditioner i/c laying/clamping on surface, chiselling & making good of wall etc connection complete as per requirement of site.
Supply & fixing of extra refrigerant copper tubing of suitable size for both suction and discharge along with nitrile/polythene foam insulation for tubing covering and electrical cable of suitable size copper conductor from indoor to outdoor suitable for 1.5 TR / 2.0 TR Air conditioner laying/clamping on surface, chiselling & making good of wall etc connection complete as per requirement of site.
Supply and installation of 20 mm dia hard PVC drain pipe with all accessories like bends, couplers, tees i/c chiselling, making good of wall or laying on surface etc as per site requirement complete as required.
Dismantling, shifting, re-installation, testing and commissioning of capacity 3.0 TR to 4.5 TR for all make & type (Cassette/Tower/Split) air-conditioner unit including topping up refrigerant, supply of suitable MS/GI stand etc complete as required as per direction of EIC.
Dismantling, shifting, re-installation, testing and commissioning of capacity up to 2.0 TR for all make & type (Cassette/Tower/Split) air-conditioner unit including topping up refrigerant, supply of suitable MS/GI stand etc complete as required as per direction of EIC.
SUVIDHA ENGINEERS INDIA PVT LTD
Skyline Airconditioning Engineers Pvt. Ltd.
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .