Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.6 CrAccepted-AOC | ₹5.6 Cr Quoted ₹5.8 Cr | 1 | Accepted-AOC Work Awarded to L1 M/s.kumaran kudil construction |
| 2 | 2₹5.9 Cr+₹7.3 L (1.27%)Rejected-Finance | ₹5.9 Cr+₹7.3 L (1.27%) | 2 | Rejected-Finance L1 Lowest Tenderer can only be Accepted. L2 is Rejected. |
| 3 | 3₹5.9 Cr+₹13.0 L (2.24%)Rejected-Finance THALIYAPATTY VELLIYANAI POST KARUR 639 118 | KARUR | TAMIL NADU | 639118 | ₹5.9 Cr+₹13.0 L (2.24%) | 3 | Rejected-Finance L1 Lowest Tenderer can only be Accepted. L3 is Rejected. |
Tender Value
₹5.6 Cr
EMD Value
₹2.9 L
Closing Date
17 Oct 2019, 3:00 pmClosed
Superintending Engineer H C and M Circle
The Superintending Engineer, Highways, C and M, 39, Chikkanna College Road, Tirupur-641602
ImptsImpts to Riding Quality Rebuilding and Including Upkeeping for Period of 60 Months on Govt Roads in Krishnarayapuram Highways C M Sub Division Package No 24
2019_HWAY_136358_1
TN 03 19 20 HDO Dt 28 08 19 Pkg 24 Karur Division
Open Tender
Civil Works - Highways
Percentage
180 days
Krishnarayapuram
Refer PQ Documents Volume I
15 documents required · 15 mandatory
₹0
₹2.9 L
28 Jan 2020
6 Sept 2019
21 Oct 2019
6 Sept 2019
17 Oct 2019
18 Sept 2019
9 Sept 2019 - 13 Sept 2019
eProcurement System Government of Tamil Nadu Created By: Nagarajan GV Created Date/Time: 29-Oct-2019 04:23 PM Tender Title: TN 03 19 20 HDO Dt 28 08 19 Pkg 24 Karur Division Tender ID: 2019_HWAY_136358_1
Tender Inviting Authority: Superintending Engineer Highways Construction and Maintenance Tirupur Circle
Improvements, Improvements to Riding Quality, Rebuilding, and Including Upkeeping for Period of 60 Months on Government Roads in Krishnarayapuram (Highways), C&M, Sub Division. Package No.24 Road A:- Improvements to Riding Quality at km 26/0 - 28/4 Vaiyampatty - Karur Road (via) Mylampatty - Uppidamangalam (SH 199) including upkeeping for a period of 60 months. Road B:- Improvements of Mahadhanapuram – Mylampatty road (via) Palayajayamkondam, Panchapatty Road at km 10/0-11/0, 13/0-14/0 & 18/0-18/500 (M625) including upkeeping for a period of 60 months. Road C:- Improvements of Mayanur – Sengal – Panchapatty Road at km 3/0-6/0 (M632) including upkeeping for a period of 60 months. Road D:- Improvements to Riding Quality at km 11/0-16/0 of Mayanur – Sengal – Panchapatty Road (M632) including upkeeping for a period of 60 months. Road E:- Improvements to Riding Quality at km 0/0-1/0 of Km 17/4 of Mylampatty - Uppidamangalam Road to Porani including upkeeping for a period of 60 months. Road F:- Improvements of Manavasi – Karuppur Road to Nathamedu link road at km 0/0-4/4 including rebuilding at Km.0/2 & 2/8 including upkeeping for a period of 60 months.
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 SAKTHI ENGINEERING CONTRACTORS 50329916.790 5.000 59187983.000 Five Crore Ninty One Lakh Eighty Seven Thousand Nine Hundred and Eighty Three
2.00 kumaran kudil construction 50329916.790 2.700 57891484.000 Five Crore Seventy Eight Lakh Ninty One Thousand Four Hundred and Eighty Four
3.00 PALANIAPPA ENGINEERING WORKS 50329916.790 4.000 58624288.000 Five Crore Eighty Six Lakh Twenty Four Thousand Two Hundred and Eighty Eight
Lowest Amount Quoted BY: kumaran kudil construction(57891484.000)
BOQ Summary Details Tender Title: TN 03 19 20 HDO Dt 28 08 19 Pkg 24 Karur Division Tender ID: 2019_HWAY_136358_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 kumaran kudil construction 57891484.000 L1
2 PALANIAPPA ENGINEERING WORKS 58624288.000 L2
3 SAKTHI ENGINEERING CONTRACTORS 59187983.000 L3
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .