Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance AT BANSJORA 12 NO BANSJORA PO BANSJORA DHANBAD 828101 | DHANBAD | DHANBAD | JHARKHAND | 828101 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹8.0 L
EMD Value
₹10,100
Closing Date
11 May 2026, 6:00 pmClosed
ACE, SIJUA
OFFICE OF ACE, SIJUA
Cleaning and Provisioning temporary RCC Hume Pipes for the Monsoon Drain from Nagri Jore Tetulmari to SBC under Sijua Area
2026_BCCL_359000_1
GM/SA/Civil/2026-27/eNIT-01
Open Tender
Civil Works - Others
Percentage
15 days
Tetulmari
AS PER NIT
3 documents required · 3 mandatory
₹10,100
Yes
8 May 2026
2 May 2026
12 May 2026
2 May 2026
11 May 2026
2 May 2026
2 May 2026 - 7 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0Item Description/ Heading | |||||
| 1.01 | Cleaning of drain/semi circular hume pipe,excavating soil,liquid mud and debrises by taking out other malbas etc. all complete including disposals of the same with a lead of 50M | 529.88 | cum | 198.95 | ₹1,05,418.63 |
| 1.02 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m | 2,250 | sqm | 10.5 | ₹23,625 |
| 1.03 | By mechanical transport including loading, unloading & stacking : Manure or sludge transporting of silt,garbage etc | 264.94 | cum | 137.27 | ₹36,368.04 |
| 1.04 | Providing and laying Non Pressure NP-4 class (Heavy duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete1200 mm dia RCC pipes. (Laying by manual/ machanical means) | 15 | metre | 8,442.3 | ₹1,26,634.5 |
| 1.05 | Providing and laying Non Pressure NP-2 class (Light duty) R.C.C. semi circular pipes includingcollars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete2000mm dia RCC pipes. ( | 60 | metre | 5,395.7 | ₹3,23,742 |
| 1.06 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mmnominal size) upto plinth level withCement mortar 1:6 (1 cement : 6 coarse sand) | 12.15 | cum | 5,220.3 | ₹63,426.65 |
| 1.07 | Total impact of GST for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.02 MB
finance_371870.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 3.11 MB
BOQ_371870.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .