Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Qualified |
| 2 | Accepted-Technical | Accepted-Technical Qualified |
| 3 | Accepted-Technical | Accepted-Technical Qualified |
| 4 | Accepted-Technical | Accepted-Technical Qualified |
| 5 | Accepted-Technical | Accepted-Technical Qualified |
Tender Value
₹64 L
EMD Value
₹1.3 L
Closing Date
11 Aug 2025, 4:00 pmClosed
Executive Engineer PHE Division Kargil
Executive Engineer PHE Division Baroo Kargil.
Realignment of pipe line/ construction of 05Nos collection chamber coming under the alignment of road widening at L.C road Bhimbat Project Vijayak by 55 RCC Greef (Under BRO Deposit Works).
2025_PWD_17112_1
Fresh E-tender- 72 of PHE Division Kargil of 2025-26
Open Tender
Pipes and Pipe related activities
Item Rate
60 days
LC road Bhimbat
Refer to NIT
3 documents required · 3 mandatory
₹640
Payable To Executive Engineer PHE Division Kargil
₹1.3 L
20 Aug 2025
2 Aug 2025
12 Aug 2025
2 Aug 2025
11 Aug 2025
2 Aug 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .