| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 LAccepted-Finance | ₹7.4 L | L1 | Accepted-Finance L1 |
| 2 | L2₹7.4 LAccepted-Finance HIMACHAL PRADESH HP | ₹7.4 L | L2 | Accepted-Finance L2 |
| Sl No | Description | Qty | Unit | Mukesh Kumar L2 | Maan Singh L1 |
|---|---|---|---|---|---|
| 1.00 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. | 27 | Cum. | 231 ₹6,237 | 231 ₹6,237 |
| 2.00 | Centering and shuttering including strutting, propping etc. and removal of form for :Foundations,footings,bases of columns etc. and mass concrete. | 13.61 | sq.m. | 251 ₹3,416.11 | 251 ₹3,416.11 |
| 3.00 | Columns,pillars,posts and struts.(i) Square, rectangular, polygonal in plan. | 27.33 | sq.m. | 630 ₹17,217.90 | 630 ₹17,217.90 |
| 4.00 | Sides and Soffits of beams, beam haunchings, contiliver girders, bressumers and lintels not exceeding 1 Metre in depth:Beams, cantilivers, girders and lintels | 72.22 | sq.m. | 480 ₹34,665.60 | 480 ₹34,665.60 |
| 5.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size) | 1.8 | Cum. | 5,061 ₹9,109.80 | 5,061 ₹9,109.80 |
| 6.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand) : 3 graded stone aggregate 20 mm nominal size)G/F fo : foundation up to P/L | 5.62 | Cum. | 7,600 ₹42,712 | 7,500 ₹42,150 |
| 7.00 | Lintels, beams girders bressumers and cantilevers : | 5.83 | Cum. | 7,600 ₹44,308 | 7,500 ₹43,725 |
| 8.00 | Column, pillars, posts and struts : | 1.96 | Cum. | 7,600 ₹14,896 | 7,500 ₹14,700 |
| 9.00 | Counter slab : | 0.17 | Cum. | 7,600 ₹1,292 | 7,500 ₹1,275 |
| 10.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete | 1,038.09 | /kg | 95 ₹98,618.55 | 95 ₹98,618.55 |
Tender Value
₹7.5 L
EMD Value
₹22,500
Closing Date
20 Jan 2026, 5:00 pmClosed
DFO Nahan
DFO Office Nahan
Amta beat of Banethi Block Jamta Range
2026_FD_125627_1
6971
Open Tender
Civil Works
40 days
Nahan
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,500
Payable To DFO Nahan
₹22,500
22 Jan 2026
13 Jan 2026
21 Jan 2026
13 Jan 2026
20 Jan 2026
13 Jan 2026
Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.
Centering and shuttering including strutting, propping etc. and removal of form for :Foundations,footings,bases of columns etc. and mass concrete.
Columns,pillars,posts and struts.(i) Square, rectangular, polygonal in plan.
Sides and Soffits of beams, beam haunchings, contiliver girders, bressumers and lintels not exceeding 1 Metre in depth:Beams, cantilivers, girders and lintels
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand) : 3 graded stone aggregate 20 mm nominal size)G/F fo : foundation up to P/L
Lintels, beams girders bressumers and cantilevers :
Column, pillars, posts and struts :
Counter slab :
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:6 (1 cement : 6 coarse sand)
Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level.Cement mortar 1:4 (1 cement :4 coarse sand)
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length ( hold fast lugs or dash fastener shall be paid for separately). Kiln seasoned and chemically treated hollock wood
Providing and fixing 0.50mm ( Zero point FIFty millimeter) thick pre-painted steel sheet of TATA/ /DUROSHINE in roofing with hot dipped metallic zinc coated sheet with top coat of regular modified polyster (RNP) organic coating of 20 ( Twenty ) micron over 5 ( Five ) miocrons primer coating to back coat of polyster of 5 ( Five ) microns over 5 ( Five) microns primer coating including fixing with pre-painted iron J or L hooks, bolts and nuts , 6mm diametre with prepainted limpet and rubber washers complete with all accessories as required .
Providing ridges or hips of width 60 cm overall width plain pre-painted steel sheet fixed with polymer coated J or L hooks,bolts and nuts 8 mm dia G.I. limpet and bitumen washers omplete. 0.50 mm thick with zinc coating not less than 275 gm/m²
Providing and fixing 15 cm wide, 45 cm overall semicircular plain pre-painted steel sheet gutter with iron brackets 40x3mm size, bolts, nuts and washers etc., including making necessary connections with rain water pipes complete. (i) 0.50 mm thick sheet.
Providing and fixing of 40 cm overall width plain pre-painted steel sheet fixed with polymer coated J or L hooks, bolts and nuts, G.l. limpet and bitumen washer complete, in facia. 0.60 mm thick with zinc coating not less than 275 gm/m²
Steel work welded in built up sections,trusses and framed work,including cutting ,hoisting ,fixing in position and applying a priming coat of red lead paint. In gratings framed guard bars,ladders, railling, brackets and similar works
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.10 MB
BOQ_185151.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid