Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.6 LAdmitted-Finance | L1 | Admitted-Finance |
Tender Value
₹1.5 L
EMD Value
₹3,000
Closing Date
18 Jun 2026, 5:00 pmClosed
VDO
Bhonra
Tinshed may Chabutra Nirman karya Shamshan me Gram Dhaba
2026_PRD_567208_5
ZKT2627WSOB00220
Open Tender
Civil Works
Percentage
365 days
GP Bhonra
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MDRISL
₹3,000
7 Jul 2026
12 Jun 2026
22 Jun 2026
12 Jun 2026
18 Jun 2026
12 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation of soil for foundations, trenches, or drains up to a depth of 1.5 meters; ramming the bed; watering; dressing the sides; removing excavated soil; backfilling voids with soil after foundation work; and disposing of surplus soil up to a distance of 50 meters (applicable for hard, clayey, or gravelly soil) (Item No. 2b). | 1 | cum | 161.6 | ₹161.44 |
| 2 | Laying cement concrete for the road foundation, operating needle and surface vibrators, and finishing to the required grade, camber, and super-elevation using 40 mm crushed stone aggregate (Mix 1:4:8). If hand-broken aggregate is used instead of 40 mm machine-crushed stone aggregate, the same quantity will be paid for, but the rate will be reduced by 30% (Item No. 10a). | - | cum | 3,248.39 | - |
| 3 | Stone masonry (coursed rubble) in foundations and plinth using cement-sand mortar (1:6), including filling side gaps/joints and curing (Item No. 29B). | 1 | cum | 2,813.06 | ₹2,810.25 |
| 4 | Complete work of supplying and laying 15 cm high stones for dry soling (kharanja) beneath the flooring (Item No. 65). | 1 | sqm | 179.8 | ₹179.62 |
| 5 | Brick masonry (First Class bricks) in foundations and plinth using lime-sand/lime-surkhi mortar (1:3), including filling side gaps/joints and curing (Item No. 18a). | 1 | sqm | 348.9 | ₹348.55 |
| 6 | Brick masonry (First Class bricks) in foundations and plinth using cement-sand mortar (1:6 or 1:8), including filling side gaps/joints and curing. (item no. 20) | - | sqm | 3,572.14 | - |
| 7 | Cement plaster on walls using a 1:6 cement-sand mix; includes raking out joints and regular curing for 14 days. Thickness: 20 mm. (item no. 77b) | - | sqm | 158.31 | - |
| 8 | Ironwork for grills/gates, etc., involving cutting, assembling, and fixing flat bars, angles, tees, and channels. (item no. 63) | - | kg | 88.42 | - |
| 9 | Supply and installation (complete work) of 0.80 mm thick (22 gauge) corrugated steel sheets, fixed using steel J or L hooks, 8 mm diameter bolts and nuts, and bitumen washers. Cost of trusses and purlins is not included. For a shed size of 18.3 m x 9.1 m (184 sq. m): 54 sheets of size 2.5 m x 0.9 m (121.5 sq. m) and 54 sheets of size 2.8 m x 0.9 m (136.08 sq. m) = 257.58 sq. m. (item no. 54) | 1 | sqm | 645.72 | ₹645.07 |
| 10 | Cement concrete (1:2:4 mix: 1 cement, 2 sand, 4 stone aggregate/brick ballast of 12 mm nominal size); includes laying, ramming, compacting, and curing. Thickness: 50 mm. (item no. 14) | - | sqm | 342.03 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 10.40 MB
Tendernotice_2.pdf
PDF • 10.41 MB
Tendernotice_3.pdf
PDF • 10.39 MB
Tendernotice_4.pdf
PDF • 10.36 MB
Tendernotice_5.pdf
PDF • 10.52 MB
BOQ_1008951.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .