| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.6 CrAdmitted-Finance | ₹11.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹15.5 CrAdmitted-Finance 2ND AND 3RD FLOOR WZ92C RAJA GARDEN RING ROAD NEW DELHI 110015 | WEST | DELHI | 110015 | ₹15.5 Cr | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not Meeting Tender QR |
| Sl No | Description | Qty | Unit | Spar Geo Infra Pvt. Ltd. L2 | MFB GEOTECH PRIVATE LIMITED L1 |
|---|---|---|---|---|---|
| 10.00Non Scheduled ITEMS | |||||
| 10.00 | NS-1
Design, Drawings of cable anchors includingvetting from IIT/NIT for 100T Capacity Ultimate load (60T designed load) as per conditions at site. | 1 | NO | 10,00,000 ₹11.8 L | 1,30,00,000 ₹1.5 Cr |
| 10.00 | NS-2
Mobilization and demobilization for Equipment’s as required for execution of Work. | 1 | LPS | 30,00,000 ₹35.4 L | 1,50,00,000 ₹1.8 Cr |
| 10.00 | NS-3
Test anchors as per Technical Specifications -Horizontal/Inclined Drilling of 150mm diameter hole (including Construction of Platform or similar work necessary for execution of Cable Anchoring work at Flip bucket location of spillway) as per design/drawings through Reinforced Concrete into the Rock/ underlying mass upto the required depth (60m approx. with 15% variation.) including cutting of reinforcement for Installation of Cable Anchor into the rock. The rate shall include all the cost of equipment, tools and Labour and Supply and installation of 100T Capacity Ultimate load (60T designed load) Anchors having yield strength more than 1770 N/mm2 of length as per design/drawings with Single Corrosion Protection including homing of anchors and necessary grouting arrangements, placing of grouting pipes, supply of admixture & grouting (excluding supply of cement). Item includes supply of tendon, with necessary material required for execution, Stressing of anchors including the cost of Stressing material; base plate, bearing plate, Live wedges, MS block & corrosion protection cap.as directed by Engineer- in-Charge. Including all testing equipments required for test to complete. | 3 | NO | 18,00,000 ₹63.7 L | 40,00,000 ₹1.4 Cr |
| 10.00 | NS-4
Horizontal/Inclined Drilling of 150mm diameter hole (including Construction of Platform or similar work necessary for execution of Cable Anchoring work at Flip bucket location of spillway) as per design/drawings through Reinforced Concrete into the Rock/ underlying mass upto the required depth including cutting of reinforcement for Installation of Cable Anchor into the rock as per instruction of Engineer-in charge. The rate shall include all the cost of equipment, tools and Labour etc. | 4,200 | M | 14,700 ₹7.3 Cr | 6,187 ₹3.1 Cr |
| 10.00 | NS-5
Supply and installation of 100T Capacity Ultimate load (60T designed load) (including Construction of Platform or similar work necessary for execution of Cable Anchoring work at Flip bucket location of spillway) Anchors having yield strength more than 1770 N/mm2 of length as per design/drawings with Single Corrosion Protection including homing of anchors and necessary grouting arrangements, placing of grouting pipes, supply of admixture & grouting (excluding supply of cement). Item includes supply of tendon, with necessary material required for execution as directed by Engineer- in-Charge. The rate shall include all the cost of grout mix design, material,equipment, tools and Labour etc. Including Stressing of anchors including the cost of Stressing material; base plate, bearing plate, Live wedges, MS block & corrosion protection cap. | 4,200 | M | 10,400 ₹5.2 Cr | 3,695 ₹1.8 Cr |
| 10.00 | NS-6
Supply and installation of load cell of 150 Ton capacity with digital data logger for each load cell. | 4 | NO | 4,00,000 ₹18.9 L | 3,00,000 ₹14.2 L |
| 10.00 | NS-7
Supply and installation/fixing of MS slotted casing pipe in drilled hole including cost of manpower, material etc. required for completion of work. Dia of casing shall be OD 140mm ( as per Design) 5mm minimum thickness for collapsible strata. | 840 | M | 2,550 ₹25.3 L | 3,512 ₹34.8 L |
| 10.00 | NS-8
Performance of consolidation grouting in loose rock/collapsible strata for making non collapsible holes as approved by Engineer-in-charge with all labour, material, equipment, handling, batching, transporting, testing, mixing, conveying, for all working conditions, preparation of scheme for grouting etc., all complete, as per specifications, drawings and instructions of the Engineer. (excluding cost of cement, admixture) | 20 | MT | 9,000 ₹2.1 L | 3,00,000 ₹70.8 L |
| 10.00 | NS-9
Supply of Ordinary Portland Cement (OPC) for grouting purpose. | 180 | MT | 9,000 ₹19.1 L | 7,200 ₹16.6 L |
Tender Value
₹14.5 Cr
EMD Value
₹20 L
Closing Date
6 Jan 2021, 12:00 pmClosed
Niranjan Naik Sr. Manager-Contracts
Faridabad Gas Power Station Village- Mujedi, PO - Nimka Faridabad 121004
Strengthening of flip bucket by way of installation of cable anchors on the downstream face of flip bucket at NTPC Koldam
2020_NTPC_44567_1
NTPC/SSC - Hydro and DBF(Fbd)/9900212545
Open Tender
Civil Works
150 days
Koldam Hydro Power Station, Barmana, H.P.
As per tender documents
7 documents required · 7 mandatory
₹5,310
NTPC Limited
₹20 L
13 Jan 2021
28 Nov 2020
6 Jan 2021
28 Nov 2020
6 Jan 2021
28 Nov 2020
28 Nov 2020 - 8 Dec 2020
7 Dec 2020
Amount
Non Scheduled ITEMS
NS-1 Design, Drawings of cable anchors includingvetting from IIT/NIT for 100T Capacity Ultimate load (60T designed load) as per conditions at site.
NS-2 Mobilization and demobilization for Equipment’s as required for execution of Work.
NS-3 Test anchors as per Technical Specifications -Horizontal/Inclined Drilling of 150mm diameter hole (including Construction of Platform or similar work necessary for execution of Cable Anchoring work at Flip bucket location of spillway) as per design/drawings through Reinforced Concrete into the Rock/ underlying mass upto the required depth (60m approx. with 15% variation.) including cutting of reinforcement for Installation of Cable Anchor into the rock. The rate shall include all the cost of equipment, tools and Labour and Supply and installation of 100T Capacity Ultimate load (60T designed load) Anchors having yield strength more than 1770 N/mm2 of length as per design/drawings with Single Corrosion Protection including homing of anchors and necessary grouting arrangements, placing of grouting pipes, supply of admixture & grouting (excluding supply of cement). Item includes supply of tendon, with necessary material required for execution, Stressing of anchors including the cost of Stressing material; base plate, bearing plate, Live wedges, MS block & corrosion protection cap.as directed by Engineer- in-Charge. Including all testing equipments required for test to complete.
NS-4 Horizontal/Inclined Drilling of 150mm diameter hole (including Construction of Platform or similar work necessary for execution of Cable Anchoring work at Flip bucket location of spillway) as per design/drawings through Reinforced Concrete into the Rock/ underlying mass upto the required depth including cutting of reinforcement for Installation of Cable Anchor into the rock as per instruction of Engineer-in charge. The rate shall include all the cost of equipment, tools and Labour etc.
NS-5 Supply and installation of 100T Capacity Ultimate load (60T designed load) (including Construction of Platform or similar work necessary for execution of Cable Anchoring work at Flip bucket location of spillway) Anchors having yield strength more than 1770 N/mm2 of length as per design/drawings with Single Corrosion Protection including homing of anchors and necessary grouting arrangements, placing of grouting pipes, supply of admixture & grouting (excluding supply of cement). Item includes supply of tendon, with necessary material required for execution as directed by Engineer- in-Charge. The rate shall include all the cost of grout mix design, material,equipment, tools and Labour etc. Including Stressing of anchors including the cost of Stressing material; base plate, bearing plate, Live wedges, MS block & corrosion protection cap.
NS-6 Supply and installation of load cell of 150 Ton capacity with digital data logger for each load cell.
NS-7 Supply and installation/fixing of MS slotted casing pipe in drilled hole including cost of manpower, material etc. required for completion of work. Dia of casing shall be OD 140mm ( as per Design) 5mm minimum thickness for collapsible strata.
NS-8 Performance of consolidation grouting in loose rock/collapsible strata for making non collapsible holes as approved by Engineer-in-charge with all labour, material, equipment, handling, batching, transporting, testing, mixing, conveying, for all working conditions, preparation of scheme for grouting etc., all complete, as per specifications, drawings and instructions of the Engineer. (excluding cost of cement, admixture)
NS-9 Supply of Ordinary Portland Cement (OPC) for grouting purpose.
NS-10 Supply of Micro-fine cement
NS-11 Supply of Admixture
NS-12 Redrilling of 150mm dia hole for cable anchoring as per instruction of Engineer-in charge
Amount linked to Safety Aspects / compliance to Safety Rules
Minimum percentage of total Contract price linked to Safety Aspects/ compliance to Safety Rules’: 2 %
Spar Geo Infra Pvt. Ltd.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
Tendernotice_1.pdf
PDF • 0.15 MB
Annexure-B-GCC.pdf
Tender Documents • 1.05 MB
SECTION-VIII-Forms-and-Procedures.pdf
Tender Documents • 1.34 MB
SECTION-IV-GCC-Civil.pdf
Tender Documents • 3.43 MB
SECTION-III-BDS.pdf
Tender Documents • 0.17 MB
SECTION-II-InstructionsToBidders.pdf
Tender Documents • 0.31 MB
SECTION-VI-SOW-TS-DRAWINGS-RFQP.pdf
Tender Documents • 1.81 MB
SECTION-V-SCC.pdf
Tender Documents • 0.12 MB
Integrity-Pact.pdf
Tender Documents • 0.30 MB
Format-for-DeedofJointUndertaking.pdf
Tender Documents • 0.10 MB
Banning_Policy_Rev_1.pdf
Tender Documents • 0.41 MB
BOQ_47678.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid