Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance PLOT NO 195 QUAY STREET OPP NAGINA HOTEL DARUKHANA REAY ROAD EAST MUMBAI MAHARASHTRA 400010 | MUMBAI SUBURBAN | MAHARASHTRA | 400010 | Admitted-Finance |
| 4 | Admitted-Finance 31 NEELGIRI IND ESTATE T J ROAD SEWRI W MUMBAI MAHARASHTRA 400015 | MUMBAI | MAHARASHTRA | 400015 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
5 Mar 2021, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Sagar Shende, M(C-Refit)
OTS Dept, 6th Floor
Normal Refit of ICGS Savitribai Phule for offloading refit job
2021_MDL_85144_2
2500000024
Limited
Miscellaneous Services
Turn-key
120 days
MDL Mumabi
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
Exempted
16 Mar 2021
25 Feb 2021
5 Mar 2021
25 Feb 2021
5 Mar 2021
25 Feb 2021
60 days
Amount
ECHO SOUNDER, QTY:01 NO, MAKE: RAYTHEON, MODEL : GDS 101 (JOBS TO BE UNDERTAKEN BY PACFIRM), PAC: M/S ELCOME MARINE, ROUTINE: REFIT
Check the performance of equipment and accuracy of reading before dry docking. One in no. Transducer to be cleaned by using a plastic scraper or scrubbing brush. Casing of transducer to be proved for any water ingress. Calibrate during sea trials. Overall performance to be proved.
EM LOG, QTY:01 NO, MAKE: SAGEM , FRANCE, MODEL: LH 92, (JOBS TO BE UNDERTAKEN BY PAC FIRM ), ROUTINE: REFIT
Clean the pickup head sensor and check the watertight socket for watertight integrity. Prove the performance of the system prior undocking with simulator. Calibration of log to be carried out during sea trials. Connect a pick up head ‘simulator’ and check on the one hand that the speed displayed increases towards a balance value equal to 20 Knts, roughly (+/- 5 knts) and check distance run indicator is in accordance with the speed displayed.
Overhaul the complete system and full performance check is to be carried out. Clean the exterior of electronic cabinet and repeater. Open the cabinet and clean it with vacuum cleaner and check the tightness of all connections.
MAIN SWITCH BOARD, QTY:01 NO, MAKE: MARINE ELECTRICALS, GOA , ROUTINE: REFIT
Three in nos supply breakers (TP, 250 A, motor mechanism 220 V Make: Merlin Gerin)) and one in no shore supply breaker (Make: Merlin Gerin, Model: NS 160N, 160A) to be overhauled. All breakers to be proved on completion of overhauling with full load current and to be calibrated for overload and under voltage protection. Carryout insulation resistance test of beakers and associated controls (Minimum- 1 M Ohm). Before carryout insulation test all the rectifier be disconnected. On no account of a full megger voltage to be supplied across the rectifier. Accuracy of synchroscope is to be checked with 3-lamp method.
06 in nos Aux contactors, (6A, Make Siemens) and 03 in nos Reverse Power Relays (Make: Selco, T2000) to be overhauled. Tighten all nut bolts. Test and ensure the continuity resistance of earthing if less than 0.05 ohm.
Shock vibration mounting to be cleaned. Renew deteriorated rubber components. Ensure all nuts and bolts are tight and earthing strap intact. Test and ensure the continuity resistance of earthing if less than 0.05 ohm. All MSB locking mechanism to be renewed.
Following meters (Make: Rishabh Electricals, Andheri, Mumbai) to be calibrated 415 Volt Section Volt meter- 04 Nos. Ammeter-04 Nos KW meter – 03 Nos, Power factor meter-03 Nos Frequency meter – 04 Nos Double frequency meter- 01 No Double volt meter – 01 No Synchroscope – 01 No
Check the complete MSB wiring condition and to be renewed if required.
03 in nos DA’s are not sharing equal load while parallel operation. Droop adjustment setting and paralleling operation to be proved.
MAIN GENERATOR, QTY: 03 NO, (120 KW –02 NOS , 80 KW –01 NO) 415 V , 3 PH , 50 HZ) MAKE: STAMFORD, UK, ROUTINE : REFIT
Check steady state of generators (RPM, voltage, frequency and droop response). Inspect the winding, improve insulation. Overhaul the full generator assembly including AVR, battery circuit&self-starting motor, Dynamo motor and space heater. Cleaning of carbon deposition on coil, Inspection of rectifier unit, generator winding, rotating diode, surge suppressor bearing. Check the capacity of the generator with full load trials using load tank, for example 100%, 75% & 50%. All control panel locking mechanism to be renewed.
Following safety trips and alarm along with sensors for all the main DA control panel to be calibrated and proved for operation. Defect if any to be rectified. Low Lub Oil Pressure High water temperature Over speed trip High Lub Oil Temperature
Following control panel gauges are to be calibrated and proved: Lub oil pressure gauge Fresh water temperature gauge RPM gauge. Lub Oil Temperature Sea Water pressure
E/R VENTILATION FAN MOTORS AND STARTERS, ROUTINE: REFIT overhauled. Checking insulation and varnishing of motor winding. Examine rotor impeller shaft & bearing housing for flaws, cracks or corrosion. Renewal of bearing, seals. Balance of rotor. Repair of terminal box and replacement of nuts & bolts. Painting of motor body. Prepare the foundation for motor fitment. Carry out running test after assembling & installation onboard ship. Complete control panel to be overhauled. Renew all deteriorated internal wiring. Calibrate overload relay by current injection test set. Control panel locking mechanism to be renewed. Overhauling of starters includes carrying out routine test and adjustment of over current devices as laid down in the instructions for use of “Current Injection Test set “.
FWD E/R VENTILATION FAN MOTORS (9.3KW, 02 Nos) Rating 12.5 HP
FWD E/R VENTILATION FAN MOTORS (3.7 KW, 02 Nos) Rating 5 HP
AFT E/R VENTILATION FAN MOTORS (9.3 KW, 01 No) Rating 12.5 HP
AFT E/R VENTILATION FAN MOTORS (3.7 KW, 01 Nos) Rating 5 HP
FUEL OIL TRANSFER PUMP MOTORS, MAKE: CROMPTON GREAVES , 5HP ,02 NOS ROUTINE : REFIT
Pump Motor (5HP),02 Nos to be overhauled. Checking insulation and varnishing of motor winding. Examine rotor impeller shaft & bearing housing for flaws, cracks or corrosion. Renewal of bearing, seals. Repair of terminal box and replacement of nuts & bolts. Painting of motor body.Prepare the foundation for motor fitment. Carry out running test after assembling & installation onboard ship.
Complete control panel to be overhauled. Calibrate overload relay by current injection test set. Renew all deteriorated internal wiring. Control panel locking mechanism to be renewed.
GENERAL MOTORS AND STARTERS, ROUTINE: REFIT Motors to be overhauled. Checking insulation and varnishing of motor winding. Examine rotor impeller shaft & bearing housing for flaws, cracks or corrosion. Renewal of bearing, seals. Balance of rotor. Repair of terminal box and replacement of nuts & bolts. Painting of motor body. Prepare the foundation for motor fitment. Carry out running test after assembling & installation onboard ship. Complete control panel to be overhauled. Calibrate overload relay by current injection test set.Renew all deteriorated internal wiring. Control panel locking mechanism to be renewed. (LA 5019 to LA 5026)
TOILET EXHAUST FAN MOTOR (0.55 KW, 01No)
AMMUNITION LOCKER EXHAUST FAN MOTOR (0.18 KW, 01No)
BATTERY COMPT. FAN (0.18 KW, 01No)
EMERGENCY DA COMPT. EXHAUST FAN ( 230V ,0.11KW, 01No)
VICTUALLING STORE SUPPLY FAN (230V, 0.11 KW, 01 No)
BAGGAGE STORE SUPPLY FAN (230V, 0.11 KW, 01 No)
ENGG. STORE COMPT. SUPPLY FAN (230V, 0.11 KW, 01 No)
ATU COMPT. SUPPLY FAN (230V, 0.11 KW, 01 No)
GALLEY, PANTRY VENTILATION FAN MOTORS AND STARTERS: ROUTINE: REFIT Motors to be overhauled. Checking insulation and varnishing of motor winding. Examine rotor impeller shaft & bearing housing for flaws, cracks or corrosion. Renewal of bearing, seals. Balance of rotor. Repair of terminal box and replacement of nuts & bolts. Painting of motor body. Prepare the foundation for motor fitment. Carry out running test after assembling & installation onboard ship. Complete control panel to be overhauled. Calibrate overload relay by current injection test set. Renew all deteriorated internal wiring. Control panel locking mechanism to be renewed.(LA 5027 to LA 5029)
GALLEY SUPPLY FAN MOTOR (0.37 KW, 01No)
GALLEY EXHAUST FAN MOTOR (0.75 KW, 01No)
PANTRY EXHAUST FAN MOTOR (230V, 0.11KW, 01No)
CAPSTAN MOTOR , QTY-01NO (4 KW, 415 V , 3 Ph , 50 Hz) MAKE: SEC , HOLLANDROUTINE : REFIT
Motor to be overhauled. Checking insulation and varnishing of motor winding. Examine rotor, impeller, shaft and bearing housing for flaws, cracks or corrosion, make good or replace as necessary. Renewal of bearings. Balancing of rotor. Repair of terminal box and replacements of nuts & bolts. Prepare the foundation for motor fitment. Overhaul the motor controller, heater assembly, associated gear component and remote controller. Spray Painting of motor body. Carry out Running test after assembling &installation onboard ship. Prove the performance of motors at high speed on full load. Complete control panel to be overhauled. Calibrate overload relay by current injection test set. Renew contactor kits, indication lamps and fuse bases/carriers. Renew all deteriorated internal wiring. Control panellocking mechanism to be renewed. Locking Mechanism and hinges of Remote Operating control panel to be renewed. Remote operation of capstan from RCU (Remote Control Unit) at Quarterdeck to be proved.
ANCHOR WINDLASS MOTORS, QTY-02NOS ( 4 KW, 415V , 3Ph , 50Hz) MAKE: SEC , HOLLAND ROUTINE : REFIT
Both the motors to be overhauled. Checking insulation and varnishing of motor winding. Examine rotor, impeller, shaft and bearing housing for flaws, cracks or corrosion, make good or replace as necessary. Renewal of bearings. Balancing of rotor. Repair of terminal box and replacements of nuts & bolts. Prepare the foundation for motor fitment. Overhaul the motor controller, E/M brake, heater assembly, associated gear component and remote controller. Spray Painting of motor body. Carry out running test after assembling &installation onboard ship. Prove the performance of motors at low/ high speed on full load. Both control panels to be overhauled. Calibrate overload relay by current injection test set. Renew contactor kits, indication lamps and fuse bases/carriers. Renew all deteriorated internal wiring. Control panel locking mechanism to be renewed.
AC COMPRESSOR MOTORS- QTY: 02 NOS, 415 V, 3 PH, 50 HZ (MAKE: BOCK, GERMANY), ROUTINE: REFIT Both the motors to be overhauled. Checking insulation and varnishing of motor winding. Examine rotor impeller shaft & bearing housing for flaws, cracks or corrosion. Renewal of bearing, seals. Balance of rotor. Repair of terminal box and replacement of nuts & bolts. Painting of motor body. Prepare the foundation for motor fitment. Carry out running test after assembling & installation onboard ship. Complete control panel to be overhauled. Calibrate overload relay by current injection test set.Renew all deteriorated internal wiring. Control panel locking mechanism to be renewed.
AHU motor (15 KW, 415 V, 3 Ph, 50 Hz)- 01 No
A/C sea water pump motor (2.2 KW, 415 V, 3 Ph, 50 Hz)- 01 No
FCU motors (0.36 KW, 415 V, 3 Ph, 50 Hz )- 02 Nos
A/C CONTROL PANEL (MAKE: ELECTRONIC CONTROL CORPORATION, KOLKATA ) 415 V , 50 HZ , 3 PH)
06 nos pressure cut-outs and 05 nos thermostats (Make: Danfoss) to be calibrated and proved with the system.
Complete control panels to be be cleaned by contactor cleaner and soft brushes. 23 nos contactors (09 in nos 25 A, 04 in nos 16 A, 10 in nos 6 A contactors), to be cleaned. 06 in nos overload relays (45- 75 A – 02 Nos, 14 –23 A) – 01 No, 3-5 A –01 No, (0.3 – 0.5 A –02) to be calibrated by current injection method. Star/Delta Timers (03 Nos) to be calibrated (Make: Siemens).Renew all deteriorated internal wiring. Control panel locking mechanism to be renewed.
REVERSE OSMOSIS PLANT , MAKE: ROCHEM, MUMBAI, TYPE: RO 0510 DT 02-055, (JOB TO BE UNDERTAKEN BY OEM M/S ROCHEM), ROUTINE : REFIT
Calibrate hand conductivity meter. Clean conductivity meter probe and calibrate.
Complete control panel to be overhauled. Overhauling includes: Replace circuit breakers and contractors As required Check and replace PT 60 and potentiometer Inspect and calibrate HP & LP pressure gauges Carry out the functional checks of microprocessor. Calibrate PS-51, PS-71 & PS-81. Renew all deteriorated internal wiring.
Pre filter pump motor (0.37KW) to be overhauled. Checking insulation and varnishing of motor winding. Examine rotor impeller shaft & bearing housing for flaws, cracks or corrosion. Renewal of bearing, seals. Balance of rotor. Repair of terminal box and replacement of nuts & bolts. Painting of motor body. Prepare the foundation for motor fitment. Carry out running test after assembling & installation onboard ship.
Filter pump motor (0.37 KW) to be overhauled. Checking insulation and varnishing of motor winding. Examine rotor impeller shaft & bearing housing for flaws, cracks or corrosion. Renewal of bearing, seals. Balance of rotor. Repair of terminal box and replacement of nuts & bolts. Painting of motor body. Prepare the foundation for motor fitment. Carry out running test after assembling & installation onboard ship
Inspect and carry out functional test of all solenoid valves. Check the operation of servo motor control valve.
Hp Pump Motor (2.2 KW) to be overhauled. Checking insulation and varnishing of motor winding. Examine rotor impeller shaft & bearing housing for flaws, cracks or corrosion. Renewal of bearing, seals. Balance of rotor. Repair of terminal box and replacement of nuts & bolts. Painting of motor body. Prepare the foundation for motor fitment. Carry out running test after assembling & installation onboard ship.
FRESH WATER PUMP MOTOR - 02 Nos 1.5 KW 415V ,50HZ, 3PH MAKE: CROMPTON GREAVES, ROUTINE REFIT
One in no pressure switch (0-6 Kg / cm2) Make: Indfos, to be calibrated. System to be proved for auto pressure cut-out/cut-in operation after calibration.
Fresh water Hydrophore Pump Motor, (Make: Crompton Greaves, 1.1 KW, 02 Nos) to be overhauled. Checking insulation and varnishing of motor winding. Examine rotor impeller shaft & bearing housing for flaws, cracks or corrosion. Renewal of bearing, seals. Balance of rotor. Repair of terminal box and replacement of nuts & bolts. Painting of motor body. Prepare the foundation for motor fitment. Carry out running test after assembling & installation onboard ship.
Complete control panel to be overhauled. Calibrate overload relay by current injection test set. Renew all deteriorated internal wiring. Control panel locking mechanism to be renewed.
SHOWER & BILGE PUMP MOTOR- 02 Nos (0.56 KW, 415 V ,50 Hz, 3Ph) MAKE: KIRLOSKAR ELECTRIC CORPORATION, ROUTINE : REFIT
Low/High-level float switches (02 nos each) to be removed, overhauled and system to be proved for cut-in/ cut-out in auto mode.
Motor (0.56 KW, 02 Nos) to be overhauled. Checking insulation and varnishing of motor winding. Examine rotor impeller shaft & bearing housing for flaws, cracks or corrosion. Renewal of bearing, seals. Balance of rotor. Repair of terminal box and replacement of nuts & bolts. Painting of motor body. Prepare the foundation for motor fitment. Carry out running test after assembling & installation onboard ship.
Complete control panel to be overhauled. Calibrate overload relay by current injection test set. Renew all deteriorated internal wiring. Control panel locking mechanism to be renewed.
Water jet Exhaust Fan motor (0.37KW, 415V 03PH, 01 No) to be overhauled. Checking insulation and varnishing of motor winding. Examine rotor impeller shaft & bearing housing for flaws, cracks or corrosion. Renewal of bearing, seals. Balance of rotor. Repair of terminal box and replacement of nuts & bolts. Painting of motor body. Prepare the foundation for motor fitment. Carry out running test after assembling & installation onboard ship. Complete control panel to be overhauled. Calibrate overload relay by current injection test set.Renew all deteriorated internal wiring. Control panel locking mechanism to be renewed.
STP PLANT, MODEL : ST 2A ,MAKE: HAMWORTHY, ROUTINE : REFIT
STP Ejector Pump Motor, Make: VEM Motors, GmbH, Germany (4KW, 02 Nos) to be overhauled. Checking insulation and varnishing of motor winding. Examine rotor impeller shaft & bearing housing for flaws, cracks or corrosion. Renewal of bearing, seals. Balance of rotor. Repair of terminal box and replacement of nuts & bolts. Painting of motor body. Prepare the foundation for motor fitment. Carry out running test after assembling & installation onboard ship.
STP Discharge Pump Motor Make: VEM Motors, GmbH, Germany (4KW 01 No) to be overhauled. Checking insulation and varnishing of motor winding. Examine rotor impeller shaft & bearing housing for flaws, cracks or corrosion. Renewal of bearing, seals. Balance of rotor. Repair of terminal box and replacement of nuts & bolts. Painting of motor body. Prepare the foundation for motor fitment. Carry out running test after assembling & installation onboard ship.
Complete control panel to be overhauled. All overload relays to be calibrated by current injection test set. Renew all deteriorated internal wiring. Control panel locking mechanism to be renewed. 02 in no’s overload relays:6 –10 A 02 in no contactor of ejector pump : 0.63 – 1.0A 02 no pressure switch (-0.6 - -0.2 bar) to be proved for satisfactory cut in and cut out.
OILY BILGE WATER SEPARATOR, MODEL: ILD-1, MAKE: SUYASH ENTERPRISES, PUNE, ROUTINE : REFIT
Overhaul all interlock relays, controller unit, 03 nos capacitance probes, 02 nos solenoid valves. Overload relay to be calibrated. Optical cell to be removed cleaned and calibrated. System to be proved for manual and auto mode.
Motors (0.56KW) to be overhauled. Checking insulation and varnishing of motor winding. Examine rotor impeller shaft & bearing housing for flaws, cracks or corrosion. Renewal of bearing, seals. Balance of rotor. Repair of terminal box and replacement of nuts & bolts. Painting of motor body. Prepare the foundation for motor fitment. Carry out running test after assembling & installation onboard ship.
Complete control panel to be overhauled. Complete control panel to be overhauled. Calibrate overload relay by current injection test set. Renew all deteriorated internal wiring. Control panel locking mechanism to be renewed.
GARBAGE DISPOSAL UNIT, MODEL : FW 330S, MAKE: KRISTENGG, ROUTINE : REFIT
Overhaul the motor (1.1 KW) and insulation to be recorded prior and after overhauling. Checking insulation and varnishing of motor winding. Examine rotor impeller shaft & bearing housing for flaws, cracks or corrosion. Renewal of bearing, seals. Balance of rotor. Repair of terminal box and replacement of nuts & bolts. Painting of motor body. Prepare the foundation for motor fitment. Carry out running test after assembling & installation onboard ship. System to be proved on completion.
Complete control panel to be overhauled. Calibrate Overload relay (1-1.6 A) (Make: Siemens) by current injection test set. Renew all deteriorated internal wiring. Control panel locking mechanism to be renewed. Deteriorated rubber biding to be replaced.
FUEL OIL PURIFIER, MODEL: MMPX 404 SGP-11, CAPACITY: 2000 LTRS/HR, MAKE: ALFA LAVEL, ROUTINE : REFIT
Feed Pump motor (1.1 kW 415 V, 3 Ph, 50 Hz, Make: Bharat BijaliLtd to be overhauled. Checking insulation and varnishing of motor winding. Examine rotor impeller shaft & bearing housing for flaws, cracks or corrosion. Renewal of bearing, seals. Balance of rotor. Repair of terminal box and replacement of nuts & bolts. Painting of motor body.Prepare the foundation for motor fitment. Carry out running test after assembling & installation onboard ship.
Separator motor (3 KW,415 V, 3 Ph, 50 Hz, Make: Bharat Bijali Ltd) to be overhauled. Checking insulation and varnishing of motor winding. Examine rotor impeller shaft & bearing housing for flaws, cracks or corrosion. Renewal of bearing, seals. Balance of rotor. Repair of terminal box and replacement of nuts & bolts. Painting of motor body. Prepare the foundation for motor fitment. Carry out running test after assembling & installation onboard ship.
Complete control panel to be overhauled and all interlock relays. Calibrate 02 in nos over load relays. (4-6 A)(Make: Siemens) and solenoid valves for controller unit and system to be proved. Renew all deteriorated internal wiring. Control panel locking mechanism to be renewed.
FUEL OIL PURIFIER, MODEL: MMPX 404 SGP-11, CAPACITY: 2000 LTRS/HR, MAKE: ALFA LAVEL, ROUTINE : REFIT
Both motors to be overhauled and insulation to be recorded prior and after overhauling. Checking insulation and varnishing of motor winding. Examine rotor impeller shaft & bearing housing for flaws, cracks or corrosion. Renewal of bearing, seals. Balance of rotor. Repair of terminal box and replacement of nuts & bolts. Painting of motor body. Prepare the foundation for motor fitment. Carry out running test after assembling & installation onboard ship.
Overhaul 02 in no. control panels. 02 in Nos overload relays (7 – 10 A) (Make: Siemens) to be calibrated by current injection test set. 02 in Nos Regulated Pressure Switches (0-40 bar) to be calibrated and proved (Make: Danfoss). Renew all deteriorated internal wiring.
BILGE &GS PUMP MOTOR ,QTY – 01 NO (9.3 KW, 415 V, 50 HZ 3 PH) MAKE: CROMPTON GREAVES/ JOHNSON PUMP, ROUTINE : REFIT
Overhaul complete control panels. Overload relay of control panel to be calibrated by current injection test set. (Make: Siemens, 10-14.5, 2.5 – 4A). Renew all deteriorated internal wiring.
Bilge &GS PUMP, Make: Crompton Greaves (9.3KW) to be overhauled. Checking insulation and varnishing of motor winding. Examine rotor impeller shaft & bearing housing for flaws, cracks or corrosion. Renewal of bearing, seals. Balance of rotor. Repair of terminal box and replacement of nuts & bolts. Painting of motor body. Prepare the foundation for motor fitment. Carry out running test after assembling.
EMERGENCY D/A (MAKE: HONDA MODEL: EU70is TYPE: 5.5KVA, 230V AC, 50 HZ), ROUTINE : REFIT
Supply cable from Emergency DA to Emergency DA switch board is weakened and heating. Cable to be renewed and proved for satisfactory operation. (3 X 6 Sq mm Copper cable)
FIRE &GS PUMP MOTOR ,QTY – 01 NO (9.3 KW, 415 V, 50 HZ 3 PH) , MAKE: CROMPTON GREAVES/ JOHNSON PUMP, ROUTINE : REFIT
Fire &GS PUMP motor, (Make: Crompton Greaves, 9.3KW) to be overhauled. Checking insulation and varnishing of motor winding. Examine rotor impeller shaft & bearing housing for flaws, cracks or corrosion. Renewal of bearing, seals. Balance of rotor. Repair of terminal box and replacement of nuts & bolts. Painting of motor body. Prepare the foundation for motor fitment. Carry out running test after assembling & installation onboard ship.
Overhaul complete control panel. Overload relays to be calibrated by current injection test set. (Make: Siemens, 10-14.5, 2.5 – 4A). Renew all deteriorated internal wiring.
COOKING RANGE, QTY:01 SET, ( 10.5 KW 415 V, 3 Ph, 50 HZ, ), MAKE: KANTILAL CHUNILAL, SURATROUTINE : REFIT
Remove hot plate and dip tray and clean them properly. Replace all securing nut/bolts. (12 nos, Mat: SS). Paint hot plate bearers and mild steel surface using heat resisting paint (Approx. area 02 sq ft.). Properly re-fix hot plates and dip tray on completion of the work.
Remove both side screens and bottom cover of ovens. Clean inside thoroughly and prove the system.
15 LTR WATER BOILER, QTY:01 NO, 415 V, 3 Ph, 50 HZ, 3.5 KW, MAKE: KANTILALCHUNILAL, SURAT ROUTINE : REFIT
Dismantle the water boiler from its position after disconnecting water & electrical connection. Dismantle the heating elements and clean or rescale them thoroughly. Complete control panel to be overhauled. Check the switches, fuses Renew all deteriorated internal wiring. Clean 01 no thermostat (30 – 1100 Celsius), load contactor (12A, 440V) and dry cut-out (7” long steam type).Control panel locking mechanism to be renewed. Water boiler to be proved for satisfactory operation.
Calibration of voltmeter (0-500V), Ammeter (0-150A), energy meter and phase sequence meter to be carried out.
Check earthing strap. Ensure all nuts & bolts are tight & earthing strap intact. Test that continuity resistance of earthing strap is less than 0.05 Ohm measured with Megger.
ELECTRIC SIREN, QTY:01 , MAKE: ZOLLNER / KRIST, ROUTINE : REFIT
Overhaul the equipment completely including control unit and 03 no Remote push button and 01 in no Motor (230V, 0.5KW, single phase).Checking insulation and varnishing of motor winding. Examine rotor impeller shaft & bearing housing for flaws, cracks or corrosion. Renewal of bearing, seals. Balance of rotor. Repair of terminal box and replacement of nuts & bolts. Painting of motor body. Prepare the foundation for motor fitment. Carry out running test after assembling & installation onboard ship. Check the components showing ageing and sign of deterioration. Check all weather sealing gaskets.
AIR HORN, QTY:01, MAKE: ZOLLNER / KRIST, ROUTINE : REFIT
Overhaul the equipment. Replace all defective/deteriorated components
SEARCH LIGHT (1000 W, 230 V AC), QTY:01 NO, MAKE: FRANCIS, ENGLAND, TYPE – FR300 RC,
Overhaul the rotating mechanism/ motor gear assembly including power supply unit in Bridge console and control panel and prove for satisfactory operation. Renew all internal wiring in bridge console and control panel. On completion of overhauling, system to be proved for watertight integrity.
SIGNALING PROJECTORS (250 W,230 V AC), QTY:02 NOS) MAKE: RAY ENTERPRISES -01 AND AJMERA – 01
Overhaul both signaling projectors. Job involves reassembling of units, cleaning of glass, recoating of reflectors, renewal of gaskets and springs. Signaling projectors are to be proved for satisfactory operation.
GYRO COMPASS/MAGNETIC COMPASS/STEERING STAND WITH AUTO PILOT ,QTY: 01 NO EACH MAKE: RAYTHEON, GERMANY MODEL – STD 20 WITH TMC( JOBS TO BE UNDERTAKEN BY PAC FIRM) ROUTINE: REFIT
Complete gyrocompass to be overhaul. Change the supporting liquid ‘O’ rings/gaskets and fused bulbs. Renew all deteriorated internal wiring. Readjust all parameter after completion of overhauling for optimum performance.
Align 05 nos slave repeaters (360 degree card and Analog Card) with master gyro and prove the interface with Radar and ECDIS.
STEERING STAND WITH AUTO PILOT ,QTY: 01 NO, MAKE: RAYTHEON, GERMANY ( JOBS TO BE UNDERTAKEN BY PAC FIRM) ROUTINE: REFIT
Complete steering stand with auto pilot to be overhauled. Inspect the wiring / unit / sub-unit and PCBs, renew them wherever necessary. Renew all deteriorated internal wiring. After completion of overhauling system to be proved for optimum performance.
MCS/RCS/WJ-5 Type : II MAKE: MTU, GERMANY, ( JOBS TO BE UNDERTAKEN BY OEM/PAC FIRM) ,ROUTINE: REFIT
02 in nos shaft seal flow sensor malfunctioning, to be replaced and satisfactory operation to be proved. Sensor – CG Supply.
06 Nos fuel Tank and 01 fresh water tank level sensors showing erratic reading, sensors to be removed, cleaned. Tank level calibration to be carried out in MCS and reading to be matched as per physical sounding and proved.
17 Nos Door / hatches sensors to be removed cleaned and fitted. Sensors to be adjusted to make contact on door/hatch closing. Sensor to be proved for satisfactory operation.
STEERING GEAR SYSTEM, QTY-03 NOS
Complete system to be overhauled and alignment of system. Motors to be overhauled. Checking insulation and varnishing of motor winding. Examine rotor impeller shaft & bearing housing for flaws, cracks or corrosion. Renewal of bearing, seals. Balance of rotor. Repair of terminal box and replacement of nuts & bolts. Painting of motor body. Prepare the foundation for motor fitment. Carry out running test after assembling & installation onboard ship.
Complete control panel to be overhauled. Carry out routine test and Calibrate overload relay by current injection test set. Renew all deteriorated internal wiring.
DISTRIBUTION & LIGHTING PANELS (MAKE: FABRICONS MUMBAI MODEL: 415 3PH& 230V 50HZ ,1PH ROUTINE : REFIT
06 nos 230V DB & 04nos 415V DB and 04 nos 24V DB to be overhauled. Job involves opening of all components, renew all deteriorated internal wiring, cleaning and painting, Lubrication of hinges. Replace locking mechanism as per sample. tests to prove the system and compare with test/ trial report. (h) Check and replace earth straps. Sl Description Rating (KW) Qty (nos.) (a) Bilge & GS Pump Motor 9.3 01, (b) Fire & GS Pump Motor 9.3 01, (c) AHU Motor 7.5 01, (d) Air Compressor Motors 7.5 02, (e) Fuel Oil Purifier Separator Motor 4.0 01, (f) AC Condenser pump No.1& 2 3.7 02, (g) Fuel Oil Transfer Pump 3.7 02, (h) Oily Bilge Water Separator Motor 3.2 01, (j) Fresh Water Hydrophore Pump Motor 2.24 02, (k) Grey Water Pump Motor 3.7 01 (l) W/J Hydraulic Pump No 1,2 &3 2.2 03, (m) Fwd Engine Room Ventilation Fan 11 02 (n) Aft Engine Room Ventilation Fan 11 01, (p) Aux equip room /Naval Store Supply Fan 0.37 01, (q) EDG Room Ventilation Fan 0.10 01, (r) Magazine Room Exhaust Fan 0.37 01, (s) Galley Supply Fan 0.37 01, (t) Galley Exhaust Fan 0.37 01, (u) Water Jet Compartment Supply Fan 0.37 01, (v) Sanitary Space Exhaust Fan 0.37 01, (x) Battery Room Exhaust Fan 0.188 01, (y) Paint Store Exhaust Fan 0.188 01, (z) STP Compartment Supply Fan 0.37 01, (aa) Baggage/ Victualling Store Fan 0.504 01, (ab) Garbage Disposal Unit 0.75 01, (ac) Electric motor for Crane 03 01, (ad) W/R pantry exhaust fan 90W 01
ECDIS (MAKE: RAYTHEON, GERMANY), MODEL: SYNAPSIS NX, (JOBS TO BE UNDERTAKEN BY PAC FIRM), ROUTINE : REFIT
Missing feed from sensors like Gyro, GPS, AIS and LOG interfaced with ECDIS is observed intermittently. Defect to be investigated and rectified.
GMDSSHF TX/RX –TRP-9000 WITH DSC – 01 NOS, MAKE: SKANTI, ROUTINE : REFIT
Inspect all the sub units / main unit and the circuit condition whether any damage/deterioration occurred. Renew all the damage/deteriorated components. Check wiring for deterioration and replace apparently deteriorated wiring. Overhaul the sets completely and prove for satisfactory operation. Thoroughly carry out the full performance checks of receivers. NOTE :Along with each set a test sheet is delivered in which some of the measurements made at the factory are listed. If the performance checks does not show the same value as those on the test sheet the set must be adjusted as described under adjustment procedure given in instruction / user book of receivers, transmitters and power supply unit.
VHF 1000WITH DSC – 01 NOS, MAKE: SKANTI, ROUTINE : REFIT
Inspect all the sub units / main unit and the circuit condition whether any damage/deterioration occurred. Renew all the damage/deteriorated components. Check wiring for deterioration and replace apparently deteriorated wiring. Overhaul the sets completely and prove for satisfactory operation. Thoroughly carry out the full performance checks of receivers.
MB/SRE SYSTEM, TYPE- 3 X 100 WattMAKE: AMPLIDAN, DENMARK
Over all the complete system. Replace aged / deteriorated components/wiring and full performance check is to be carried out.
Microphone connection point in Quarterdeck and Foxle defective. Renew call point PCB, connectors and connection box. System to be proved for satisfactory operation. All in way jobs to be included.
Short circuit indicator glowing in MB/SRE rack for Zone 1, 2 and 3 intermittently. Suspect defect occurring due to Weakened cables. Weakened cables to be identified and replaced. Defect to be investigated and satisfactory operation to be proved.
NAVIGATION LIGHTS, (MAKE: AQUA SIGNAL) CONTROL PANEL, (MAKE: MARINE ELECTRICAL)
Navigation Light Control Panel (DC) to be overhauled and functional checks to be carried out. Renew all deteriorated internal wiring. Control Panel to be proved for satisfactory operation.
MACHINERY CONTROL CONSOLE, MAKE: MARINE ELECTRICALS/MINILEC
Indication of Auxiliary panel, aux vent panel, alarm panel & DG remote control panel is malfunctioning. Indication/operation of relevant equipment to be proved.
FIRE ALARM / GENERAL ALARM SYSTEM, MAKE: ELNA, GERMANY
General alarm panel in W/house and MCR to be overhauled and Audio Visual Indications functional checks to be carried out. Renew all deteriorated/damaged internal wiring and components.
FIRE SUPRESSION CONTROL SYSTEM (FM 200) MAKE: KIDDIE FENNER, USA / SUPER FIRE ENGG, MUMBAI
Control panel located at wheelhouse to be overhauled and test electric control head without discharging FM-200 cylinder. Overhaul Transformer Rectifier Unit. Renew all deteriorated/damaged internal wiring and components. Back up batteries (02 in nos. 12V, 7.2 AH) to be replaced. System to be proved for satisfactory operations on completion of overhauling. Job To Be Undertaken through MMD/DG Shipping Approved Firms.
LIGHTING TRANSFORMER 415V/230V 1 PH 10 KVA& LINK BOXES, QTY 04 NOS MAKE – STATIC TRANSFORMER, INDORE, ROUTINE : REFIT-
Overhaul 04 in nos transformers and Link box, check the IR value of transformer, Check insulation of the primary & secondary coil of the transformer and apply coat of air drying varnish to improve insulation, clean accumulated dust and tighten the contacts. (Insulation Class F). Renew all deteriorated wiring.
TRANSFORMER RECTIFIER UNIT/ BATTERY CHARGER (02 NOS) 50A, 230V AC/24V DC , MAKE – WAVE ELECT, KOCHI, ROUTINE : REFIT
Overhaul two in numbers Transformer Rectifier Unit. Calibrate all meters. Renew all deteriorated internal wiring.
MACHINERY CALL BELL SYSTEM MAKE: M/S FABRICONS, MUMBAI
Overhaul complete system including 04 nos Call Bell Panels (Wheel house, MCR, FER and AER) and hooters and to be proved.
GALLEY CALL BELL SYSTEM,MAKE: M/S FABRICONS, MUMBAI
Overhaul complete system including 03 Nos Call Bell Panels (Galley, Ward Room and CO’s Cabin) and hooters and to be proved. Renew all deteriorated internal wiring
AUTOMATIC TELEPHONE EXCHANGE, MAKE: M/S CORAL TELECOM
Overhaul complete Telephone Exchange and replace aged/ deteriorated components and wiring.
03 in no. extensions in various compartments not working view defective section card PCB, same to be repaired/renewed, extensions to be configured and proved with the system.
SOUND POWERED TELEPHONE, MAKE – THALES, MODEL -SPT 9010
01 in no Sound Power Telephone at forward engine room defective. To be overhauled and proved.
ELECTRO HYDRAULIC CRANE,( 5.5KW, 415V , 3 Ph , 50 Hz) MAKE: NED-DECK, HOLLAND (PAC FIRM M/S VANSONENGGINEERING, MUMBAI), ROUTINE : REFIT
Motor to be overhauled (5.5KW). Checking insulation and varnishing of motor winding. Examine for rotor impeller shaft & bearing housing for flaws, cracks or corrosion. Renewal of bearing, seals. Balance of rotor. Repair of terminal box and replacement of nuts & bolts. Painting of motor body. Preparation of the foundation for motor fitment. Carry out running test after assembling & installation onboard ship.
Overhauling complete control panel. Calibrate over load relay by current injection test set.Renew all deteriorated internal wiring. Starter panel beading to be replaced. Prove for satisfactory operation of the crane after completion.
ALDISLANTERN-MAKE:MANISHINDUSTRIESKOLKATA (TYPE: 0558/462-4287)
Overhaul battery charger replace perished components. Check the appearance of battery. If dirty or contaminated, wash with fresh water If cracked, replace with new battery.
WATERJET SYSTEM, MAKE: KAMEWA / ROLLS ROYCE ( JOBS TO BE UNDERTAKEN BY OEM/PAC FIRM)
Carryout functional tests and replace components if required.
Following alarms and sensors are to be calibrated :- (i) Low hydraulic oil pressure (ii) High temperature and low oil level Low oil flow and low lube oil pressure
ELECTRO HYDRAULIC CRANE,( 5.5KW, 415V , 3 Ph , 50 Hz) MAKE: NED-DECK, HOLLAND (PAC FIRM M/S VANSONENGGINEERING, MUMBAI), ROUTINE : REFIT
Following alarms and sensors are to be calibrated:- (iii) Low lub oil pressure (iv) Over speed trip (v) Low fresh water pressure (vi) Low gearbox lub oil pressure alarm (vii) Low fresh water level alarm in expansion tank (viii) Operation of exhaust shut down (ix) High fresh water temperature alarm (x) High lub oil temperature (xi) High gear box temperature (xii) Low fuel oil pressure alarm
Following measuring instruments in BRIDGE/MCR to be calibrated. All indication lights, dimming circuit to be proved for proper operation. (a) RPM Gauge - 06 Nos (b) Shaft rpm - 06 Nos (c) Steering indicator - 06 Nos (d) Ahead/astern indicator- 06 Nos
Exhaust gas monitoring system to be checked for proper operation.
Supplimentary Defect List
24 in Nos Connectors of MCS-5 PAN at various location in forward Engine room, Aft engine room and Bridge to be renewed
False Alarm of waterjet hydraulic pump failure is observed in MCS-5 whenever cut in/off of major load.
Centre DA tripping intermittently without alarm. Suspect defect occurring view deteriorated wiring & components. Wiring, connectors, terminal strips, etc. to be renewed and all peripherals /sensors and cutout in panel on completion, spares-CG supply, materials – yard supply. All in way job included.
UNDERWATER PACKAGE: DRY DOCK ROUTINES REFIT, PROPULSION SHAFTS/WATER JETS, MAKE: KAMEWA, SWEDEN, MODEL: 71 S II, QTY: 03 NOS. PAC FIRM M/S ROLLS ROYCE, MUMBAI Firm to undertake cleaning in conjunction with DL serial HA-1033 and carry out inspection through OEM/PAC With Class surveyor,SS and COA. Clearances of water Jet impellers to be recorded and vetted by class surveyor. Spares – CG supply Material - Firm supply All in way jobs included
Clean and inspect all impellers for pitting, dents and cracks. Carry out repairs as recommended by class surveyor/OEM.
Clean and inspect tail shaft for cracks or deterioration. Carry out repairs/renewal as recommended by class surveyor/OEM.
Clean and inspect Water Jet & Bucket for corrosion. Carry out repairs/renewal as recommended by class surveyor/OEM.
Measure clearances of Water Jet impellers and to be authenticated by class surveyor/ OEM
Overhaul, pressure test, refit following underwater valves. Valves to be painted. (Test pressure 05 bar). Material & spares – Firm supply as per RFIC minutes. All in way jobs included. Firm to carry out pressure and prove. Pressure test- 1.5 times of working pressure working pressure- 2 bar. Vulcanisation if required against AWRF for EA-3005 & 3006
SDNR, Size 150 mm (NB), 03 numbers, Equipment -Main Engines
SDSL, Size 125 mm (NB), 01 number, Equipment - Magazine comp direct flooding.
SDSL, Size 125 mm (NB), 01 number, Equipment - Magazine comp direct flooding.
SDNR, Size 65 mm (NB), 01 number, Equipment - AC Condenser Pump
SDNR, Size 50 mm (NB), 03 numbers, Equipment - Port, Stbd & Center DA
SDNR, Size 32 mm (NB), 01 number, Equipment - RO Plant
Overhaul, pressure test and refit 10 nos. air weed valve connected to sea tubes (size: 15 NB, Type: SDNR). Valves to be painted prior fitment. Firm to undertake renewal of weed valves. Material – Firm supply All in way jobs included.
Overhaul, pressure test and refit 01 in no. sea water suction valve of Oily Bilge Water Separator (size: 15 NB, Type: SDNR). Valves to be painted prior fitment. Material & spares – Firm supply as per RFIC minutes. All in way jobs included. Firm to carry out pressure and prove. Pressure test- 1.5 times of working pressure.
Overhaul, pressure test and refit following butter fly cocks in underwater sea water system. Valves to be painted. (Test pressure 05 bar). Material & spares – Firm supply as per RFIC minutes. All in way jobs included. Firm to carry out pressure and prove. Pressure test- 1.5 times of working pressure. Vulcanization if required against AWRF for EA-3013
Butter fly cocks, Size 150 mm (NB), 03 numbers, Equipment - Main Engines
Butter fly cocks, Size 80 mm (NB), 02 numbers, Equipment - Fire/ Bilge & GS Pumps
Butter fly cocks, Size 65 mm (NB), 01 numbers, Equipment - AC Condenser Pump
Butter fly cocks, Size 50 mm (NB), 03 numbers, Equipment - Port, Stbd & Center DA
Overhaul, pressure test and refit following overboard valves. Valves to be painted. (Test pressure 05 bar). Material & spares – Firm supply as per RFIC minutes. All in way jobs included. Firm to carry out pressure and prove. Pressure test- 1.5 times of working pressure.
Overboard Valves, SDNR, Size 80 mm (NB), Quantity- 03 numbers, Equipment/ System - Main Engines
Overboard Valves, SDNR, Size 65 mm (NB), Quantity- 03 numbers, Equipment/ System - ME exhaust jacket system
Overboard Valves, SDNR, Size 65 mm (NB), Quantity- 03 numbers, Equipment/ System - Diesel Alternator
Overboard Valves, SDNR, Size 65 mm (NB), Quantity- 04 numbers, Equipment/ System - GS Pumps, Eductors
Overboard Valves, SDNR, Size 32 mm (NB), Quantity- 02 numbers, Equipment/ System - Shower and Bilge pump
Overboard Valves, SDNR, Size 25 mm (NB), Quantity- 01 numbers, Equipment/ System - RO Plant
Overboard Valves, SDNR, Size 20 mm (NB), Quantity- 01 numbers, Equipment/ System - Oily Water Separator
Overboard Valves, SDNR, Size 65 mm (NB), Quantity- 01 numbers, Equipment/ System - AC
Overboard Valves, SDNR, Size 32 mm (NB), Quantity- 02 numbers, Equipment/ System - Galley
Overboard Valves, SDNR, Size 65 mm (NB), Quantity- 01 numbers, Equipment/ System - STP
Overboard Valves, SDNR, Size 50 mm (NB), Quantity- 04 numbers, Equipment/ System - CO/ Officer’s bathroom drain, pantry drain & ATU drain
MAIN ENGINES (MAKE: MTU, TYPE: 16 V 4000 M 90, QTY: 03 NOS.) ROUTINE: W-5 (6000 HRLY) PAC FIRM: M/s M/s YEOMAN MARINE, MUMBAI (ROUTINE SPARES CG SUPPLY)
(a) Before starting maintenance work perform a test run, record the engine parameters, drain engine coolant and flush engine coolant. (b) Remove and inspect vibration damper. Recondition if necessary based on pre refit trial (c) Remove and check rocker arms (push rod driven) and valve bridges. Check rocker arms (camshaft driven) and rocker arm bearing for wear. (d) Remove cylinder heads. Check inlet valve guides. Replace exhaust valve guides. Recondition valves and valve seats. Replace O ring on the protective sleeves. Replace gaskets (e) Check cylinder liner wear patterns (f) Check condition of battery charging generator coupling. (g) Remove disassemble clean and check components of exhaust turbo charger. Measure bearing clearance and compressor wheels (h) Replace lub oil filter, air filter and fuel filter elements (j) Check thickness of oil residue layer. Clean centrifugal lub oil filters. Replace taper sleeve(k) Check inlet air and exhaust flaps for ease of movement (l) Carry out lub oil and engine coolant lab analysis (m) Check condition of torsionally resilient coupling (visual inspection) (n) Check charge state electrolyte and specific gravity of battery (p) Check exhaust system drain plug obstructions (q) Replace crankcase breather filter elements, (r) Check HP fuel pump relief bore for obstructions , (s) Check visually serviceability of engine wiring , (t) Check monitoring/production system for proper functioning (u) Clean air ducts/pipes and replace seals , (v) Clean intercooler and test for leaks. Replace seals (w) Check function of sequential control valves (x) Replace fuel injectors (y) Replace high pressure fuel sensors (z) Overhaul engine coolant pump (aa) Overhaul raw water pump (ab) Clean engine coolant cooler and pressure test for leaks (ac) Check engine coolant thermostat. Replace if required (ad) Clean engine oil heat exchanger and check for leaks. Replace seals (ae) Overhaul engine starter (af) Check centrifugal oil filter bearing. Replace if necessary (ag) Overhaul Bilge pump (if fitted) (ah) Clean/repair common rail (aj) Clean/repair oil filter head (ak) Clean/repair fuel filter head (al) Clean/repair expansion tank (am) Clean/repair air breather manifold (an) Clean fuel leak off block &fuel lines (ap) Check SV mounts for conditions, securing and, tightness. Measure adjustment dimension on central buffer of engine mounts. Renew SV mounts if required (aq) On completion, replenish oil & coolant, start engine, check all gauges for functionality and carry out trails. Record all parameters RFIC Remark: All in way jobs included. Firm to provide all necessary assistance to PAC firm to facilitate smooth completion of WS routines on three main engines for designed performances post completion of WS routines
Exhaust leakage observed from Stbd main engine exhaust pipe flange. To be repaired. Job includes removal of exhaust pipe, lagging/cladding and refitment. Exhaust lagging to be carried out on completion of defect ratification. DO as per DL serial. Spares – CG supply Material - Firm supply. All in way jobs included. Lagging area 5 sq Mtr
Three main engine exhaust lagging deteriorated at various places. Lagging along with cladding to be renewed. Area – 10 M2 DO as per DL serial. Material – Firm supply as per RFIC minutes. All in way jobs included.
Three main engine exhaust flap open close mechanism and control system malfunctioning. System to be overhauled and proved. DO as per DL serial through PAC firm. Spare – CG supply Material– Firm supply. All in way jobs included.
GEAR BOXES (MAKE: ZF MARINE, TYPE: BW 755-1, QTY: 03 NOS.) ROUTINE: A-4 (6000 HRLY). PAC FIRM M/S DYNATRON SERVICES, CHENNAI. ROUTINE SPARES CG SUPPLY
(a) Visually check flexible clutch. (b) Visually check flexible engine and transmission mounting.. (c) Visually check /inspect clutch discs. (d) Visually check /inspect running gear. (e) Check priming oil pump and trailing oil pump. (f) Check control unit. (g) Check actuation device. (h) recalibrate display device (j) cleaning and pressure testing of oil cooler. (j) Check input shaft seal. (l) Check output shaft seal. (m) Check hoses and cable for wear and tear / damage, replace as necessary. (n) Check flow limiting valve. (p) Check Oil jet control valve. (q)Testing and calibration of all sensors/switches/safety devices and provide certificate. DO as per DL serial through PAC firm. Spare – CG supply Material– Firm supply. All in way jobs included. Firm to provide all the necessary assistance and workshop space to PAC firm to facilitate smooth completeion of A4 routines on three Main Gear Box.
WATER JETS, MAKE: KAMEWA, SWEDEN, MODEL: 71 S II, QTY: 03 NOS. ROUTINE: 02 YEARLY (SPARES CG SUPPLY) PAC FIRM M/S KONGSBERG MARINE CM INDIA PVT LTD, MUMBAI.
(a) Carryout in- situ visual inspection of impeller, Guide vane chamber. (b) Carryout in- situ visual inspection of shaft, shaft seal and shaft coupling (c) Carry out in- situ inspection of bulkhead seal (d) Carry out grease removal of support bearing (e) Carry out inspection of shaft and flange bolt (f) Carry out in-situ inspection of split cone ring (g) Carry out re adjustment of shaft seal if required (h) Carry out functional test of counterbalance valve of steering and reversing system (j) Carry out functional test on PTO pump readjust , if required (k) Carry out functional test on electric motor driven lub oil pump. readjust pressure if required (l) Carry out functional test on hydraulic oil tank with valve manifold. Readjust pressure if required (m) Replace High and low pressure filter (n) Replace the cylinder seals (p) Replace the hydraulic hoses (q) Replace the feedback cables (r) Replace hanging anodes (s) Replace the anodes below shaft protection tube, on the ship transom and shaft seal anode (t) Carry out the function test on control system. readjust, if required (u) Carry out the functional test of alarms switches and pressure gauges. (v) Calibration of levers, feedback units and indicators adjustment DO as per DL serial. Firm to undertake 2 yearly water jet routines through M/s Konsberg, Mumbai as per maintenance schedule, maintops and OEM recommendations. Spares, oil, seals, anodes & hoses - CG supply. Material - Firm supply All in way jobs included.
PORT DIESEL ALTERNATOR (MAKE: CUMMINS, MODEL: 6 CTA 8.3 D(M), CAPACITY: 120 KW, QTY: 01 NO, ROUTINE: 12000 HRLY ( ROUTINE SPARES CG SUPPLY) DO as per DL serial through PAC firm. Spare – CG supply Material– Firm supply. All in way jobs included. PAC firm to prove port DA for designed performance post completion of 12000 hourly routines.
(a) Check all engine mounted safeties for functionality and calibrate gauge. Replace, if needed (b) Check fuel tubing and replace ferules and rubber gaskets (c) Replace thermostat along with their seal (d) Overhaul fresh water pump (e) Check the condition of engine mounts. Renew if required (f) Engine major overhaul (Engine to be removed from base rail) (g) Dismantle the engine in total, de-scale cooling system (h) Clean and check all dismantled components (j) Check crankshaft dimensions and regrind, if needed (k) Check the condition of connecting rod and main bearing in line with crankshaft size, replace if needed (l) Replace sleeves/liners on cylinder block if required (m) Check and recondition or replace starting motor and battery charging alternator (n) Dismantle cylinder head and recondition with all valves, guides springs and related parts (p) Change fuel and lub oil filter. Clean fuel strainer (q) Replace air filter (r) Overhaul vibration damper (s) Overhaul sea water pump (t) Check engine blow bye. Take corrective actions if needed (u) Replace all rubber hoses/clamp of fuel, coolant, lube and air system (w) Drain coolant, flush cooling system and refill new coolant (x) Overhaul turbocharger (y) Calibrate PT pump and injectors (z) Clean heat exchanger and pressure test (aa) Replace all engine related wiring harness (ab) Mount engine on base rail and couple to alternator after check coupling alignment (ac) Change lub oil (ad) Vent fuel line and injector supply line (ae) Start engine and carry out load trails record all parameters DO as per DL serial through PAC firm.Spare – CG supply Material– Firm supply. All in way jobs included. PAC firm to prove port DA for designed performance post completion of 12000 hourly routines.
REVERSE OSMOSIS PLANT (MAKE: ROCHEM MUMBAI, MODEL: RO 0510 DT 02-S, CAPACITY: 5TPD, QTY: 01 NO. PAC: M/S ROCHEM SEPARATIONS, MUMBAI
Service HP Pump’s suction & discharge valves. DO as per DL serial through PAC firm. Spare – CG supply Material– Firm supply. All in way jobs included
Service HP Pump’s suction & discharge valves. DO as per DL serial through PAC firm. Spare – CG supply Material– Firm supply. All in way jobs included
Replace seal kit of HP Pump. DO as per DL serial through PAC firm. Spare – CG supply Material– Firm supply. All in way jobs included
Replace mechanical seals of PK-30 pump. DO as per DL serial through PAC firm. Spare – CG supply Material– Firm supply. All in way jobs included
Calibrate Torque Wrench DO as per DL serial through PAC firm. Spare – CG supply Material– Firm supply. All in way jobs included
Replace all low-pressure hoses DO as per DL serial through PAC firm. Spare – CG supply Material– Firm supply. All in way jobs included
Replace mechanical seal of Filter pump (PK-20) DO as per DL serial through PAC firm. Spare – CG supply Material– Firm supply. All in way jobs included
Check /renew HP pump motor belt DO as per DL serial through PAC firm. Spare – CG supply Material– Firm supply. All in way jobs included
Inspect HP Pump motor pulley alignment/replace as required. DO as per DL serial through PAC firm. Spare – CG supply Material– Firm supply. All in way jobs included
Check anti vibration mountings and mounting plates of HP Pump for bulging/deterioration. Replace if required. DO as per DL serial through PAC firm. Spare – CG supply Material– Firm supply. All in way jobs included
Check HP relief valve for operation. Calibrate/repair/replace as required. DO as per DL serial through PAC firm. Spare – CG supply Material– Firm supply. All in way jobs included
Replace pulsation damper charging plug seal ring. DO as per DL serial through PAC firm. Spare – CG supply Material– Firm supply. All in way jobs included
Recharge with nitrogen up to 30 bar. Change diaphragm/damper. DO as per DL serial through PAC firm. Spare – CG supply Material– Firm supply. All in way jobs included
Replace cartridge filter head O ring and element. Check head and fittings for damage /leakage. DO as per DL serial through PAC firm. Spare – CG supply Material– Firm supply. All in way jobs included
Replace DA filter head O ring and dolomite. Check head fittings for damage. DO as per DL serial through PAC firm. Spare – CG supply Material– Firm supply. All in way jobs included
Replace sand filter O ring. Check head and fittings for damage/leakage. Check sand condition. DO as per DL serial through PAC firm. Spare – CG supply Material– Firm supply. All in way jobs included
Onboard operation/functional check of Servo motor control valve VS-60 SMCV. DO as per DL serial through PAC firm. Spare – CG supply Material– Firm supply. All in way jobs included
Onboard functional checks of Solenoid valve VE82/VE83. DO as per DL serial through PAC firm. Spare – CG supply Material–Firm supply. All in way jobs included
Check PLC operation. Repair/ replace as necessary. Do as per DL Serial through PAC firm Spares- CG Supply Material - Firm Supply All in way jobs included
Check Pressure transmitter operation. Repair/replace as necessary. Do as per DL Serial through PAC firm Spares- CG Supply Material - Firm Supply All in way jobs included
Check level switch operation. Repair/replace as necessary. Do as per DL Serial through PAC firm Spares- CG Supply Material - Firm Supply All in way jobs included
Check air regulator for operation. Do as per DL Serial through PAC firm Spares- CG Supply Material - Firm Supply All in way jobs included
Calibrate panel mounted conductivity meter. Do as per DL Serial through PAC firm Spares- CG Supply Material - Firm Supply All in way jobs included
DT Module serviceability check. Do as per DL Serial through PAC firm Spares- CG Supply Material - Firm Supply All in way jobs included
STP/VACUUM PLANT (MAKE: HAMWORTHY KSE LTD, MODEL: ST2A, QTY: 01 NOS.), ROUTINE: REFIT PAC: M/S HAMWORTHY INDIA. (ROUTINE SPARES CG SUPPLY) Spare – CG supply Material– Firm supply. All in way jobs included.
Drain and clean all compartments (aeration, settling and chlorine contact compartment) of the unit. Check condition of coating in the compartment Recoating to be done on all compartment if required.DO as per DL serial through PAC firm. Spare – CG supply Material– Firm supply. All in way jobs included.
Overhaul discharge pump (Model: B 50 X 50 HC) with motor (capacity: 1.75 kW) and renew all defective parts. Spare CG supply. DO as per DL serial through PAC firm. Spare – CG supply Material– Firm supply. All in way jobs included.
Overhaul two in no Ejector pumps (model: B 50 x 50 HC) with motor (capacity: 1.75 kW) and renew all defective parts. DO as per DL serial through PAC firm. Spare – CG supply Material– Firm supply. All in way jobs included.
Overhaul air compressor including motor (motor rating: 0.55 kW) and renew all defective parts. DO as per DL serial through PAC firm. Spare – CG supply Material– Firm supply. All in way jobs included.
Replace aerators of 12 in nos. air diffuser elements. DO as per DL serial through PAC firm. Spare – CG supply Material– Firm supply. All in way jobs included.
Overhaul 07 in no flush control mechanism of bathrooms WC. DO as per DL serial through PAC firm. Spare – CG supply Material– Firm supply. All in way jobs included.
07 in no sewage discharge valves of W/Cs to be overhauled. DO as per DL serial through PAC firm. Spare – CG supply Material– Firm supply. All in way jobs included.
Renew 07 in no. flush button mechanism and proved. DO as per DL serial through PAC firm. Spare – CG supply Material– Firm supply. All in way jobs included.
Overhaul 04 no. non return valve fitted in sewage discharge line. DO as per DL serial through PAC firm. Spare – CG supply Material– Firm supply. All in way jobs included
Renew all vacuum tubes in the system. (Dia 10 mm, total length- 15 m). DO as per DL serial through PAC firm. Spare – CG supply Material– Firm supply. All in way jobs included.
Overhaul vacuum breaker unit. DO as per DL serial through PAC firm. Spare – CG supply Material– Firm supply. All in way jobs included.
HP AIR COMPRESSORS (MAKE: ELGI, MODEL: HP 10300-GSL (SPLASH LUBRICATED, RECIPROCATING, AIR COOLED) QUANTITY: 02 NOS., ROUTINE: REFIT, PAC: ELGI, COIMBATORE Spare – CG supply Material– Firm supply. All in way jobs included.
Overhaul compressor. DO as per DL serial through PAC firm. Spare – CG supply Material– Firm supply. All in way jobs included.
Dismantle oil water separator and inspect NRV stiffness and valve seat. DO as per DL serial through PAC firm. Spare – CG supply Material– Firm supply. All in way jobs included.
Clean and pressure test intercoolers and after coolers. DO as per DL serial through PAC firm. Spare – CG supply Material– Firm supply. All in way jobs included.
Overhaul auto drain valve. DO as per DL serial through PAC firm. Spare – CG supply Material– Firm supply. All in way jobs included.
Overhaul pressure relief valve. DO as per DL serial through PAC firm. Spare – CG supply Material– Firm supply. All in way jobs included.
Renew all safety valves in system. DO as per DL serial through PAC firm. Spare – CG supply Material– Firm supply. All in way jobs included.
Overhaul unloader mechanism. DO as per DL serial through PAC firm. Spare – CG supply Material– Firm supply. All in way jobs included.
AIR CONDITIONING PLANT (MAKE: BOCK, MODEL: HG6 1080 4S, SEMI HERMETICALLY SEALED, CAPACITY: 25 TR)ROUTINE: REFIT, PAC: M/S BOCK INDIA, (ROUTINE SPARES CG SUPPLY)
Withdraw and inspect compressor suction and delivery valves for wear down, scoring markings.
Withdraw piston and inspect for wear down, scoring marking. Measure wear down piston, piston ring and oil scrapper ring. Replace all defective components.
Replace small end bushes and gudgeon pins.
Inspect all bearings and measure wear down and record. Renew bearing if beyond the limits. Spare CG supply.
Measure ovulate of cylinder, record and renew if beyond the limits.
Inspect unloading device for correct operation.
Inspect crank shaft, undertake measurement, polish and refit.
Strip and examine lubricating oil pump of compressor. Renew all defective components.
Before/during assembly of compressor undertake measurement of clearances and record
Replace both motor’s bearing.
Check and replace all valve stems glands in refrigerant line. (size- 1 5/8“- 12 Nos., 2 5/8”- 04 Nos., Needle vale (10 mm) - 15 Nos.)
Check all controls, carry out functional test reset. Replace all defective components.
Overhaul the condenser pump, replace damaged parts and pump to be proved for rated output. (Make: Johnson pumps, Model: KGEC-12-5)
Chemically clean and pressure test condenser. Test pressure: 30 bar. Replace condenser cover gasket.
Overhaul all isolating valves on cooling water system and pressure test at 05 bar. Type SDSL/SDNR, Size 65 mm, qty: 04 nos.
Carry out pressure test, vacuum test and leak test complete plant including Fan Control Units (FCU). Inspect cooling coil and return bends and check for weak spots, glands of valves, etc. During pressure testing PUF insulation on system pipe to be removed for inspection of pipe lines. On successful completion of pressure testing system pipe lines to be re-insulated. Mat: PUF, Length: 68 Mtrs. FCU – 02 nos
Recharge the system and undertake trials of plant including functional checks of all safeties and cut outs.
Check and clean ATU and FCU (02 nos) coils with spray of water and soap solution and carry out pressure test.
Diffuser to be removed/cleaned with HP air, painted and fitted back. Qty – 25 nos
ATU air intake filter deteriorated/worn out. To be fabricated as per sample, size- 2 ft x 2 ft, 1 ft x 1.5 ft. Qty- 02 sets each, Mat - SS grills with frame.
A/C pipeline insulation deteriorated at several places. To be insulated (Mat- PUF insulator, Area- 05 Sq Mtrs)
A/C compressor discharge pipe line (HP line) hot lagging deteriorated. To be renewed. Area- 10 Sq Mtrs
04 in no AC trunking isolating flaps mechanism found deteriorated in ATU compartment. Flaps to be replaced as per sample. Dia- 150 mm , Qty- 04 nos
ATU drain pipe found choked. To be removed/chemically cleaned/pressure tested and painted. Dia 60 mm, Length- 10 mtr
Wobbling of ATU blower observed. ATU blower to be overhauled, dynamically balanced and proved for satisfactory performance. Dia of blower – 0.5 mtr
Oil in AC system line not returning back to compressor. Suspect both Oil separators chocked. Both oil separator to be overhauled and proved for satisfactory operation.
DIESEL DRIVEN PUMP, MODEL: 5520, CAPACITY: 3.68 KW, QTY: 01 NO, MAKE: GREAVES COTTON LIMITED. ROUTINE: REFIT
Overhaul the pump and remew all defective parts. On competion of overhauling pump to be proved for its rated output. Mechanical seal, coupling pad, fasteners, gaskets, etc yard supply)
Hand starting mechanism engaging plate/cover of Diesel driven pump found deteriorated. Defective parts to be replaced.
FRESH WATER HYDROPHORE PUMP (MAKE: SPX FLOW TECHNOLOGIES PVT LTD, ERSTWHILE JOHNSON PUMPS) MODEL: BUS 49, CAPACITY: 2.5 TPH, QUANTITY: 02 NOS, ROUTINE: REFIT
Overhaul the pump and remew all defective parts. On competion of overhauling pump to be proved for its rated output. Mechanical seal, coupling pad, fasteners, gaskets, etc yard supply)
Check alignment of pump shaft with motor.
Chemically clean hydrophore tank & pressure test. Test pressure: 10 bar. Capacity: 500 Ltrs. On completion of cleaning tank to be painted as per paint scheme. Job includes removal and refitment of tank.
FIRE & GS AND BILGE & GS PUMPS(MAKE: SPX FLOW TECHNOLOGIES PVT LTD, ERSTWHILE JOHNSON PUMPS) MODEL: CV 50 – 200 B3 M2 TL, CAPACITY: 40 TPH, QUANTITY: 02 NOS.ROUTINES REFIT
Overhaul the pump. (Dismantle the pump, inspect all sub components and renew all defective components. On completion of overhauling, pump to be proved for rated output. Mechanical seal, coupling pad, fasteners, gaskets, etc yard supply)
Check alignment of pump shaft with motor.
FUEL OIL TRANSFER PUMP (MAKE: M/S TUSHACO PUMP LTD, MODEL: R-25 EG-F, CAPACITY: 06 M3/HOUR QTY:02 NOS.) ROUTINE: REFIT
Overhaul the pump (Dismantle the pump, inspect all sub components and renew all defective parts. On completion of overhauling, pump to be proved for rated output. Mechanical seal, coupling pad, fasteners, gaskets, etc yard supply.)
Check alignment of the pump with motor.
FUEL OIL PURIFIER, MODEL: MMPX 404 SGP-11, CAP: 2000 LTRS/HR, QTY: 01 NO, MAKE: ALFA-LAVAL, PUNE
(a) Overhauling of coupling and intermediate parts. (b) Renewal of bearings. (c) Renewal of vibration mountings (d) Check/inspect separator bowl, vertical driving device, radial wobble of bowl spindle and inspect friction coupling (e) Servicing of air filter pressure regulator and solenoid valve assembly. Renew damage parts. (f) Overhauling of feed pump and sludge pump. Prove the plant for optimum performance.
DIVING AIR COMPRESSOR, MAKE- AEROTECNICACOLTRISPA, ITALY, MODEL- MCH-6 CAPACITY-200 BAR, QTY-01 NO.
Overhaul engine and compressor and prove for optimum performance. Spares and material yard supply.
EMERGENCY DA MODEL: EU70is, CAP: 5.5 KVA, QTY: 01 NO, MAKE: HONDA
(a) Check and adjust valve clearance. (b) Clean fuel tank, spark arrester and combustion chamber (c) Replace engine oil, air filter ,spark plug, fuel filter and fuel tube(spare yard supply)
FRESH WATER SYSTEM Chemical clean and Pressure test following fresh water system pipe line (Test pressure: 06 Kg/Cm2) and eliminate all leakges. Pipe to be painted as per colour code. Paint yard supply.
Size(mm) Length (Mtrs) 50 10
Size(mm) Length (Mtrs) 50 10
Size(mm) Length (Mtrs) 20 51
Size(mm) Length (Mtrs) 1 5 40
Size(mm) Length (Mtrs) 1 0 20
FRESH WATER SYSTEM Overhaul, pressure test and refit following valves of the F/W system. Spares and material yard supply. Spindles and valve seat CG supply. Test pressure: 06 Kg/Cm2. (To be catered for 50% valves). Valve to be painted prior fitment
Type of VV NB (mm) Qty (Nos.) SDSL (ST Type) 32 1 0
Type of VV NB (mm) Qty (Nos.) SDSL (ST Type) 20 06
Type of VV NB (mm) Qty (Nos.) SDSL (ST Type) 15 34
LUB OIL SYSTEM
Clean and examine 02 Nos. lub oil storage tanks. Capacity: 600 ltrs.
Type of valve Size(mm) Qty. (Nos.) SDSL 20 05
Type of valve Size(mm) Qty. (Nos.) Self closing cock 20 02
Type of valve Size(mm) Qty. (Nos.) 3 Way cock 20 03
SEA WATER SYSTEM Overhaul, pressure test and refit following valves of the sea water system. Spares and material yard supply. (To be catered for 50% valves). Valve to be painted prior fitment
Type of valve Size(mm) Qty. (Nos.) Test pressure SDSL Angle valve 125 01 7 kg/cm2
Type of valve Size(mm) Qty. (Nos.) Test pressure SDSL Angle valve 80 02 7 kg/cm2
Type of valve Size(mm) Qty. (Nos.) Test pressure SDNR Angle valve 65 04 7 kg/cm2
Type of valve Size(mm) Qty. (Nos.) Test pressure SDNR valve 20 01 7 kg/cm2
Type of valve Size(mm) Qty. (Nos.) Test pressure Foot valve 65 02 7 kg/cm2
Type of valve Size(mm) Qty. (Nos.) Test pressure SDNR/SDSL 65 13 7 kg/cm2
Type of valve Size(mm) Qty. (Nos.) Test pressure SDNR/SDSL 50 17 7 kg/cm2
Type of valve Size(mm) Qty. (Nos.) Test pressure SDSL 40 05 7 kg/cm2
Type of valve Size(mm) Qty. (Nos.) Test pressure SDNR 20 04 7 kg/cm2
Type of valve Size(mm) Qty. (Nos.) Test pressure SDSL 60 01 7 kg/cm2
Type of valve Size(mm) Qty. (Nos.) Test pressure Fire Hydrant 65 07 7 kg/cm2
Type of valve Size(mm) Qty. (Nos.) Test pressure Foot Valve 50 06 7 kg/cm2
Type of valve Size(mm) Qty. (Nos.) Test pressure EA 3139 SDSL 18 01 7 kg/cm2
SEA WATER SYSTEM Pressure test following main engines/ Gear Box & DA’s sea water system pipelines up to 1.5 times the working pressure and eliminate all leakages. Material yard supply. Pipe to be painted as per colour code. Paint yard supply.
SIZE (mm) LENGTH (Mtr) TESTING PRESSURE 150 18 7 kg/cm2
SIZE (mm) LENGTH (Mtr) TESTING PRESSURE 125 25 7 kg/cm2
SIZE (mm) LENGTH (Mtr) TESTING PRESSURE EA 3142 65 12 7 kg/cm2
SIZE (mm) LENGTH (Mtr) TESTING PRESSURE 50 20 7 kg/cm2
SIZE (mm) LENGTH (Mtr) TESTING PRESSURE 40 77 7 kg/cm2
SIZE (mm) LENGTH (Mtr) TESTING PRESSURE 32 26 7 kg/cm2
SIZE (mm) LENGTH (Mtr) TESTING PRESSURE 32 24 7 kg/cm2
SIZE (mm) LENGTH (Mtr) TESTING PRESSURE 15 45 7 kg/cm2
SEA WATER SYSTEM Pressure test following AC sea water system pipelines up to 1.5 times the working pressure and eliminate all leakages. Pipe to be painted as per colour code. Paint yard supply.
SIZE (mm) LENGTH (Mtr) TESTING PRESSURE 65 12 7 kg/cm2
SIZE (mm) LENGTH (Mtr) TESTING PRESSURE 20 04 7 kg/cm2
SIZE (mm) LENGTH (Mtr) TESTING PRESSURE 15 10 7 kg/cm2
SEA WATER SYSTEM-Bilge & GS and fire & GS pumps bilge suction/sea water system Pressure test following Bilge & GS and fire & GS pumps bilge suction/sea water system pipelines up to 1.5 times the working pressure and eliminate all leakages. Mat. Galvanized Seamless MS. Pipe to be painted as per colour code. Paint yard supply.
SIZE (mm) LENGTH (Mtr) TESTING PRESSURE 125 03 7 kg/cm2
SIZE (mm) LENGTH (Mtr) TESTING PRESSURE 80 15 7 kg/cm2
SIZE (mm) LENGTH (Mtr) TESTING PRESSURE 65 60 7 kg/cm2
SIZE (mm) LENGTH (Mtr) TESTING PRESSURE 50 104 7 kg/cm2
SIZE (mm) LENGTH (Mtr) TESTING PRESSURE 40 42 7 kg/cm2
SIZE (mm) LENGTH (Mtr) TESTING PRESSURE 20 45 7 kg/cm2
SIZE (mm) LENGTH (Mtr) TESTING PRESSURE 15 10 7 kg/cm2
SEA WATER SYSTEM-RO SYSTEM Pressure test following RO plant sea water system pipelines up to 1.5 times the working pressure and eliminate all leakages. Pipe to be painted as per colour code. Paint yard supply.
SIZE (mm) LENGTH (Mtr) TESTING PRESSURE 35 06 3 kg/cm2
SIZE (mm) LENGTH (Mtr) TESTING PRESSURE 25 08 7 kg/cm2
SIZE (mm) LENGTH (Mtr) TESTING PRESSURE 20 05 3 kg/cm2
SEA WATER SYSTEM-Main Engine Overhaul, pressure test and refit following valves in the Main Engine/DA sea water system as mentioned below. (To be catered for 50% valves). Valve to be painted prior fitment
SIZE (mm) LENGTH (Mtr) TESTING PRESSURE 150 03 3 kg/cm2
SIZE (mm) LENGTH (Mtr) TESTING PRESSURE 50 03 3 kg/cm2
SIZE (mm) LENGTH (Mtr) TESTING PRESSURE 65 03 3 kg/cm2
SIZE (mm) LENGTH (Mtr) TESTING PRESSURE 40 06 7 kg/cm2
SIZE (mm) LENGTH (Mtr) TESTING PRESSURE 32 06 7 kg/cm2
SEA WATER SYSTEM-Bilge & fire main system Overhaul and refit following valves in the Bilge & fire main system and condenser seawater cooling system as mentioned below. On completion before fitment brass tally on valve to be put on 10 in no. valves. (To be catered for 50% valves). Valve to be painted prior fitment
Type of valve Size(mm) Qty. (Nos.) Test pressure SDNR (ST) 020 01 7 kg/cm2
Type of valve Size(mm) Qty. (Nos.) Test pressure Butterfly 80 02 3 kg/cm2
Type of valve Size(mm) Qty. (Nos.) Test pressure SDNR (ST.) 65 04 3 kg/cm2
Type of valve Size(mm) Qty. (Nos.) Test pressure SDNR valve 65 09 3 kg/cm2
Type of valve Size(mm) Qty. (Nos.) Test pressure SDSL (ST.) 50 11 3 kg/cm2
Type of valve Size(mm) Qty. (Nos.) Test pressure SDNR (ST.) 50 07 3 kg/cm2
Type of valve Size(mm) Qty. (Nos.) Test pressure EA 3172 SDSL (ST.) 40 03 3 kg/cm2
Type of valve Size(mm) Qty. (Nos.) Test pressure Fire hydrant valve 65 07 7 kg/cm2
Type of valve Size(mm) Qty. (Nos.) Test pressure Foot valve 50 01 3 kg/cm2
Type of valve Size(mm) Qty. (Nos.) Test pressure SDSL 15 01 7 kg/cm2
Type of valve Size(mm) Qty. (Nos.) Test pressure SDNR 65 04 7 kg/cm2
Type of valve Size(mm) Qty. (Nos.) Test pressure SDSL 65 03 7 kg/cm2
FUEL SYSTEM
Size(mm) Qty. (Nos.) Test pressure 032 20 4.5 kg/cm2
Size(mm) Qty. (Nos.) Test pressure 020 30 4.5 kg/cm2
Size(mm) Qty. (Nos.) Test pressure 015 45 4.5 kg/cm2
Size(mm) Qty. (Nos.) Test pressure 010 50 4.5 kg/cm2
Size(mm) Qty. (Nos.) Test pressure 050 70 4.5 kg/cm2
Size(mm) Qty. (Nos.) Test pressure 040 104 4.5 kg/cm2
Size(mm) Qty. (Nos.) Test pressure 025 30 4.5 kg/cm2
Type of valve Size(mm) Qty. (Nos.) Test pressure SDSL 32 06 4.5 kg/cm2
Type of valve Size(mm) Qty. (Nos.) Test pressure SDSL 15 09 4.5 kg/cm2
Type of valve Size(mm) Qty. (Nos.) Test pressure SDSL 10 03 4.5 kg/cm2
Type of valve Size(mm) Qty. (Nos.) Test pressure SDSL (ST.) 50 04 4.5 kg/cm2
Type of valve Size(mm) Qty. (Nos.) Test pressure SDSL (Angle.) 40 12 4.5 kg/cm2
Type of valve Size(mm) Qty. (Nos.) Test pressure SDNR (ST) 40 03 5 kg/cm2
Type of valve Size(mm) Qty. (Nos.) Test pressure EA 3191 SDSL (quick closing) 40 06 5 kg/cm2
SHOWER AND BILGE PUMP (MAKE: M/S ROTO PUMP LTD, MODEL: RDAA-491 R7 CDII) CAPACITY: 1.5 M3/HOUR QUANTITY: 02 NOS, ROUTINE: REFITROUTINE SPARES CG SUPPLY
Overhaul the pump including relief valve and renew all defective parts.
Sludge accumulation observed carrying pipe line from tank to both shower and bilges pump. Sediments /accumulations to be removed, chemically cleaned and pressure tested. Dia: 50 mm, Length: 06 mtrs Dia: 32 mm, Length: 14 mtrs. Test pressure: 05 bar
OBM , MODEL: 25 HP, QTY: 02 NOS, (MAKE: MERCURY, USA and M/S TOHATSU, JAPAN)
Overhaul both OBM and change the parts if necessary. Prove the units for smooth operation.
SUBMERSIBLE PUMP, MODEL: M 204 NT, CAPACITY: 20 TPH/ 10 TPH QTY: 04 NOS MAKE: MODY PUMPS, ROUTINE: YEARLY/REFIT
Overhaul submersible pump alongwith motors and proved for water tightness and satisfactory operation
OILY BILGE WATER SEPARATOR, MAKE: SUYASH ENTERPRISES, PUNE MODEL: 0.15 TPH, QTY: 01 NOROUTINE: REFIT
Oily bilge water separator to be overhauled and proved for satisfactory operation. Job involves overhauling of screw pumps, pressure relief valve, electro pneumatic valves. Yard to be renewed the filters and clean the filter chamber. Dry running protection to be checked and proved.
FM-200 FIRE EXTINGUISHING SYSTEM, (PORT & STBD), QTY: 02 NOS, MAKE: KIDDIE FENNER, USA, PAC FIRM - M/S SUPERFIRE , MUMBAI ROUTINE: REFIT
Inspect /Test 02 in Nos. pressure switches
Check the Nitrogen cylinder weight. Recharge if loss in weight is 10%. In-way jobs included.
Check the weight of FM 200 cylinders. Recharge if loss in weight is 10 %. In-way jobs included.
Inspect and pressure test flexible actuation/Discharge hoses.
Test 02 in Nos. pneumatic detection system.
LUB OIL TRANSFER PUMP (PORTABLE) MODEL: 1HP, 02 TPH QTY: 01 NO MAKE: FLOWTECH PUMP AND HYDRAULIC, MUMBAI,
Overhaul the pump and renew all defective parts. Mechanical seal, coupling pad, fasteners, gaskets, etc yard supply.
Check the alignment of the pump with motor.
MISCELLANEOUS
Pre refit and post refit vibration test analysis to be conducted and detail report with class surveyor recommendation to be submitted after each vibration trial. List of equipment for analysis required is as follows: - (a) Port Main Engine (b) Center Main Engine (c) Stbd Main Engine (d) Port Gear Box (e) Center Gear Box (f) Stbd Gear Box (g) Port Water Jet (h) Center Water Jet (j) Stbd Water Jet (k) Port DA (l) Center DA (m) Stbd DA (n) AC Compressor 1 (p) AC Compressor 2 (q) HP Air Compressor 1 (r) HP Air Compressor 2 (s) Fuel Oil Purifier (t) Bilge & GS Pump (u) Fire & GS Pump (v) Mooring Capstan (w) Anchor windlass
Moisture/sediments observed from drain line of 02 in Nos. air reservoirs (capacity 500 ltrs each). To be internally cleaned and painted. Paint yard supply.
02 in Nos. head valve assemblies of the air bottle not holding. Valve head assemblies to be overhauled and all defective parts to be renewed. Post overhauling head assembly to be pressure tested at 45 bar.
Both end cover of AC condenser found deteriorated and material eaten away. Both end covers to be manufactured as per sample and belzona coating to be applied on both end cover. Material- Brass
Three main engines paint peeled off at various places. Engine to be painted with heat resistant paint as per paint scheme. Paint yard supply
Supplementary Defect List
Port and STBD Deisel Alternator Seawater pipe line pin holed at various places and leaking. Pipe line to be renewed along with flexible hoses. (mat-CuNi, Size 50mm, Length 12Mtrs
Aft GS Pump suction pipe line pin holed in various places Pipe line to be renewed (mate-CuNi, Size 150mm, Length 1 Mtr.
Hull & Appendages
Ship is required to be dry dock in version I and II as per Docking plan provided by Coast Guard. In case of any change in docking plan then Firm has to only quote for approval charges from classification society.( Docking plan will be provided by MDL).
U/W hull and boot top area including appendages like fixed fins, spray rails, inside of shaft tunnels, jet buckets, impellers, sea chest and areas inside sea chest etc. to be Washed and cleaned with fresh water hydro dynamic jet (3000 PSI) to remove any dirt, salt, oil, soot etc. Areas where high pressure washing is not feasible due to presence of delicate equipment/dielectric shield to be hose down with low pressure mopping and brushes. Approx Area 410 sq. Mtrs.
Examine sacrificial anodes fitted on sea chest and fixed fins. Renew all (06 nos shaft tube, 12 nos transom, 06 skeg area, 11 no at sea tube and 04nos at fixed fins. Firm to provide certificate regarding chemical composition of anodes. All in way jobs included and anodes firm supply. Sizes of various anodes are as follows:- 6 x 4 x 1.5 inches each (12 in nos.) 7 x 2 x 1.5 inches each (06 in nos.) 400 x 80 x 20 mm (06 in nos.) 80 x 60 mm (11 in nos.) 400 x 50 x 45 mm (04 in nos.)
Steel Renewal
Ultra sound robotic scanning to be done on entire under water hull and boot top areas. Where ultra sound scanning is not feasible carry out paying particular attention to shaft areas, astern transom near water jet, tunnels of Port, center and stbd water jets and sea chests (11 nos), fins and spray rails. Scanning and UTG report to be inspected by class surveyor and submitted to ship in triplicate. Firm to cater for 500 UTG points in addition to scanning. Those plates thinned down more than 10% to be cropped and renewed. Critical plates to be marked in drawings for renewal in forth coming refit. Steel renewal to be undertaken as per class surveyor recommendation and supervision. Consider renewal of 3 tons of plate. Steel grade- IS 2062 B.
11 sea chest gratings to be removed. Area inside sea chest to be inspected by class surveyor. Steel renewal to be undertaken as per class surveyor recommendation and supervision. Holding down bolts to be renewed. Gratings and area inside sea chest to be painted as per underwater scheme. Renewal of bolts firm supply. Size of bolts M-10.
Inlet and outlet bolts of port and stbd fixed fin to be opened and fins to be drained. Fins to be air tested for air tightness with pressure of 0.2 kg/cm2 and proved where required steel renewal to be done.
Painting & Miscllanious
Painting of tunnel areas and Jets to be done before complete under water painting is done. Paint Firm supply.
On completion of U/W inspection entire U/W hull including boot top area to be sand/ water blast /vacuum/ grit blasted to SA 2.5 and apply complete paint scheme. Painting of U/W hull including boot top area as per complete paint scheme to be carried under the supervision of paint manufacturer. Areas where delicate fitting exist to be scrapped manually to achieve the desired bare plate condition. Surface preparation to be done under the supervision of paint manufacturer Rep. Paint Firm supply. Area 410 Sq Mtr.
Remove, examine and overhaul all 04 in nos. U/W storm valves. Carry out pressure testing after overhauling (1.5 times of WP). Renew all Zinc anodes. Renew all 04 Zinc Anodes. Size of Anodes - 25 x 6 mm Size of Valves - 65 NB each ,Test pressure - 1.5 times WP
Port and Stbd Spray rail inlet and outlet bolts to be opened and old oil to be removed. Spray rails to be cleaned and pressure tested for air tightness with pressure of 0.2 kg/cm2. To be cropped & renewed as required. On completion both rails to be filled with fish oil and flushed. Survey of rails to be done by a class surveyor. Oil firm supply. Paint scheme & qty Sigmamarine28 – 05 Ltr Sigmamarine 28 Brown -05 Ltr Sigmamarine 48 White,7000 -05 Ltr All in way job included
Survey External hull structure i.e ship side from DWL to main deck for side shell plating including stem, transom and water jet guard. 400 UTG points to be catered for survey. Plate to be renewed if thickness reduces by 20% of original thickness as recommended by class surveyor. Entire area to be sand blasted to SA 2.5 and full coat to be applied on surface area with complete paint scheme. Paint Firm supply.
Survey External steel Decks plating including aluminium decks. 300 UTG points to be catered for survey. Plate to be renewed if thickness reduces by 20% of original thickness as recommended by class surveyor. Entire area to be sandblasted to SA 2.5 and full coat to be applied on surface area with complete paint scheme. Paint Firm supply. (Approximate surface area 275 and 120 sq. Mtrs)
Ships name and Indian Coast Guard (Hindi and English) on both sides to be painted and draught markings to be carried out. Paint firm supply. Paint Azure Blue. Qty 10 Ltr, Red - 02 Ltr, Black 01 Ltr
Examine bi-metallic joint on weather deck to super structure (Al) paying particular attention to joint where failure of structure may occur.
02 Nos Bosun store bilge pump operating handle corroded. Valve to be renewed as per sample (size-40mm, type-Globe)
30 in nos. illuminating deck ring corroded / deteriorated. To be renewed as per sample, Mat – MS, Size – 8 mm round bar, Length – ½ Ft, Scope of work includes removal of lagging, panelling and re-fitment.
20 in nos. Awning stanchion deck eye on upper deck corroded/ deteriorated. To be renewed as per sample. Size – 1 inch, Mat – MS
Jack staff and ensign staff shoe and eye corroded and broken. To be repaired/renewed as per sample
Top coat of macrotech discoloured at accommodation areas, galley, bathrooms (04) and cracked at few places alongwith underlay. Top coat to be applied on entire macrotech covered area. (area approx– 750 sqft) and also cater for underlay of 100 Sqft.
60 in no. Stanchion deformed/corroded and pitting holes observed at various places. Stanchion to be fabricated as per sample (mat- ms, length - 03 feet (approx), dia- 02 inch). Material firm supply.
Deck of bosun store to be surveyed by class surveyor. UTG to be taken at places recommended by class surveyor. Firm to cater for 40 points for UTG on deck.
Deck plate in port and stbd fan compartment corroded/holes at various places. plate to be renewed. (Mat–MS, Approx size- 40 CM X40 CM each, Thickness of plate-4 MM). Inway job included
ACCOMMODATION OF OFFICERS, SO’S AND OTHE
05 in nos bath room door locking arrangement perished/broken. Locking arrangement to be replaced as per sample.
02 in nos wash room main door perished/ broken. Door to be replaced as per sample.
25 in nos shoe locker sliding support deteriorated / uprooted to be replaced. (mat-GI)
GALLEY AND ASSOCIATED FITTINGS
Renew 02 in Nos grease filters(size-0.30M X 0.03M each) and clean the flue collector trunkings(Approx length- 5M, Trunk size- 30CM X15CM)
Washbasin drain pipe in ship’s galley corroded. Drain pipe to be renewed as per sample (Mat- MS, dia-40 mm, length approx- 1.2M)
Galley Washbasin tap and brass pipe corroded and deformed. Same to be renewed (size- 5 M , Mat-Cu)
RENEWAL OF MACHINERY COMPTS
MACHINERY COMPTS (FWD,AFT ENGINE ROOM AND WATER JET COMPT) Entire bilges, limber hole, frames, girders and stiffeners etc. in machinery compartment to be inspected i.e. forward E/R, aft engine room, MCR and jet compartment. All bilges to be dried and visual examination to be carried out for material state of internal hull structure and fittings by Class Surveyor. Firm to cater for 50 point for UTG. All frames, longitudinal, supports and bilge plate frames also to be surveyed. Defects observed to be noted and projected in AWRF. Entire bilge area to be scraped to bare metal, cleaned and painted with full paint scheme. Paint Firm supply. Paint scheme- Sigma scheme) (Approximate area 255 M2).
04 in nos drain pipe in fwd ER/AFT ER deteriorated and holes observed at various places. Pipe to be renewed as per sample (Dia 30 mm, Length approx- 3.5 mtr each, Mat - MS )
RENEWAL OF BATHROOM/ WC
Remove all scuppers, drain pipes of bath rooms and toilets and pipes to be chemically cleaned and pressure tested up to 03 bar. To be refitted after painting. (Pipe mat- MS,dia-50 MM, length-75M)
VOID SPACES AND TANKS
02 in nos. Fuel Oil storage tanks, 04 in nos. fuel oil RU tanks and 02 in nos, Lub Oil tanks to be opened and ventilate for man entry (gas free certificate to be provided by Firm prior commencement of job). Visual examination to be carried out for material state by class Surveyor and state of paint by paint manufacturer rep. Deteriorated areas to be chipped cleaned and painted with full paint scheme. Ensure all strainers, limber holes and valves are clear and thoroughly dry before applying paint. On completion tanks to be pressure tested up to 760 mm of Hg and manhole gasket to be renewed. The tanks to be cleaned, painted with suitable sigma paint scheme. Approx area- 310 M2. Paint Firm supply Sl Type of paint Paint QTY (ltr) a) Primer- Sigma guard 720 green - 82 lit b) Anticorrosive Sigma guard 720 grey 82 lit
01 in no. Dirty Water tank (Engine room), 01 in no. Waste Oil tank (Engine room) and 02 in nos. Shower and Bilge tanks (below bathroom and ship’s galley) to be opened and ventilated for man entry. Tanks to be cleaned and dried. Visual examination to be carried out for material state by Class Surveyor. Deteriorated areas to be chipped, cleaned and painted with full paint scheme. Ensure all strainers, limber holes and valves are clear and thoroughly dry before applying paint. On completion tanks to be pressure tested up to 760 mm of Hg and manhole gasket to be renewed. Approx area- 104 M2. Paint firm supply. Sl Type of paint Paint QTY (ltr) a) Primer- Sigma guard 720 green- 12 lit b) Anticorrosive- Sigma guard 720 grey- 12lit
01 in no. Fresh Water tank to be cleaned and dried. Visual examination to be carried out for material state by Class Surveyor. Deteriorated areas to be chipped, cleaned and painted with full paint scheme. Ensure all strainers, limber holes and valves are clear and thoroughly dry before applying paint. On completion tanks to be pressure tested up to 760 mm of Hg and manhole gasket to be renewed. Approx area-81 M2. Paint Firm supply. Sl Type of paint Paint QTY (ltr) a) Primer- Sigma cover 280 - 20 lit b) Anticorrosive- Sigma guard 720 green- 20 lit c) Anticorrosive - Sigma guard 720 grey- 20 lit
04 in nos. void spaces to be opened and ventilated for man entry. Visual examination to be carried out for material state by Class. Deteriorated areas to be chipped, cleaned and painted with full paint scheme. Manhole gasket to be renewed. Ensure all strainers, limber holes and valves are clear and thoroughly dry before applying paint. Paint Firm supply. Paint scheme-Sigma (Approximate area 215 sq. Mtrs) Sl Type of paint Paint QTY (ltr) a) Primer- Sigma cover 280 - 40 lit b) Anticorrosive- Sigma guard 720 green- 100 lit c) Anticorrosive- Sigma guard 720 grey- 100 lit
MAGAZINE SPRINKLING
4 m pipe lines to be dismantled cleaned and defects if any to be rectified and pressure tested. Test pressure – 1.5 times WP. ( Dia-40MM, Test pressure- 5 Kg/CM2, Mat – CuNi)
Operating valve to be overhauled, pressure tested, painted and proved.TP –1.5 times WP (Size-2.5MM,type – SD Valve,TP- 5 Kg/CM2 Qty– 01No).
FRESH WATER SYSTEM
Remove, Clean and pressure test the lines and fit back. (Pipe dia- 15 MM, approx. length- 20 M and pipe dia- 32 MM, approx length-8 M)
SCUPPERS AND DRAINS
02 nos deck drain pipes to be removed cleaned and pressure tested and fitted back. dia -40 mm Length- 4 m each, Mat-MS
VENTILATION SYSTEM
Blow through with HP air, ventilation trunking of all compartments other than magazines and then examine for any crack/hole. Specific defects to be projected in AWRF (Total length of trunking-120M, size- 18CM X 10CM and 15CM X 10CM.
Interior of galley exhaust trunking from canopy to be cleaned (preferably by dismantling and immersing in degreasing bath) and preserved. (Trunk size-0.35M X 0.15M, approx length-5M)
23 nos. breather pipes (Pipe dia - 65MM, Total length-23 M, Mat - MS) on weather deck to be opened, cleaned, painted. After removal the base of breather pipe on deck to be examined. Wire mesh (Dia-6 CM, Mat-SS) to be renewed and refitted with SS nut bolts (Qty-92 Nos). Breather flaps to be pasted with “Neoprene, Grade W” rubber sheet on the inner side. Butterfly nut & bolts (Mat-SS) for closing the flaps also to be renewed. Water tight integrity to be proved by chalk test. Sl Type of paint Paint QTY(ltr) a) Primer - Sigma cover 280 - 10 lit b) Anticorrosive -Sigma guard 380 grey - 10 lit c) Anticorrosive- Sigmadur White 550- 10 lit
10 nos. Mushroom on weather deck (Dia-0.60M, Height-0.25M) to be opened, cleaned and painted. After removal the base of mushroom on deck to be examined. Before fitting the mushroom gland packing to be renewed. Wire mesh to be renewed and refitted with SS nut bolts. Screw down flaps to be overhauled and their free movement to be checked. Flaps to be pasted with “Neoprene, Grade W“ rubber sheet on the inner side. Sl Type of paint Paint QTY (ltr) a) Primer - Sigma cover 280 - 10 lit b) Anticorrosive- Sigma guard 380 grey- 10 lit c) Anticorrosive- Sigmadur White 550 - 10 lit
08 in number vents of blowers on weather deck to be opened cleaned and painted. After removal the base of vent on deck to be examined. Before fitting the vent gland packing to be renewed. Hatches of vents to be checked for free movement. Rubber beading on these hatches to be renewed. Flaps to be pasted with Neoprene Grade W rubber sheet on the inner side. Water tight integrity to be proved by chalk test. Sl Type of paint Paint QTY (ltr) a) Primer - Sigma cover 280 - 10 lit b) Anticorrosive - Sigma guard 380 grey- 10 lit c) Anticorrosive - Sigmadur White 550 - 10 lit
06 fan casing (size- 1.25M X 1.10M each) and safety mesh in fan compartment and blower compartment to be opened, scraped and cleaned. Wire mesh (size- 1M X 0.67M each) to be renewed. On completion painting to be carried out.
Base of ventilation trunking of galley, victualling store, baggage store compartment and magazine on port side alleyway of ships deteriorated/ corroded and holed. To be re-fabricated and fitted as per sample.
ANCHOR AND CHAIN CABLE
Range out cable from cable locker. Remove portable perforated plates. Clear the sump and suction strainer box. Examine structure in vicinity of cable clench, shipside, plates and bars, stiffeners etc. Examine paint of Cable Locker material state of internal hull structure and fittings by Class Surveyor. Wooden panelling to be removed. Deteriorated areas of cable locker to be chipped, cleaned and full painting scheme to be applied. On completion wooden panelling to be refitted and painted as per sigma paint scheme. (Approximate surface Area 30 M2).
Anchor, Bottle Screw Slip, Blake Slips, Naval pipe and Scotch man plate to be inspected by class surveyor for condition. Firm to undertake survey of cable locker, clench, plates and bars, stiffeners in association with class surveyor and submit report. Firm to undertake survey, sweep blasting, gauging and painting of chain cable and associated fittings and anchor. Repairs / renewal if any, against AWRF. On completion of survey, yard to undertake cleaning and painting of cable locker as per touch up paint scheme. Carry out 01 final coat .
Survey the entire length of cable. All joining shackles and swivel piece to be break open, clean, grease and refit. Gauge the cable in consecutive links and record inspected by class surveyor for condition. Cable to be sweep blasted and apply paint. Any links dia found below permitted limits to be renewed. Change the cable end to end to ensure equality of wear. Mark the cable length. Move and lubricate anchor flukes. Machined surfaces of the joints of lug less joining shackles are to be examined for corrosion; all such shackles are to be stripped. If any part worn out, replace it. Length – 275 mtrs.
Load test to be carried out for Bottle screw slip(02 nos), Blake slip(02 nos) and Deck Clenches(04 nos). Test certificate to be submitted.
BOAT DAVIT/ HYDRAULIC DECK CRANE
Overhaul the clutches and hydraulic system. Prove the hydraulic system for 240 bar operating pressure. Change hydraulic hoses which are leaking and damaged. Replace hydraulic oil. Check the current rating (power pack). Open gearbox and inspect the gears for any physical damage. Dismantle the fixed arm and telescopic arm. Inspect the arms and replace bearings. Inspect the gliding plate units inside telescopic arms. Check all hydraulic valves and cylinders. On completion refit the system and prove for operation at specified SWL-7.5 KN.
Load test Deck crane together with all associated fittings, ropes, blocks pulleys etc. SWL-7.5 KN, static load-2 x SWL, Wire rope breaking strength 1960 Nm2, Wire rope dia-10 MM, Wire rope length 20M): (a) Proof test shall include (i) Hoist and lower the main hook (ii) Auxiliary hook load and boom (iii) Slewing and leafing (iv) Test of safety (v) Fail safe and limit switches (vi) Load movement (vii) Boom angle indicators (b) After testing the following should be examined (i) Foundation (ii) Sheaves and rope guides (iii) Wire ropes and end connectors (iv) Hoist, brakes and clutches (v) Hooks (vi) Bolting arrangements
5 TON TOWING HOOK
All surfaces to be shot blasted to SA 2.5. Spring to be tested/surveyed for adequate tension. On completion painting to be carried out. Load test to be carried out and certificate to be issued. Sl Type of paint Paint QTY (ltr) a) Primer- Sigma cover 280 - 04 lit b) Anticorrosive- Sigma Vikote 63 black- 04 lit
LADDER, RUNGS & STAIRS.
10 footsteps rubber mats each of 02 in nos. ladders of bridge and officer’s alleyway perished. To be renewed with as per sample (Mat.- rubber, length -55 cm, width-12cm)
ANCHOR CAPSTAN
Dismantle 02 in nos. capstan, cable holder and gear box. Strip down for examination of all bearings, bushes, shafts, gears, clutch and brake lining. Holding bolts to be removed and examined. Assembly gear oil to be changed. Brake lining to be renewed. Grease all pins. Operation of both capstans after assembly without and with load to be proved in both modes.
02 in nos Devil Claw Anchor chain stopper corroded and deformed. To be repaired/ renewed as per sample.
Naval/hawse pipe of both Anchors corroded/ deteriorated/ thinned. To be repaired as per sample.
Anchor platform stanchion shoes, securing pins and chains corroded deteriorated. To be repaired/renewed. SS pin and SS chain. (Pin 04 nos, Chain 04 nos, length 10 inch each pin and length of SS chain 10 mtr) .
MOORING CAPSTAN
Dismantle the capstan and lower the gear box. Strip down for examination of all bearing, bushes, shafts, gears (including worm and worm wheel), clutch and magnetic brake. Holding bolts to be removed and examined. On deck check oil and change. Grease all pins and adjust / replace. Test the capstan on no load and then on load and prove. Paint as per paint scheme.
STRUCTURAL FITTING – DOORS, HATCHES
Renew deteriorated rubber beadings of doors and hatches. Chalk test to be carried out. (Door size- 2M X 0.66 M, Qty- 09 external Nos, Hatch size- 0.63M X 0.63M, Qty- 05 Nos external and 02 internal).
05 in nos automatic hatch retainer to be fabricated for safe securing of hatches.
Hinges of 05 in nos hatches deteriorated. Same to be renewed.
02 in nos rubber beading for NWT door perished. To be replaced as per sample
STRUCTURAL FITTING –SIDE SCUTTLES, LIGHT
Renew the rubber seating of all scuttles, dead light covers and rubber seating of toughened glasses and hose test be conducted (04 nos).
BOLLARD AND CLEAT/STAG HORN
01 Stag horn (Mat-MS) and 02 cleats (Mat-MS) corroded and deformed. To be renewed. On completion of renewal NDT to be carried out. Stag horn size-Length- 1 feet,dia-4cm, Cleat – 8 inch 3 inch.
MISCELLANEOUS
Ships bilingual name “SavitribaiPhule” in Hindi and English on black acrylic sheet display on port/stbd bridge top side faded. To be renewed and refitted as per sample.
Port and Starboard bridge wings side bent /deformed. Same to be repaired including gas welding of corners.
Wooden board with ship’s name on both sides of bridge wings faded. To be polished as per sample.
28 Nos hatches locking handle misaligned. Same to be renewed as per sample and pressure/choke test to be carried out.
Laggings of explosive RU locker at quarterdeck deformed. To be renewed as per sample.
HMG cradle (port side) deteriorated. To be repaired as per sample.
20 Shoe racks deteriorated/ deformed in 18 Naviks mess and SO’s cabin. Same to be repaired/renewed as per sample.
FIRM SERVICES
All PAC and firm’s hull, engineering and electrical reps to embark onboard ship for Pre and Post refit trials. Firm to undertake post and pre refit trials with PAC reps of major equipment like Main Engine, waterjets etc. for jobs included in work package
Heavy duty blowers (08 no) to be provided for ventilation when ships AC / ventilation system is non-operational.
Firm to arrange gas free certificate for all Fuel/Lub oil tanks prior commencing of hot work. For this purpose, provision of blowers and visit of Inspector of Explosives is to be arranged.
A/C sea water cooling lines while in dock whenever A/C system of the ship is operational
Suitable provision of carry away pipes to be provided for grey water discharge during dry docking.
VISUAL SURVEY OF UNDERWATER HULL & APPENDAGES WITH CLASS SURVEYOR
After cleaning examine the whole under water area, Sigma paint manufacture rep, Ship Staff, Yard Rep, Qualified Hull Surveyor and CG Overseeing Team to carry out visual survey of underwater hull, appendages like fixed fins, spray rails, inside of shaft tunnels, jet buckets, impellers, sea chest and areas inside sea chest etc. and boot Top area including 500 mm above boot top area for signs of corrosion, damage, structural defect, major paint defect and submit report. Areas requiring specific examination to be marked for detailed examination. Bidder to provide necessary staging facility for close inspection. Post cleaning yard to undertake joint inspection of underwater hull and all appendages with class surveyor, CGRPT/COA and ships staff. Yard to submit class recommendations. All in way jobs included. Total area- 410 Sq. mtr.
HOMA ENGINEERING WORKS
YEOMAN MARINE SERVICES PVT. LTD.
ULTRA MARINE
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Restricted Tender
This is a Limited tender. Documents are accessible only to bidders authorized by the issuing authority on the government portal.
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .