Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.3 LAccepted-AOC AT KANTAPAHADA P S PO BANKI GHOLAPUR DIST CUTTACK | ₹23.3 L | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹24.1 L+₹81,771.45 (3.51%)Rejected-Finance AT WARD NO 49 PO JAGATPUR DIST CUTTACK PIN 754021 | CUTTACK | ODISHA | 754021 | ₹24.1 L+₹81,771.45 (3.51%) | L2 | Rejected-Finance Not qualified |
| 3 | L3₹24.9 L+₹1.7 L (7.10%)Rejected-Finance | ₹24.9 L+₹1.7 L (7.10%) | L3 | Rejected-Finance Not qualified |
| 4 | L4₹29.5 L+₹6.2 L (26.7%)Rejected-Finance | ₹29.5 L+₹6.2 L (26.7%) | L4 | Rejected-Finance Not qualified |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
17 Jun 2026, 5:00 pmClosed
OO Superintending Engineer, PH Division, Cuttack
OO Superintending Engineer, PH Division, Cuttack
Operation and maintenance of water supply system to Banki NAC for six months.
2026_PHEO_131597_1
SEPH-DIVISION, CTC- 11 (02) of 2026-27
Open Tender
Civil Works - Water Works
Percentage
180 days
Mahanadivihar
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹30,000
Yes
19 Aug 2026
9 Jun 2026
18 Jun 2026
9 Jun 2026
17 Jun 2026
9 Jun 2026
9 Jun 2026 - 11 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PART- A Operation and Maintainence work of 3 MLD WTP Water Supply project at Banki N.A.C. | |||||
| 1.01 | Supplying all labour, t&p and operating & monitoring of 2nos 25 H.P vertical turbine pump sets of raw water Intake well pump house during supply period to ensure proper water supply, operation of valves for regulating water supply, detection of leakage, theft and repair if any as per direction of engineer in charge. | - | Days | - | - |
| 1.02 | Supplying all labour, t&p and operating & monitoring of 3 MLD water treatment plant during supply period with running of plant machineries, valves & pump ssets, preparation of chemical doses & solutions, dosing chemicals, back washing of filter bed etc all complete as per the direction of Engineer-in-charge. | - | Days | 1 | - |
| 1.03 | Supplying all labour, t&p and operating & monitoring of 2nos 20 H.P clear water pump sets at Sahadapada pump house , 2nos 20 H.P clear water pump sets at Bedapur pump house, 2nos 20 H.P clear water pump sets at College Campus pump house, during supply period to ensure proper water supply, operation of valves for regulating water supply, detection of leakage, theft and repair if any as per direction of engineer in charge. | - | Days | - | - |
| 2PART-B Minor Maintenance works for six months | |||||
| 2.01 | Supplying all materials, labour, t&p and sweeping, cleaning of office Building, pump house, chemical house, W.T.P and Head work site including removal of debries, bushes,floating materials, trees, weeds at Intake well site & beautfication to W.T.P site with plantation, greeneries, watering to trees, lawn, cutting & cleaning etc as per direction of Engineer in charge. | - | Days | 1 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
DTCN.pdf
Tender Documents • 1.95 MB
BOQ_595597.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .