Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.2 LAccepted-AOC NAVELIM MARGAO GOA | SOUTH GOA | GOA | 403103 | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹11.2 LSame as L1Rejected-Finance HOUSE NO 517 2 EE NEAR CHAPEL QUEPEM GOA | SOUTH GOA | GOA | 403103 | L2 | Rejected-Finance second Lowest Bidder | |
| 3 | L3₹11.2 LSame as L1Rejected-Finance HNO 421 MATEMOROD SAO JOSE DE AREAL SALCETE GOA | SOUTH GOA | GOA | 403103 | L3 | Rejected-Finance third Lowest Bidder | |
| 4 | L4₹11.2 L−₹1.38 (<0.01%)Rejected-Finance | L4 | Rejected-Finance fourth Lowest Bidder |
Tender Value
₹14.1 L
EMD Value
₹28,130
Closing Date
6 Aug 2024, 5:00 pmClosed
EE II
Aquem Baixo Rawanfond
Construction of retaining wall to the nallah near Pieade Souza house to Bokti Tollem in Sy.No.49-1 at Kirbhat in village Nuvem of Salcete Taluka.
2024_WRD_16405_1
WDII/TECH/F17/4e/2024-25/SN3
Open Tender
Miscellaneous Works
Item Rate
90 days
Rawanfond
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹28,130
8 Oct 2024
24 Jul 2024
7 Aug 2024
24 Jul 2024
6 Aug 2024
24 Jul 2024
Amount
Earthwork in excavation by mechanical/manual means in all types of strata comprising any of the materials such as soil, sand, silt, clay, gravel, moorum of all varieties, shingles, pebbles, all types of conglomerates, laterite rock, soft rock, ordinary rock, disintergrated rock or weathered rock, fissured/shattered decomposed rock and all such other materials either in full or in parts as the case may be adopting any approved method or methods as may be convenient or permitted including chiseling, wedging etc. but blasting prohibited in all conditions such as dry, moist, saturated, submerged, foul conditions etc. including pumping or bailing out water / dewatering, including setting out construction of shoring, strutting and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, providing barricading, danger lighting, guarding etc. and backfilling the excavated earth to the extent required and disposing of surplus excavated soil/rock at specified areas with all leads and lifts etc. as per specification & drawing and as directed by the Engineer in Charge etc.
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: All works upto plinth level
Centering and shuttering including struttings, propping etc. and removal of formwork for: Foundations, footings, bases for columns and mass concrete
Laterite boulder masonry in cement concrete 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate of 40 mm nominal size) in foundation.
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer in charge 75mm Dia
FREDRICK ROSEVELT DIAS
WESTERN CONSTREUICTION
Vivek Arun Naik
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .