Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAccepted-Finance | ₹4.5 L | L1 | Accepted-Finance L1 |
| 2 | L2₹4.9 LAccepted-Finance | ₹4.9 L | L2 | Accepted-Finance L2 |
| 3 | L3₹5.5 LAccepted-Finance | ₹5.5 L | L3 | Accepted-Finance L3 |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | TIRUPATI ELECTRICALS L1 | SATKAR TRADERS L2 | Powertech Engineers L3 |
|---|---|---|---|---|---|---|
| 1.00 | Pliffer proof metering with cable and GI PIPE 2" Piping work alongwith providing and fixing albow,reducer and other required material for pliffer proofing,The work shall also include installation of SAMAST metering panel and associated hardware for SAMAST compliance. | 300 | mtr. | 900 ₹2.7 L | 950 ₹2.9 L | 500 ₹1.5 L |
| 2.00Laying of following size control cables from panel to metering cubical- | ||||||
| 3.00 | 4C X 2.5 sqmm | 100 | mtr. | 10 ₹1,000 | 15 ₹1,500 | 50 ₹5,000 |
| 4.00 | Termination of above cable in control panel and metering cubical (02 no. meters) | 24 | No. | 50 ₹1,200 | 100 ₹2,400 | 6,000 ₹1.4 L |
| 5.00 | Upgradation and Integration of C&R panel with existing SAS | 1 | No. | 1,80,000 ₹1.8 L | 1,99,000 ₹2.0 L | 2,50,000 ₹2.5 L |
Tender Value
₹5.9 L
EMD Value
₹6,000
Closing Date
2 Feb 2026, 4:00 pmClosed
S.E, ETC I, Lucknow
Pareshan Bhawan, Gomti Nagar, Lucknow
Work
2026_UPTCL_1109120_1
E-tender 99/ETC-ILKO/2025-26
Open Tender
Electrical Works
30 days
Pareshab Bhawan, Gomti Nagar, Lucknow
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
A/c No 2408002190005438, IFS PUNB0691100, PNB, Lko
₹6,000
13 Mar 2026
24 Jan 2026
3 Feb 2026
24 Jan 2026
2 Feb 2026
24 Jan 2026
Pliffer proof metering with cable and GI PIPE 2" Piping work alongwith providing and fixing albow,reducer and other required material for pliffer proofing,The work shall also include installation of SAMAST metering panel and associated hardware for SAMAST compliance.
Laying of following size control cables from panel to metering cubical-
4C X 2.5 sqmm
Termination of above cable in control panel and metering cubical (02 no. meters)
Upgradation and Integration of C&R panel with existing SAS
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
BOQ_2047956.xls
BOQ • 0.27 MB
td.pdf
Tender Documents • 0.84 MB
Download all tender documents and submit your bid