| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹23.6 LAccepted-AOC | 1 | Accepted-AOC 1 | |
| 2 | 2₹25.9 L+₹2.3 L (9.89%)Rejected-AOC | 2 | Rejected-AOC 2 |
Tender Value
Refer Docs
EMD Value
₹66,000
Closing Date
26 Sept 2022, 11:00 amClosed
EE RCD
BAREILLY
Reconstruction of VRB of BAREILLY DY KM 7.050 as Box Culvert
2022_UPIDC_730316_2
05/EE/RCD/2022-23
Open Tender
Civil Works - Canal
Item Rate
30 days
BAREILLY
Please refer Tender documents.
3 documents required · 3 mandatory
₹354
₹66,000
10 Nov 2022
21 Sept 2022
26 Sept 2022
21 Sept 2022
26 Sept 2022
21 Sept 2022
Amount
Earth work in foundation in dry soil including lift up to 1.50 M & lead up to 30 M back filling, waterring and ramming of excavated earth into the trenches and disposal of surplus earth as directed by the Engineer-in-Charge.
Shuttering for C.C. blocks and concrete including cost of shuttering, material, labour and T&P required for proper completion of work etc.
Laying C.C. 1:2:4 Mix (M-15) with Cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering.
Centering & shuttering for R.C.C. work including cost of centering & shuttering material, labour and T&P required for proper completion of work etc.
Reinforcement including cutting, bending & binding in position including all cost of labour, material and T&P etc. complete.
Laying C.C. 1:1.5:3 Mix (M-20) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement.
Laying R.C.C. 1:1.5:3 Mix (M-20) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement.
Laying R.C.C. 1:1:2 Mix (M-25) with Cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement.
Laying R.C.C. 1:1:2 Mix (M-30) with Cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement.
Supplying and laying tarfelt sheet below aproach slab as paper bearing including cost of all material labour and T&P required for proper completion of work.
Supplying & Fixing 100 MM dia pipe for drain spout including cost of all material, labour and T&P etc. required for proper completion of work.
Providing weep holes in structure including cost of all material (100 mm dia P.V.C. pipe etc.), labour and T&P etc. required for proper completion of work.
Dismantling Brickwork or stone work and cement concrete in cement mortar and including stacking of material with in a distance of 60 m as per direction of Engineer in Charge
Supplying, laying and consolidation 150 mm thick loose to 100mm of brick ballast size 20 mm to 40 mm by hand roller including cost of all , labour and T&P etc( old dismenteld brick used for floor,flexible apron.required for proper completion of work.
m/s shree mahakal construction
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .