Loading…
Loading…
Tender Value
₹1.8 L
EMD Value
₹3,640
Closing Date
2 Sept 2026, 4:00 pm
Office of The Executive Engineer RnB Division Patt
Office of The Executive Engineer RnB Division Pattan
Upgradation/Development of Lawn at Govt. Higher Secondary School Khaipora, Zone Tangmarg
2026_PWDJK_321531_2
NIT 50 of RnB Pattan 2026-27
Open Tender
Civil Works
Percentage
45 days
Office of The Executive Engineer RnB Division Patt
Please refer Tender documents.
5 documents required · 5 mandatory
₹200
Office of The Executive Engineer RnB Division Patt
₹3,640
19 Aug 2026
19 Aug 2026
3 Sept 2026
20 Aug 2026
2 Sept 2026
20 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearance of Site (BWO demolishing kacha packa parapet around the site periphery) etc incl disposal of debris etc beyound limits in ecofriendly manner complete as desired and directed by the engineer incharge-to prevail working conditions at site including providing and maintaing
gangway | 1 | Job | 1,500 | ₹1,500 |
| 2 | Excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer
with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m in All kinds of soil | 250 | Cum | 276.6 | ₹69,150 |
| 3 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:1 meter from cutting edge | 9.18 | Cum | 479.3 | ₹4,399.97 |
| 4 | P/L of Dry stone soling duly hand packed including all carriages loading unloading complete job before laying of mud mate in trenches and in floors: | 3.06 | Cum | 1,000 | ₹3,060 |
| 5 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 1.53 | Cum | 5,667.9 | ₹8,671.89 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering all work upto plinth level in 1:2:4 (1 cement : 2coarse sand : 4 stone aggregate 20mm nominal size) including curing complete including all carriage | 6.12 | Cum | 7,056.25 | ₹43,184.25 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. For all levels of Foundation/Plinth | 40.15 | Sqm | 286.35 | ₹11,496.95 |
| 8 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting , hoisting , fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes | 234.1 | Kg | 156.95 | ₹36,741.99 |
| 9 | Painting with ready mixed synthetic enemal paint of approved brand and manufacture in all shades to give an even shade (new Steel Work). Two or more coats on new work over a priming coat of ready mixed red oxide Zinc Chromate primer of approved brand and manufacture on steel galvanized iron/steel works | 4.62 | Sqm | 195.65 | ₹903.9 |
| 10 | Providing and fixing PVC 20 Conduits incl joints like T, L, in slab all complete- for laying of electric conductor: (LMR) | 100 | RM | 25 | ₹2,500 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_1074195.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].