Loading…
Loading…
Tender Value
₹98,000
EMD Value
₹1,960
Closing Date
7 Aug 2026, 6:00 pm6d left
Executive Engineer
Office Of The Executive Engineer REW Samba
Please Refer as per BOQ
2026_RDPR_317946_17
40 REW Samba of 2026-27, Dated 25.07.2026
Open Tender
Civil Works
Percentage
30 days
Samba
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer REW samba
₹1,960
27 Jul 2026
27 Jul 2026
8 Aug 2026
27 Jul 2026
7 Aug 2026
27 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth and disposal of surplus excavated earth as directed by engineer incharge | 14.86 | cum | 479.3 | ₹7,122.4 |
| 2 | Providing and Laying in position cement concrete of specified grade excluding the cost of centring and shuttering – All work upto plinth level 1: 5: 10: ( 1: cement 5: coarse sand : 10 graded crushed stone aggregate 40mm nominal size | 2.3 | cum | 4,826.5 | ₹11,100.95 |
| 3 | Providing and Laying in position cement concrete of specified grade excluding the cost of centring and shuttering – All work upto plinth level 1: 3: 6: ( 1: cement 3: coarse sand : 6 graded crushed stone aggregate 20mm nominal size (80% concrete) | 5.09 | cum | 5,733.6 | ₹29,184.02 |
| 4 | 20% boulder | 1.2 | cum | 700 | ₹840 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 0.55 | cum | 6,591.25 | ₹3,625.19 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for: drain | 55.76 | sqm | 286.35 | ₹15,966.88 |
| 7 | 12mm plaster 1:6 | 41.82 | sqm | 266 | ₹11,124.12 |
| 8 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete. 20.6.1 Non-pressure NP-3 class (Medium duty) R.C.C. pipes 20.6.1.1 450 mm dia. R.C.C. pipe | 7.31 | rmt | 2,008.8 | ₹14,684.33 |
| 9 | carriage of sand and bajri for 5 km by MT | 11.49 | cum | 200.74 | ₹2,306.5 |
| 10 | carriage of stone 5km by mt | 1.2 | cum | 236 | ₹283.2 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.97 MB
BOQ_1044868.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].