Loading…
Loading…
Tender Value
₹1.5 Cr
EMD Value
₹1.6 L
Closing Date
15 Jul 2026, 6:00 pm7d left
Executive Engineer, R & B Panchayat Division, Anand
Construction of Various Roads Under Suvidhapath (Normal) in Petlad Taluka Dist. Anand Pkg. No. AND/Suvidhapath/2025-26/06
321790
01/2026-27
Open
Civil Works - Roads
Anand
1 document required · 1 mandatory
₹3,600
Executive Engineer R And B Panchayat Division Anand
₹1.6 L
7 Jul 2026
7 Jul 2026
7 Jul 2026
15 Jul 2026
7 Jul 2026
Name Of Work :- Construction of Various Roads Under Suvidhapath (Normal) in Petlad Taluka Dist. Anand Pkg. No.
AND/Suvidhapath/2025-26/06
Taluka :Petlad District : Anand
1 Construction of CC Pavement on Sihol Aradi Porada Road (VR) Km. 0/000 to 0/630 Ta.:-Petlad Dist.:- Anand
2 Construction of CC Pavement on Bhavanipura Vatav Road (VRNP) Km. 0/000 to 0/320 Ta.:- Petlad Dist.:- Anand
3 Construction of CC Pavement on Manej Manpura Road (VR) Km. 0/000 to 0/310 Ta.:-Petlad Dist.:- Anand
Bill of Quantities
Item of work Quantities Rate in Amount
Estimated UnitFigures in
1 Earthwork for embankment including breaking clods, dressing with all lead and 4024.00 Cum 180.88
lift (including watering and consolidation) (C) From Borrowarea within all lead
2 Box cutting the road surface to proper slope and camber for making a base for 3268.00 Cum 109.42
road work including removing the excavated stuff and depositing on the road
side slope as directed upto all lead.
3 Providing laying and spreading mix material gradation equivalent to GSB grade 1154.00 Cum 1747.68
II ,MCBT Metal 20-40 mm with Fine aggregate material in required proportion
so as to have, mixing in place with rotavator and grading with mortar grader at
OMC and compacted with vibratory roller 80 to 100 KN static weight to achieve
desired density etc. complete
4 Conveyance of excavated earth/ unuseable material available from box cutting/ 901.00 Cum 258.56
scarifying the existing road surface etc. up to 1.0 km. lead including loading,
unloading and spreading the material on road side as and where directed.
5 Supplying and fixing reinforced concrete heavy dutynon-pressure pipes with 75.00 Rmt 1053.39
collars for culverts includingsetting and joining the pipes in C.M. 1:2 watering
andlaying (To level of slops of I.S. 458 / 1971 Class NP4 offollowing internal
diameter. (i) 300 mm dia.
6 Providing and fixing pre-cast Rubber Dye / steel Dye inter locking concrete 1527.00 Sq.mt 706.93
block 60mm thick with grade of concrete M300 pnumatic compressed / vibrated
mechanically and as per approved design Confirming to IS 15658 :
including 35 mm Sand layer for levelling and filling the joint with sand in proper
line and level as per guidlines of IRC : SP 63-2018 etc. Complete.
7 Dry Lean Cement Concrete Sub- base:- Construction of dry lean cement 550.00 Cum 2710.52
concrete Sub- base over a prepared sub-grade with coarse and fine aggregate
conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm,
aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to
be as per table 600-1, optimum moisture content to be determined during trial
length construction, concrete strength not to be less than 10 Mpa at 7 days,
mixed in a batching plant, transported to site, laid with a conventional method,
compacting with 8-10 tonnes vibratory roller, finishing and curing etc. complete.
8 Cement Concrete Pavement:- Construction of un reinforced, dowel jointed, 1386.00 Cum 6835.46
plain cement concrete pavement over a prepared sub base with concrete grade
M300, coarse and fine aggregate conforming to IS 383, maximum size of coarse
aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per
approved mix design, transported to site, laid with a fixed form or slip form
paver, spread, compacted and finished in a continuous operation including
provision of contraction, expansion, construction and longitudinal joints, joint
filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel
bar, tie rod, admixtures as approved, curing compound, finishing to lines and
grades as per drawing
02. Sch B_Suvidhapath_Petlad_Pkg_06 Page
Item of work Quantities Rate in Amount
Estimated Unit Figures in
9 Providing & fixing logo board of Suvidhapath as per standard design of 3.00 No. 3651.15
National Rural Road Development Agency diamond size 600 x 600 mm
1.50mm thick plate & board size 900 x 250mm , 1.50mm thick M.S. plate and
2.40 meter deep length single angle 75 x 75 x 6 mm size incl. fitting & painting
lettering with luminous colour as per drawing including fixing in C.C. 1:3:6 etc.
Rupees One Crore Fifty Four Lakh(s) Sixty Nine Thousand Three Hundred Ninety Three And Paise
I / We am / are willing to carryout the work at ………..% above/Below percent (………………………. Percent above/Below)
(Should be written in figure and words) of the estimated rates mentioned above. Amount of my / our tender worked out as
Estimated amount put to tender Rs: ……………. Estimated amount put to tender Rs: …………...
Deduct……% below Rs: …………………………. Add……% above Rs: ………………………….…
(Please strike out which ever is not applicable.)
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra
payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017 Cement
Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost of
difference of cement consumption have been deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Quantities rate and wordings of items are as per estimate and calculation in the Sch. - B are airthmatically checked.
Above all items of "Schedule-B" with Item Description, Unit, Rate & Amount have verified by me and found
Sr.Divisional Account Officer Dy.Executive Engineer
Panchayat (R & B) Division Panchyat (R & B) Sub Division
Signaturre of contractor Executive Engineer
with seal Panchayat (R & B) Division
02. Sch B_Suvidhapath_Petlad_Pkg_06 Page
Name Of Work :- Construction of Various Roads Under Suvidhapath (Normal) in Petlad Taluka Dist.
Anand Pkg. No. AND/Suvidhapath/2025-26/06
Taluka :Petlad District : Anand
INDEX OF SPECIFICATION
Applicable Separate Road
Specification booklet attached
Tender Discription of item as per schedule "B" of the tender.
Item No. Pg No.
1 Earthwork for embankment including breaking clods, dressing with all lead and lift Attached Separetely
(including watering and consolidation) (C) From Borrowarea within all lead
2 Box cutting the road surface to proper slope and camber for making a base for road Attached Separetely
work including removing the excavated stuff and depositing on the road side slope as
directed upto all lead.
3 Providing laying and spreading mix material gradation equivalent to GSB grade II Attached Separetely
,MCBT Metal 20-40 mm with Fine aggregate material in required proportion so as to
have, mixing in place with rotavator and grading with mortar grader at OMC and
compacted with vibratory roller 80 to 100 KN static weight to achieve desired density
4 Conveyance of excavated earth/ unuseable material available from box cutting/ Attached Separetely
scarifying the existing road surface etc. up to 1.0 km. lead including loading, unloading
and spreading the material on road side as and where directed.
5 Supplying and fixing reinforced concrete heavy dutynon-pressure pipes with collars for Attached Separetely
culverts includingsetting and joining the pipes in C.M. 1:2 watering andlaying (To
level of slops of I.S. 458 / 1971 Class NP4 offollowing internal diameter. (i) 300 mm
6 Providing and fixing pre-cast Rubber Dye / steel Dye inter locking concrete block Attached Separetely
60mm thick with grade of concrete M300 pnumatic compressed / vibrated
mechanically and as per approved design Confirming to IS 15658 : 2006 including
mm Sand layer for levelling and filling the joint with sand in proper line and level as
per guidlines of IRC : SP 63-2018 etc. Complete.
7 Dry Lean Cement Concrete Sub- base:- Construction of dry lean cement concrete Sub- Attached Separetely
base over a prepared sub-grade with coarse and fine aggregate conforming to IS:
the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed
15:1, aggregate gradation after blending to be as per table 600-1, optimum moisture
content to be determined during trial length construction, concrete strength not to be
less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a
conventional method, compacting with 8-10 tonnes vibratory roller, finishing and
curing etc. complete.
8 Cement Concrete Pavement:- Construction of un reinforced, dowel jointed, plain Attached Separetely
cement concrete pavement over a prepared sub base with concrete grade M300, coarse
and fine aggregate conforming to IS 383, maximum size of coarse aggregate not
exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design,
transported to site, laid with a fixed form or slip form paver, spread, compacted and
finished in a continuous operation including provision of contraction, expansion,
construction and longitudinal joints, joint filler, separation membrane, sealant primer,
joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing
Applicable Separate Road
Specification booklet attached
Tender Discription of item as per schedule "B" of the tender.
Item No. Pg No.
9 Providing & fixing logo board of Suvidhapath as per standard design of National Rural Attached Separetely
Road Development Agency diamond size 600 x 600 mm , 1.50mm thick plate & board
size 900 x 250mm , 1.50mm thick M.S. plate and 2.40 meter deep length single angle
75 x 75 x 6 mm size incl. fitting & painting lettering with luminous colour as per
drawing including fixing in C.C. 1:3:6 etc. complete.
Deputy Executive Engineer Executive Engineer
Panchayat (R & B) Sub Division Panchayat (R & B) Division
Name Of Work :- Construction of Various Roads Under Suvidhapath (Normal) in Petlad Taluka Dist. Anand Pkg. No.
AND/Suvidhapath/2025-26/06
Taluka :Petlad District : Anand
SCHEDULE FOR TESTING OF MATERIALS
For ensuring quality control and workmanship, various tests prescribed below for materials shall be taken at periodical intervals as stipulated below.
The material should be tested in GERI or Private laboratory approved by Govt. of Gujarat. Bill for testing charges should be paid Govt.
Item No. as Brief Description of materials to be Qty. of Unit Prescription of test which Frequency @ which test shall be Total Nos of
per tested. Materials shall be carried out carried out test to be
Schedule 'B' taken
1 45 to 90 MC.Metal Cum *Gradation test 1 to 100 - cum. 1 test
*Impact Value 100 to 500 - cum. 3 test
*Flakiness Index of 500 to 1500 - cum. 5 test
2 40 to 63 M.C.Metal 0.00 Cum *Gradation test 1 to 100 - cum. 1 test
*Impact Value 100 to 500 - cum. 3 test
*Flakiness Index of 500 to 1500 - cum. 5 test
1500 to 5000 - cum. 7 test
3 25 to 40 M.C.Metal 0.00 Cum *Gradation test 1 to 100 - cum. 1 test
*Impact Value 100 to 500 - cum. 3 test
*Flakiness Index of 500 to 1500 - cum. 5 test
1500 to 5000 - cum. 7 test
4 Kapchi 20 mm Nominal 2490.60 Cum *Gradation test 1 to 100 - cum. 1 test
*Impact Value 100 to 500 - cum. 3 test
*Flakiness Index of 500 to 1500 - cum. 5 test
1500 to 5000 - cum. 7 test
5 Grit (6 mm) 0.00 Cum *Gradation test 1 to 100 - cum. 1 test
*Impact Value 100 to 500 - cum. 3 test
*Flakiness Index of 500 to 1500 - cum. 5 test
1500 to 5000 - cum. 7 test
6 Grit as Key aggregate (12 mm) 0.00 Cum *Gradation test 1 to 100 - cum. 1 test
*Impact Value 100 to 500 - cum. 3 test
*Flakiness Index of 500 to 1500 - cum. 5 test
1500 to 5000 - cum. 7 test
02. Sch B_Suvidhapath_Petlad_Pkg_06
Item No. as Brief Description of materials to be Qty. of Unit Prescription of test which Frequency @ which test shall be Total Nos of
per tested. Materials shall be carried out carried out test to be
Schedule 'B' taken
7 Water Suspended Solids (IS 3025 Part 17)
Sulphets (IS 3025 Part 24)
Chlorides (IS 3025 Part 32) Sample taken at each source tested at an approved test house
7 Supplying of Quarryspall 0.00 Cum *Gradation,CBR One test per work
8 Supplying of Sand/ 733.00 Cum *Silt Content,F.M One test per 250 cum.
9 Stonedust 438.52 Cum *Gradation test 1 to 100 - cum. 1 test
*Impact Value 100 to 500 - cum. 3 test
*Flakiness Index of 500 to 1500 - cum. 5 test
1500 to 5000 - cum. 7 test
10 Sel;ected Soil for Embankment 4024.00 Cum P.I ,CBR,MDB
11 Rubble 0.00 Cum *Density & Los Angeles abrasion As per IRC:SP:116-2018
12 Asphalt (VG-30) 0.00 M.T. Viscosity Test Tanker test in Geri Lab. Only
as per I.S. 1206 Up to 10
Above 50 one per Tanker
Ductility Test As per I.S.
Specification Gravity test As per I.S.
Softening point test As per I.S.
Quality of binder test 3 test per 2 tankers on plant site.
13 Tack Coat *Binder Temperature for application
Irregular close in intervals
*Rate of spread of Binder. 2 test per Day.
02. Sch B_Suvidhapath_Petlad_Pkg_06
Item No. as Brief Description of materials to be Qty. of Unit Prescription of test which Frequency @ which test shall be Total Nos of
per tested. Materials shall be carried out carried out test to be
Schedule 'B' taken
14 Carpet & Seal Coat. Mix Grading One Test on Individual
Temperature of binder in Boilor Constituents and mixed aggregates from the
aggregates in the dryer and dryer for each 100 tonnes of mix subject to
mix at the time of laying and minimum of Two tests per plant per day.
rolling. ( Binder content One Test for each 100 tones of mix
vide 45/MD. 2172) subjects to minimum of two per Day.
Rate of Spreaded mix materials. Regular control through checks on layer
15 Cement (OPC) 637.082 M.T. *Consistency,Soundness 1 test @ 50.0 M.T. 100 T 2 tests,
*Setting time,Finessness Test 200 T 3 tests, 300 T 4 tests, 500 T 5 tests,
*Compressive Strength. 800 T 6 tests, 1300 T 7 tests & 8 testd
for large consingment.
16 Steel (TMT) 0.00 M.T. *Tensile, (TMT) As per Manual of Quality Control
Yield 1 test/40 tonnes / per category
17 C.C.Cube Test 1:2:4 *Compressive Strength. 1 to 5 cmt - 1 No
M300 1386.00 51 to above - 4 +1 additional sample
for each 50 cu.mt. Or part there of.
02. Sch B_Suvidhapath_Petlad_Pkg_06
Item No. as Brief Description of materials to be Qty. of Unit Prescription of test which Frequency @ which test shall be Total Nos of
per tested. Materials shall be carried out carried out test to be
Schedule 'B' taken
18 Retro Reflective Sheeting for the signage 0.00 Nos. as per Test schedule attached GR SOR/1018/715/Part file/C-1 Dtd.4/6/19
19 Road studs / Cat Eyes 0.00 Nos. as per Test schedule attached GR SOR/1018/715/Part file/C-1 Dtd.4/6/19
20 Hot Applied Thermoplast Road Marking 0.00 Sqmt as per Test schedule attached GR SOR/1018/715/Part file/C-1 Dtd.4/6/19
Note (1):- In case of excess in quantity. Further more test shall be carried out as per required frequency.
Note (2):- Apart from above listed materials for carrying out various tests during Road / Structure
Construction Works , if any other than above mentioned material/s are to be used during road /
structure construction work then it must be tested as per prevailing criteria of Govt. of Gujarat (R &
B Deptt.) and necessary tests should be carried out as per prevailing norms.
Signature of Contractor. Deputy Executive Engineer Executive Engineer
Panchayat (R & B) Sub Division Panchayat (R & B) Division
02. Sch B_Suvidhapath_Petlad_Pkg_06
Name Of Work :- Construction of Various Roads Under Suvidhapath (Normal) in Petlad Taluka Dist. Anand Pkg. No.
AND/Suvidhapath/2025-26/06
Taluka :Petlad District : Anand
QUANTITY SUMMARY STATEMENT
Construction of CC Pavement on Construction of CC Pavement on Construction of CC Pavement on
Sihol Aradi Porada Road (VR) Km. Bhavanipura Vatav Road (VRNP) Manej Manpura Road (VR) Km.
Total Qty & Amount
Sr 0/000 to 0/630 Ta.:-Petlad Dist.:- Km. 0/000 to 0/320 Ta.:- Petlad 0/000 to 0/310 Ta.:-Petlad Dist.:-
Item. Unit Anand Dist.:- Anand Anand
Qty Rate Amount Qty Rate Amount Qty Rate Amount Qty Total Amount Av.Rate Tender Amount
Qty Rate Amount Qty Rate Amount Qty Rate Amount Qty Total Amount Av.Rate Tender Amount
1 Earthwork for embankment including breaking clods, dressing with all lead Cum 2097.00 180.88 379305.36 881.00 180.88 159355.28 1046.00 180.88 189200.48 4024.00 727861.12 180.88
and lift (including watering and consolidation) (C) From Borrowarea within
2 Box cutting the road surface to proper slope and camber for making a base for Cum 1634.00 109.42 178792.28 830.00 109.42 90818.60 804.00 109.42 87973.68 3268.00 357584.56 109.42
road work including removing the excavated stuff and depositing on the road
side slope as directed upto all lead.
3 Providing laying and spreading mix material gradation equivalent to GSB Cum 577.00 1680.64 969729.28 293.00 1702.86 498937.98 284.00 1930.11 548151.24 1154.00 2016818.50 1747.68
grade II ,MCBT Metal 20-40 mm with Fine aggregate material in required
proportion so as to have, mixing in place with rotavator and grading with
mortar grader at OMC and compacted with vibratory roller 80 to 100 KN
static weight to achieve desired density etc. complete
4 Conveyance of excavated earth/ unuseable material available from box Cum 491.00 258.56 126952.96 249.00 258.56 64381.44 161.00 258.56 41628.16 901.00 232962.56 258.56
cutting/ scarifying the existing road surface etc. up to 1.0 km. lead including
loading, unloading and spreading the material on road side as and where
5 Supplying and fixing reinforced concrete heavy dutynon-pressure pipes with Rmt 45.00 1053.39 47402.55 22.50 1053.39 23701.28 7.50 1053.39 7900.43 75.00 79004.25 1053.39
collars for culverts includingsetting and joining the pipes in C.M. 1:2 watering
andlaying (To level of slops of I.S. 458 / 1971 Class NP4 offollowing internal
diameter. (i) 300 mm dia.
6 Providing and fixing pre-cast Rubber Dye / steel Dye inter locking concrete Sq.mt 763.00 706.93 539387.59 388.00 706.93 274288.84 376.00 706.93 265805.68 1527.00 1079482.11 706.93
block 60mm thick with grade of concrete M300 pnumatic compressed /
vibrated mechanically and as per approved design Confirming to IS 15658 :
2006 including 35 mm Sand layer for levelling and filling the joint with sand
in proper line and level as per guidlines of IRC : SP 63-2018 etc. Complete.
7 Dry Lean Cement Concrete Sub- base:- Construction of dry lean cement Cum 275.00 2657.31 730760.25 140.00 2674.48 374427.20 135.00 2856.28 385597.80 550.00 1490785.25 2710.52
concrete Sub- base over a prepared sub-grade with coarse and fine aggregate
conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm,
aggregate cement ratio not to exceed 15:1, aggregate gradation after blending
to be as per table 600-1, optimum moisture content to be determined during
trial length construction, concrete strength not to be less than 10 Mpa at
days, mixed in a batching plant, transported to site, laid with a conventional
method, compacting with 8-10 tonnes vibratory roller, finishing and curing
8 Cement Concrete Pavement:- Construction of un reinforced, dowel jointed, Cum 693.00 6781.14 4699330.02 352.00 6799.32 2393360.64 341.00 6983.14 2381250.74 1386.00 9473941.40 6835.46
plain cement concrete pavement over a prepared sub base with concrete grade
M300, coarse and fine aggregate conforming to IS 383, maximum size of
coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant
as per approved mix design, transported to site, laid with a fixed form or slip
form paver, spread, compacted and finished in a continuous operation
including provision of contraction, expansion, construction and longitudinal
joints, joint filler, separation membrane, sealant primer, joint sealant,
debonding strip, dowel bar, tie rod, admixtures as approved, curing
compound, finishing to lines and grades as per drawing
Construction of CC Pavement on Construction of CC Pavement on Construction of CC Pavement on
Sihol Aradi Porada Road (VR) Km. Bhavanipura Vatav Road (VRNP) Manej Manpura Road (VR) Km.
Total Qty & Amount
Sr 0/000 to 0/630 Ta.:-Petlad Dist.:- Km. 0/000 to 0/320 Ta.:- Petlad 0/000 to 0/310 Ta.:-Petlad Dist.:-
Item. Unit Anand Dist.:- Anand Anand
Qty Rate Amount Qty Rate Amount Qty Rate Amount Qty Total Amount Av.Rate Tender Amount
Qty Rate Amount Qty Rate Amount Qty Rate Amount Qty Total Amount Av.Rate Tender Amount
9 Providing & fixing logo board of Suvidhapath as per standard design of No. 1.00 3651.15 3651.15 1.00 3651.15 3651.15 1.00 3651.15 3651.15 3.00 10953.45 3651.15
National Rural Road Development Agency diamond size 600 x 600 mm
1.50mm thick plate & board size 900 x 250mm , 1.50mm thick M.S. plate and
2.40 meter deep length single angle 75 x 75 x 6 mm size incl. fitting &
painting lettering with luminous colour as per drawing including fixing in
C.C. 1:3:6 etc. complete.
Details Of Difference
Credit For Dismentalling & Reuse Material 0.00 0.00
Add For Utility Shifting 0.00 0.00 0.00 0.00
Diff.due to rounding off & 6.16 3.00 8.65 17.80
Calculation / Airthmatic Mistake Diff. for av.rate
Deputy Executive Engineer Executive Engineer
Panchayat (R & B) Sub Division Panchayat (R & B) Division
Name Of Work :- Construction of Various Roads Under Suvidhapath (Normal) in Petlad Taluka
Dist. Anand Pkg. No. AND/Suvidhapath/2025-26/06
Taluka :Petlad District : Anand
GENERAL INFORMATION
1 Amount of administrative approval with authority Suvidhapath Normal (2025-26)
2 Cost of work put to tender Rs.
3 Amount of Technical Sanctioned with authority Ts. For Rs 9233910 By E.E.Panchyat
,Panchayat (R&B) Division, Anand, as per
Item No 309 Pg No 42 in March
Ts. For Rs 4664340 By E.E.Panchyat
,Panchayat (R&B) Division, Anand, as per
Item No 311 Pg No 42 in March
Ts. For Rs 4666190 By E.E.Panchyat
,Panchayat (R&B) Division, Anand, as per
Item No 310 Pg No 42 in March
4 Time limit provided for completion of work 9 (Nine) Months (Including Monsoon Period)
(Basis for working out time limit to be given)
5 Details of materials provided in Schedule " A " NIL
(Calculation should be attached) ……….
6 Date of issue / Receipt of tender ……….
7 Budget provision …………………………
8 Whether work put to tender is for whole work or Whole Work
as sanctioned or, part of it ………………….
9 If work is splitting up, Details of splitting with Not splitted
authority approving the split
10 In case it is to be part of remaining work, NIL
reason as to why it is not included
11 The amount and details of items not included in No Such items
tender with reason there of and how you
prepare in executed the work with complete
financial picture…..
12 In case the work is abandoned by previous No
agency, action taken against defaulting agency
13 If, there is any variation from the sanctioned No
estimate, State
14 Certificate of Division A.E. / A.A.E. / D.E.E. for Attached
drafting of specification and proper preparation
of DTP. Schedule "A" including arithmetical
15 Weather correction slip in printed form are …….
16 Validity period 120 ( One hundred twenty ) days
17 Whether L.A. proceeding has been completed. N/A
Deputy Executive Engineer Executive Engineer
Panchayat (R & B) Sub Division Panchayat (R&B) Division
Name Of Work :- Construction of Various Roads Under Suvidhapath (Normal) in
Petlad Taluka Dist. Anand Pkg. No. AND/Suvidhapath/2025-26/06
(To be accompained with submission of D.T.P.)
(1) TENDER FORM
1. Whether the all clauses are enclose as per :- Yes
Government replaced by the latest ?
2. If so, state the number-wise details instructions :- Yes
3. Whether time limit is entered, it is proportion with :- Yes
the amount and nature of work
4. Whether the correct name of work as per sanctioned :- Yes
estimate is entered ?
5. Whether the other details viz. mention deposit etc. are :- Yes
written in the tender form ?
(2) SCHEDULE - A
1. Whether Schedule gives details of the materials to be :- Yes // No
supplied by the Department ?
2. Does it mention the correct place of delivery of :- Yes // No
materials to be supplied under Schedule-A
3. Whether the rates of materials are mentioned in :- Yes // No
4. Whether the rates of entered in Schedule-A is :- Yes // No
correctly derived ?
5. Whether quantity of materials is correctly arrived as :- Yes // No
(3) SCHEDULE - B
1. Whether the description of each item literally tally :- Yes
with the sanctioned estimate except specifying of
lead, lift etc.
2. Whether quantity of each item is as per sanctioned :- Yes
estimate, if not state the reasons with due justification
for deviation D.T.Ps.
3. Whether the rate for each item is as per sanctioned :- Yes
estimate ? if not, state the reasons with the
justification for deviation in covering letter of the
D.T.P. and incorporate the rate analysis in the D.T.P.
4. Whether the rates of each item in Schedule-B is :- Yes
mentioned in words in case of Item Rate Tender ?
5. Whether the unit of each item is as per sanctioned :- Yes
estimate ? If not, state the reasons with the
justification for deviation in covering letter of the
6. Whether the standard method is adopted in each items :- Yes
in writing the observed as Cum. and not C.M. etc.
7. Whether the Government remarks, if any, observed at :- Yes
the time of according sanction are fully incorporated
in the D.T.P. ? If so, submit the compliance report.
8. Whether correct name of work is entered at the top of :- Yes
9. Whether the standard form for Schedule-B is adopted :- Yes
10. Whether the standards words for discount or premium :- Yes
on tendered rate as I / We, am / are is mentioned at
11. Whether the amount worked out for each item is :- Yes
correctly calculated and summed up ?
12. Whether alternative items are proposed in the D.T.Ps. :- No
? If so, state the Item No. for proposed with reasons.
(4) DETAILED SPECIFICATIONS
1. Whether the detailed specification correctly reflect :- Yes
the tender items ?
2. Whether the item with specification lead and lift are :- Yes
covered in to with all lead and lifts ?
3. Whether the correct mode of payments is as :- Yes
4. Whether the correct mode of payment is as per :- Yes
5. Whether suitable use of excavated materials of :- Yes
cutting stuff is incorporated in the D.T.P. ?
6. Whether the mention, regarding the route to be :- Yes
carried out before execution is made in the D.T.P. ?
7. If so, state the Item No. with description and test to :- Yes
be carried out in brief ?
8. Whether the mention, regarding the tests to be carried :- Yes
during execution is made, state the Item No. with
description and details of test to be carried out in
9. Whether reference to P.W.D. Hand Book, I.S. :- Yes
Specification or I.R.C. Clauses are mentioned
correctly and relevantly in the respectively item ?
10. Whether average rate of Earthe work is divided and :- Not Applicable
entered in Schedule-B ? If so, give Rate Analysis.
11. Whether the specification or alternative item, if any is :- Not Applicable
12. Whether the description of each item literally and :- Yes
exactly tally with that in Schedule-B ?
1. Whether statement of Item Not put to tender is :- Yes
incorporated with details ?
2. Whether the amount of sanctioned estimate tally with :- Yes
the total amount put to tender, amount of items not
the total amount put to tender, amount of items not
put to tender ?
3. Whether Page numbering in D.T.P. is made ? :- Yes
4. Whether permission to split up to work, if any is :- Question does not arise.
sought from the competent authority ?
5. Whether the general specification and other relevant :- Yes
records are incorporated in the D.T.P. ?
6. Whether Executive Engineer has signed the D.T.P. :- Yes
and all corrections are fully attested by him ?
7. Whether the D.T.P. are submitted in well bound :- Yes
volume and in tidy fashion ?
Dy. Executive Engineer Executive Engineer
Panchayat (R & B) Sub Division, Panchayat (R & B) Division,
Name Of Work :- Construction of Various Roads Under Suvidhapath (Normal) in Petlad Taluka Dist.
Anand Pkg. No. AND/Suvidhapath/2025-26/06
Taluka :Petlad District : Anand
(To be issued by Deputy Executuve Engineer)
I have personally examined the D.T.P. & have personally
verified all the points and found to be in order. Further I have
satisfied my self with the fact that there is no ambiguity or
discrepancy in the D.T.P submitted herewith which may lead to
financial or contractual.
DRAFT TENDER PAPERS
Deputy Executive Engineer Executive Engineer
Panchayat (R & B) Sub Divison Panchayat (R & B) Division
Name Of Work :- Construction of Various Roads Under Suvidhapath (Normal) in Petlad Taluka Dist.
Anand Pkg. No. AND/Suvidhapath/2025-26/06
Taluka :Petlad District : Anand
This is to certify that the specification of items drafted properly checked with schedule-"B" by me.
Add. Assistant Engineer of the
Executive Engineer
Panchayat (R & B) Division
This to certify that the Schedule - "B' of the tender is Arithmetically cheched by me.
Tender clerk of the
Executive Engineer
Panchayat (R & B) Division
This is to Certified that the specification of the items checked by me and same are prepare and as per situation
and sanction plan estimate. This is also Certifies that the correction made in circle office copy/ Govt. copy are
attached in other copies.
Dy.Executive Engineer
Panchyat (R & B) Sub Division
I have personally examined the Draft tender papers and I have personally verified all the order above points and
found to be in order. Further I have satisfied my self with the D.T.P. Submitted her with which may lead to
financial or Constructual implications.
DRAFT TENDER PAPERS.
Dy.Executive Engineer Sr.Divisional Account Officer Executive Engineer
Panchyat (R & B) Sub Division Panchayat (R & B) Division Panchayat (R & B) Division
Petlad Anand Anand
Name Of Work :- Construction of Various Roads Under Suvidhapath (Normal) in
Petlad Taluka Dist. Anand Pkg. No. AND/Suvidhapath/2025-26/06
Taluka :Petlad District : Anand
STATEMENT SHOWING THE DIFFERENCE BETWEEN DTP & ESTIMATE AMOUNT
AMOUNT PUT TO TENDER
1 T.S. Estimate Amount : Rs. :
2 D. T. P. Amount : Rs. :
3 Difference : Rs. :
AMOUNT NOT PUT TO TENDER
ITEM CREATING DIFFERENCE
1 Difference due 1 % Q.C. Charges : Rs. :
2 Difference due 1 % Contigency
Charges : Rs. :
3 Road Safety Audit Rs. :
4 Add 18% GST Rs. :
5 Credit For Dismentalling & Rs. : - Deduct
6 Difference due to round figure in estimate : Rs. :
& Arithmatic Calculation Mistake
7 Difference due to Av. Rate in DTP : Rs. :
8 Total Difference : Rs. :
Deputy Executive Engineer Executive Engineer
Panchayat (R & B) Sub Division Panchayat (R&B) Division
Name Of Work :- Construction of Various Roads Under Suvidhapath (Normal) in Petlad Taluka
Dist. Anand Pkg. No. AND/Suvidhapath/2025-26/06
Taluka :Petlad District : Anand
STATEMENT SHOWING CEMENT CONSUMPTION
Sr cement to be
It No Item Unit Total Qty cement
No use in kg per
required in Kg.
1 5 Supplying and fixing reinforced concrete heavy dutynon-pressure Rmt 75.00 1.02
pipes with collars for culverts includingsetting and joining the
pipes in C.M. 1:2 watering andlaying (To level of slops of I.S.
/ 1971 Class NP4 offollowing internal diameter. (i) 300 mm dia.
2 7 Dry Lean Cement Concrete Sub- base:- Construction of dry lean Cum 550.00 150.00
cement concrete Sub- base over a prepared sub-grade with coarse
and fine aggregate conforming to IS: 383, the size of coarse
aggregate not exceeding 25 mm, aggregate cement ratio not to
exceed 15:1, aggregate gradation after blending to be as per table
600-1, optimum moisture content to be determined during trial
length construction, concrete strength not to be less than 10 Mpa at
7 days, mixed in a batching plant, transported to site, laid with a
conventional method, compacting with 8-10 tonnes vibratory roller,
finishing and curing etc. complete.
3 8 Cement Concrete Pavement:- Construction of un reinforced, Cum 1386.00 400.00
dowel jointed, plain cement concrete pavement over a prepared sub
base with concrete grade M300, coarse and fine aggregate
conforming to IS 383, maximum size of coarse aggregate not
exceeding 25 mm, mixed in a batching and mixing plant as per
approved mix design, transported to site, laid with a fixed form or
slip form paver, spread, compacted and finished in a continuous
operation including provision of contraction, expansion,
construction and longitudinal joints, joint filler, separation
membrane, sealant primer, joint sealant, debonding strip, dowel
bar, tie rod, admixtures as approved, curing compound, finishing to
lines and grades as per drawing
4 9 Providing & fixing logo board of Suvidhapath as per standard No. 3.00 35.24
design of National Rural Road Development Agency diamond size
600 x 600 mm , 1.50mm thick plate & board size 900 x 250mm
1.50mm thick M.S. plate and 2.40 meter deep length single angle
75 x 75 x 6 mm size incl. fitting & painting lettering with luminous Total Kg.
Deputy Executive Engineer Executive Engineer
Panchayat (R & B) Sub Division Panchayat (R&B) Division
Name Of Work :- Construction of Various Roads Under Suvidhapath
(Normal) in Petlad Taluka Dist. Anand Pkg. No.
AND/Suvidhapath/2025-26/06
DETAILS OF COST of Cement, Steel & Asphalt
Item Name of Material Qty Unit Rate Amount of
1 Cement OPC 53 Grade 637.08 MT 5234.00
Deputy Executive Engineer Executive Engineer
Panchayat (R & B) Sub Division Panchayat (R&B) Division
Name Of Work :- Construction of Various Roads Under Suvidhapath (Normal) in Petlad Taluka
Dist. Anand Pkg. No. AND/Suvidhapath/2025-26/06
STATEMENT SHOWING THE PRICE ADJUSTMENT
Sr. Cost for Percentage of
Details of Component Tender Cost
No. Component Component
[F] Plant and Machinery Spares, Pp = 2120111.84 x 100 / 15469393.20 = 13.71 %
Dy.Executive Engineer Sr.Divisional Account Officer Executive Engineer
Panchyat (R & B) Sub Division Panchayat (R & B) Division Panchayat (R & B) Division
Petlad Anand Anand
Name Of Work :- Construction of Various Roads Under Suvidhapath (Normal) in Petlad Taluka Dist. Anand Pkg. No. AND/Suvidhapath/2025-26/06
Component of Work for Price Variation
Estimated Cement Component Steel Component Asphalt Component Other Material Labour Component Plant and Machinary POL
Qty. Item of Work / BOQ Unit Consp. Amount Consp. Amount Consp. Amount
Rate Consp. 5.234 Consp. 59420 Consp. 40532 % Amount % Amount % Amount % Amount
Earthwork for embankment including breaking clods,
1 4024 dressing with all lead and lift (including watering and 180.88 Cum 727861.12 0 0 0 0 30 218358.34 55 400323.62 15
consolidation) (C) From Borrowarea within all lead
Box cutting the road surface to proper slope and
camber for making a base for road work including
removing the excavated stuff and depositing on the
road side slope as directed upto all lead.
Providing laying and spreading mix material gradation
equivalent to GSB grade II ,MCBT Metal 20-40 mm
with Fine aggregate material in required proportion so
3 1154 as to have, mixing in place with rotavator and grading 1747.6763 Cum 2016818.5 0 0 0 60 1210091.1 20 403363.7 13 262186.41 7
with mortar grader at OMC and compacted with
vibratory roller 80 to 100 KN static weight to achieve
desired density etc. complete
Conveyance of excavated earth/ unuseable material
available from box cutting/ scarifying the existing road
4 901 surface etc. up to 1.0 km. lead including loading, 258.56 Cum 232962.56 0 0 0 0 30 69888.77 55 128129.41 15
unloading and spreading the material on road side as
and where directed.
Supplying and fixing reinforced concrete heavy
dutynon-pressure pipes with collars for culverts
includingsetting and joining the pipes in C.M. 1:2
watering andlaying (To level of slops of I.S. 458 /
Class NP4 offollowing internal diameter. (i) 300 mm
Providing and fixing pre-cast Rubber Dye / steel Dye
inter locking concrete block 60mm thick with grade of
concrete M300 pnumatic compressed / vibrated
mechanically and as per approved design Confirming
to IS 15658 : 2006 including 35 mm Sand layer for
levelling and filling the joint with sand in proper line
and level as per guidlines of IRC : SP 63-2018 etc.
Dry Lean Cement Concrete Sub- base:- Construction
of dry lean cement concrete Sub- base over a
prepared sub-grade with coarse and fine aggregate
conforming to IS: 383, the size of coarse aggregate
not exceeding 25 mm, aggregate cement ratio not to
exceed 15:1, aggregate gradation after blending to be
as per table 600-1, optimum moisture content to be
determined during trial length construction, concrete
strength not to be less than 10 Mpa at 7 days, mixed
in a batching plant, transported to site, laid with a
conventional method, compacting with 8-10 tonnes
vibratory roller, finishing and curing etc. complete.
Estimated Cement Component Steel Component Asphalt Component Other Material Labour Component Plant and Machinary POL
Qty. Item of Work / BOQ Unit Consp. Amount Consp. Amount Consp. Amount
Rate Consp. 5.234 Consp. 59420 Consp. 40532 % Amount % Amount % Amount % Amount
Cement Concrete Pavement:- Construction of
un reinforced, dowel jointed, plain cement concrete
pavement over a prepared sub base with concrete
grade M300, coarse and fine aggregate conforming to
IS 383, maximum size of coarse aggregate not
exceeding 25 mm, mixed in a batching and mixing
plant as per approved mix design, transported to site,
compacted and finished in a continuous operation
including provision of contraction, expansion,
construction and longitudinal joints, joint filler,
separation membrane, sealant primer, joint sealant,
debonding strip, dowel bar, tie rod, admixtures as
approved, curing compound, finishing to lines and
grades as per drawing
Providing & fixing logo board of Suvidhapath as per
standard design of National Rural Road Development
Agency diamond size 600 x 600 mm , 1.50mm thick
plate & board size 900 x 250mm , 1.50mm thick M.S.
plate and 2.40 meter deep length single angle 75 x
x 6 mm size incl. fitting & painting lettering with
luminous colour as per drawing including fixing in C.C.
1:3:6 etc. complete.
Percentage Component… 15469393.2 21.56 0 0 36.26 22.19 13.71
Deputy Executive Engineer Sr.Divisional Account Officer Executive Engineer
Panchayat (R&B) Sub Division Panchayat (R & B) Division Panchayat (R&B) Division
Petlad Anand Anand
Name Of Work :- Construction of Various Roads Under Suvidhapath (Normal) in Petlad Taluka
Dist. Anand Pkg. No. AND/Suvidhapath/2025-26/06
Sr No. Clause no Page
1 Principle Approval Date and - - :-
Amount (Attach letter)
2 Administrative Approval Date and - - :- APC/2024/Jo.No./14/D.1
Amount (Attach letter ) Dtd. 05/03/2026 Sr No. 6,7 & 8 for
Rs. 187.00 lacs Under Suvidhapath
3 Technical Approval Date and - - :-
Amount (Attach letter)
Construction of CC Pavement on Sihol Aradi Porada Road (VR) Km. Ts. For Rs 9233910 By E.E.Panchyat
0/000 to 0/630 Ta.:-Petlad Dist.:- Anand ,Panchayat (R&B) Division, Anand, as
per Item No 309 Pg No 42 in March
Construction of CC Pavement on Bhavanipura Vatav Road (VRNP) Km. Ts. For Rs 4664340 By E.E.Panchyat
0/000 to 0/320 Ta.:- Petlad Dist.:- Anand ,Panchayat (R&B) Division, Anand, as
per Item No 311 Pg No 42 in March
Construction of CC Pavement on Manej Manpura Road (VR) Km. 0/000 Ts. For Rs 4666190 By E.E.Panchyat
to 0/310 Ta.:-Petlad Dist.:- Anand ,Panchayat (R&B) Division, Anand, as
per Item No 310 Pg No 42 in March
5 DTP amount IFB 4 :-
6 Tender Fee Rs. - - :- 3600.00 Rs
(As per GR- PRCH-102000-IB-
Above 10.0 Cr.- Rs 18000)
7 Earnest Money Deposit (Bid IFB 4 :-
Security-1% of DTP amount) Rs. point 6
8 Time Limit (Months) Section 3 41 :- 9 (Nine) Months (Including
cl. 17 Monsoon Period)
9 Annual Financial Turnover Section 1 cl. 9 :-
Amount Rs. 4.5.3(a)
10 Defect Liability Period (In Section 3 46 :-
Months & includes no. of cl. 33.1 ( C ) 36 Months (including 3 monsoons)
11 Free Maintenance Guarantee Section 3 46 :-
Period (for Road & Bridge cl. 33.2 (b)
12 Registration/Category - - :- “B” class with Special Cat.-III for
required Road and above
13 Site Possession Date Section 3 42 :- 1st day of Work order#
14 Period between Program Section 3 44 :- 30 days
Update (Days) cl.
15 Amount to be withheld for late Section 3 44 :- 1.00 Lakh
submission of Program cl.
16 Milestone: - Section 3 53 :- % of work Days
(A) Milestone 1 - - :- 25% 68 Days
(B) Milestone 2 - - :- 50% 135 Days
(C) Milestone 3 - - :- 75% 203 Days
(D) Milestone 4 - - :- 100% 270 Days
#In case of LA/FRA is in progress give likely date.
17 Price Adjustment Components Section 4 66 :- % Input
cl. 24 index/price*
(A) Labour, PL Section 4 66 :- PL= 22.19 Lo=
(B) Cement, PC Section 4 66 :- PC= 21.56 Co=
(C) Steel, PS Section 4 67 :- PS= 0.00 So=
(D) Bitumen, Pb Section 4 67 :- Pb= 0.00 Bo=
(E) POL, Pf Section 4 68 :- Pf= 6.30 Fo=
(F) Plant and Machinery Spares Pp Section 4 68 :- Pp= 13.71 Po=
(G) Other Materials, Pm Section 4 69 :- Pm= 36.26 Mo=
18 Amount to be withheld Section 3 56 :- 2.00 Lakh
for failing to supply “as cl.
built” drawings
19 Percentage Rate Contract Section 7 78 :-
*Input index/price for each component on 28 days preceding the date of opening of technical bid shall be
This is to certify that the contract document prepared for the work
Construction of Various Roads Under Suvidhapath (Normal) in Petlad Taluka Dist.
Anand Pkg. No. AND/Suvidhapath/2025-26/06
is based on the Standard Bidding Document Procurement of Civil Works published
by R&B department letter No. RBD/0346/10/2023 dated 12/10/2023.
No further modification and alteration in this standard format has been made by this office.
Deputy Executive Engineer Executive Engineer
Panchayat (R & B) Sub Division Panchayat (R&B) Division
Superintending Engineer
Panchayat (R&B) Circle
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.SBD_Suvidhapath_Petlad_Pkg_06.pdf
02. Sch B_Suvidhapath_Petlad_Pkg_06.pdf
03 Specifications_Suvidhapath_Petlad_Pkg_06.pdf
Drawing.pdf
GRs - SBD with Index - Part 1.pdf
GRs - SBD with Index - Part 2.pdf
RMC GR.pdf
Suvidha Path Guideline (1).pdf
Suvidhapath 3A.pdf
Sch B.pdf
Download all tender documents and submit your bid