| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹76.0 LAccepted-AOC | ₹76.0 L | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹77.5 L+₹1.5 L (2.01%)Rejected-Finance | ₹77.5 L+₹1.5 L (2.01%) | L2 | Rejected-Finance L2 bidder |
| Sl No | Description | Qty | Unit | Muhammed Ali L2 | E.K.Abdulsalam L1 |
|---|---|---|---|---|---|
| 1.00Ground Development Works - Construction of Mud Football Court | |||||
| 1.01 | 2.6.1Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 424 | cum | 262.78 ₹1,11,418.72 | 257.63 ₹1,09,235.12 Lowest |
| 1.02 | OD194979/2025-2026 Sieving excavated Earth through sieve of I.S. designation 4.75 mm and collecting good quality earth for measurement including stacking | 275.04 | cum | 197.55 ₹54,334.15 | 193.68 ₹53,269.75 Lowest |
| 1.03 | OD405857/2025-2026"Filling with available excavated earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering and rolling every 3rd and top most layer with power roller of minimum 8 tonnes, for all leads including all lifts involved, all cost of materials, labour charges, hire charges for machineries, conveyance, etc.complete as per the direction of Engineer-in-charge. (Based on DSR item no.50.2.26.1 and 2.2.1) | 149 | cum | 40.47 ₹6,030.03 | 39.68 ₹5,912.32 Lowest |
| 1.04 | OD246690/2025-2026"Supplying and stacking sieved sand at site for measurement including cost of sand, carriage upto 5 k.m. lead,all labour charges for stacking,loading and unloading etc complete (Based on CPWD 30.2.2 & 30.2.4.3). | 68.76 | cum | 3,082.57 ₹2,11,957.51 | 3,022.13 ₹2,07,801.66 Lowest |
| 1.05 | OD246691/2025-2026"Mixing Departmentally supplied sieved red earth and sieved sand in the required proportion specified or directed by the officer - in- charge including all cost of labour charges, hire charges of machinaries, etc. complete.(Based on CPWD 30.2.9) | 343.8 | cum | 55.19 ₹18,974.32 | 54.11 ₹18,603.02 Lowest |
| 1.06 | OD246692/2025-2026"Spreading of mixed Departmentally supplied sieved red earth and sieved sand in the required thickness as per direction of officer - in- charge including all cost of labour charges, hire charges of machineries etc. complete.(Based on CPWD 30.2.8) | 343.8 | cum | 79.15 ₹27,211.77 | 77.6 ₹26,678.88 Lowest |
| 1.07 | OD246700/2025-2026"Consolidation of subgrade with power road roller of 8 to 12 tonne capacity with road roller including making good the undulations etc.including all cost of labour charges, hire charges ,fuel,oil etc. complete.(Based on CPWD 16.1) | 1,719 | sqm | 3.61 ₹6,205.59 | 3.54 ₹6,085.26 Lowest |
| 1.08 | OD194982/2025-2026"Supply and Installation of Fixed type 7's Football Goal Post (3.65m x 1.80m x 1.20m) made of pipe 10cm dia G.I. pipe with nylon net as per the direction of Engineer in Charge including all cost of materilas, labour charges, conveyance, etc. complete. | 1 | pair | 25,500 ₹25,500 | 25,000 ₹25,000 Lowest |
| 2.00RR Step Gallery | |||||
Tender Value
₹76.1 L
EMD Value
₹50,000
Closing Date
4 Apr 2026, 3:00 pmClosed
The Chief Engineer, Sports Kerala Foundation
Jimmy George Indoor Stadium, Vellayambalam, Thiruvananthapuram
Ground Development Works - Construction of Mud Football Court, RR Step Gallery, Fencing (7.5m height), RCC Drain, Electric pole foundation, Inauguration stone, Name Board and Flood lighting works for the Mud football court.
2026_SKF_847627_2
585/SKF/CE/2025-26
Open Tender
Civil Works - Others
Item Rate
180 days
Palakkad
Please refer tender document
7 documents required · 7 mandatory
₹2,950
₹50,000
20 Jul 2026
24 Mar 2026
6 Apr 2026
24 Mar 2026
4 Apr 2026
24 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Ground Development Works - Construction of Mud Football Court | |||||
| 1.01 | 2.6.1Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - |
| 1.02 | OD194979/2025-2026 Sieving excavated Earth through sieve of I.S. designation 4.75 mm and collecting good quality earth for measurement including stacking | - | cum | - | - |
| 1.03 | OD405857/2025-2026"Filling with available excavated earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering and rolling every 3rd and top most layer with power roller of minimum 8 tonnes, for all leads including all lifts involved, all cost of materials, labour charges, hire charges for machineries, conveyance, etc.complete as per the direction of Engineer-in-charge. (Based on DSR item no.50.2.26.1 and 2.2.1) | - | cum | - | - |
| 1.04 | OD246690/2025-2026"Supplying and stacking sieved sand at site for measurement including cost of sand, carriage upto 5 k.m. lead,all labour charges for stacking,loading and unloading etc complete (Based on CPWD 30.2.2 & 30.2.4.3). | - | cum | - | - |
| 1.05 | OD246691/2025-2026"Mixing Departmentally supplied sieved red earth and sieved sand in the required proportion specified or directed by the officer - in- charge including all cost of labour charges, hire charges of machinaries, etc. complete.(Based on CPWD 30.2.9) | - | cum | - | - |
| 1.06 | OD246692/2025-2026"Spreading of mixed Departmentally supplied sieved red earth and sieved sand in the required thickness as per direction of officer - in- charge including all cost of labour charges, hire charges of machineries etc. complete.(Based on CPWD 30.2.8) | - | cum | - | - |
| 1.07 | OD246700/2025-2026"Consolidation of subgrade with power road roller of 8 to 12 tonne capacity with road roller including making good the undulations etc.including all cost of labour charges, hire charges ,fuel,oil etc. complete.(Based on CPWD 16.1) | - | sqm | - | - |
| 1.08 | OD194982/2025-2026"Supply and Installation of Fixed type 7's Football Goal Post (3.65m x 1.80m x 1.20m) made of pipe 10cm dia G.I. pipe with nylon net as per the direction of Engineer in Charge including all cost of materilas, labour charges, conveyance, etc. complete. | - | pair | - | - |
| 2RR Step Gallery | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1433280.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
DWG.pdf
Other Document • 0.70 MB
Tenderdoc.pdf
Tender Documents • 1.37 MB
BOQ_1433280.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .