| 1 | L-1₹3.3 LAccepted-AOC ATAL CHOWK CHANWARIDAND MANENDRAGARH KOREA CHHATTISGARH | KOREA | CHHATTISGARH | 497442 | ₹3.3 L Quoted ₹2.8 L | L-1 | Accepted-AOC Accepted as being L-1 bidder and acceptable rate |
| 2 | L-2₹4.4 LRejected-Finance WARD NO 11 NEAR CENTRAL SCHOOL MOUHARPARA MANENDRAGARH DIST MCB C G 497442 | MANENDRAGARH | MCB | C G | 497442 | ₹4.4 L | L-2 | Rejected-Finance L-1 Bidder Accepted |
| Sl No | Description | Qty | Unit | S.S. ELECTRICAL L1 | GURU ENTEREPRISES L2 |
|---|---|---|---|---|---|
| 1.00Repairing and rewinding of 02 nos different capacity (250KVA & 200KVA) transformers of West JKD | |||||
| 1.01 | Rewinding & partial repairing 01 No. 250KVA/3.3KV/440V Transformer W/s No. 24-25/25 including :
99.96% Electrolytic copper conductor TPC for replacement of old & damaged Primary winding 44 Kg only one limb, Re insulation & Recoiling of damaged secondary winding- 29.33Kg one limb only, Insulation material per coil formation H.T.& L.T. coil, Glass fiber sheet, glass tape, Less scrape materials-44Kg (NOT TO BE RETURNED), including labour charge ( Skilled 04 mandays&semi skilled 04 mandays). Profit & overheads including fitting testing at our site (10%) painting double coat. | 1 | Nos | 30,085 ₹30,085 | 50,000 ₹50,000 |
| 1.02 | Rewinding & repairing 01 No 200KVA/33KV/ 440V Transformer W/s No 24-25/24 including:
99.96% Electrolytic copper conductor TPC for replacement of old & damaged Primary winding 117Kg, Re insulation& Recoiling of damaged secondary winding- 78Kg, insulation materials per coil formation H.T & LT. coil, Glass fiber sheet, glass tape, Less scrape materials-117Kg(NOT TO BE RETURNED), including labour charge(Skilled 06 mandays&semi skilled 06mandays), Profit & overheads including fitting testing at our site (10%) Painting diuble coat, replacement of Corksheet of Top cover 02 nos. | 1 | Nos | 1,15,000 ₹1.1 L | 1,78,000 ₹1.8 L |
| 2.00Repairing and rewinding of 02 nos different capacity (630KVA & 100KVA) transformers of Rajnagar RO | |||||
| 2.01 | Rewinding & repairing 01 No 630KVA/3.3KV/ 440V Transformer W/s No 24-25/19 including:
99.96% Electrolytic copper conductor TPC for replacement of old & damaged Primary winding 206Kg, Re insulation& Recoiling of damaged secondary winding- 137.33Kg, insulation materials per coil formation H.T & LT. coil, Glass fiber sheet, glass tape, Less scrape materials-206Kg (NOT TO BE RETURNED), including labour charge(Skilled 12 mandays&semi skilled 12mandays), Profit & overheads including fitting testing at our site (10%) Painting of transformer profit and overheads including fitting testing at our site (10%) | 1 | Nos | 94,122 ₹94,122 | 1,47,000 ₹1.5 L |
| 2.02 | Rewinding & repairing 01 No 100KVA/33KV/ 440V Transformer W/s No 24-25/20 including:
99.96% Electrolytic copper conductor TPC for replacement of old & damaged Primary winding 66Kg, Re insulation& Recoiling of damaged secondary winding- 44Kg, insulation materials per coil formation H.T & LT. coil, Glass fiber sheet, glass tape, Less scrape materials-36Kg(NOT TO BE RETURNED), including labour charge(Skilled 04 mandays&semi skilled 04 mandays), Profit & overheads including fitting testing at our site (10%) | 1 | Nos | 40,740 ₹40,740 | 63,000 ₹63,000 |
| 3.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - |
Updated dates
Tender Value
₹5.7 L
EMD Value
₹7,200
Closing Date
19 Jan 2026, 5:00 pmClosed
STAFF OFFICER ENM SECL HSD AREA
Office of the Area General Manager, Hasdeo Area PO South Jhagrakhand Colliery, Dist MCB(CG), PIN 497448
Repairing and rewinding of 02 nos different capacity 250/ 200KVA transformers of West JKD and 02 nos different capacity 630/ 100KVA transformers of Rajnagar RO Hasdeo Area
2026_SECL_350452_1
AGM/HSD/SO(EnM)/E-Tender/63, dt.05.01.2026
Open Tender
Electrical and Maintenance Works
30 days
Hasdeo Area
Please refer Tender documents.
5 documents required · 5 mandatory
₹7,200
26 Feb 2026
5 Jan 2026
20 Jan 2026
5 Jan 2026
19 Jan 2026
5 Jan 2026
5 Jan 2026 - 12 Jan 2026
Repairing and rewinding of 02 nos different capacity (250KVA & 200KVA) transformers of West JKD
Rewinding & partial repairing 01 No. 250KVA/3.3KV/440V Transformer W/s No. 24-25/25 including : 99.96% Electrolytic copper conductor TPC for replacement of old & damaged Primary winding 44 Kg only one limb, Re insulation & Recoiling of damaged secondary winding- 29.33Kg one limb only, Insulation material per coil formation H.T.& L.T. coil, Glass fiber sheet, glass tape, Less scrape materials-44Kg (NOT TO BE RETURNED), including labour charge ( Skilled 04 mandays&semi skilled 04 mandays). Profit & overheads including fitting testing at our site (10%) painting double coat.
Rewinding & repairing 01 No 200KVA/33KV/ 440V Transformer W/s No 24-25/24 including: 99.96% Electrolytic copper conductor TPC for replacement of old & damaged Primary winding 117Kg, Re insulation& Recoiling of damaged secondary winding- 78Kg, insulation materials per coil formation H.T & LT. coil, Glass fiber sheet, glass tape, Less scrape materials-117Kg(NOT TO BE RETURNED), including labour charge(Skilled 06 mandays&semi skilled 06mandays), Profit & overheads including fitting testing at our site (10%) Painting diuble coat, replacement of Corksheet of Top cover 02 nos.
Repairing and rewinding of 02 nos different capacity (630KVA & 100KVA) transformers of Rajnagar RO
Rewinding & repairing 01 No 630KVA/3.3KV/ 440V Transformer W/s No 24-25/19 including: 99.96% Electrolytic copper conductor TPC for replacement of old & damaged Primary winding 206Kg, Re insulation& Recoiling of damaged secondary winding- 137.33Kg, insulation materials per coil formation H.T & LT. coil, Glass fiber sheet, glass tape, Less scrape materials-206Kg (NOT TO BE RETURNED), including labour charge(Skilled 12 mandays&semi skilled 12mandays), Profit & overheads including fitting testing at our site (10%) Painting of transformer profit and overheads including fitting testing at our site (10%)
Rewinding & repairing 01 No 100KVA/33KV/ 440V Transformer W/s No 24-25/20 including: 99.96% Electrolytic copper conductor TPC for replacement of old & damaged Primary winding 66Kg, Re insulation& Recoiling of damaged secondary winding- 44Kg, insulation materials per coil formation H.T & LT. coil, Glass fiber sheet, glass tape, Less scrape materials-36Kg(NOT TO BE RETURNED), including labour charge(Skilled 04 mandays&semi skilled 04 mandays), Profit & overheads including fitting testing at our site (10%)
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.12 MB
Tendernotice_2.pdf
PDF • 2.08 MB
BOQ_363235.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid