| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 LAccepted-AOC | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | K S SREENIVASAN L1 |
|---|---|---|---|---|
| 1.00App A Box Culvert | ||||
| 1.00 | 2.4.10.A:Removing all type of Hume Pipes and Stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works - Up to 600 mm dia. | 6 | metre | 545.93 ₹3,275.58 Lowest |
| 1.00 | OD53939/2024-2025:RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work etc. complete. | 7.6 | metre | 904.17 ₹6,871.69 Lowest |
| 1.00 | OD53954/2024-2025:Pumping and bailing out of water and removing slush etc. by using pump set including cost of labour, fuel charges, hire charges of pump set etc. complete as per the direction of Engineer-in-Charge | 77 | hour | 326.14 ₹25,112.78 Lowest |
| 1.00 | 3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m) | 70.11 | cum | 62.98 ₹4,415.84 Lowest |
| 1.00 | 15.9:Construction of dry rubble flooring at cross drainage works for relatively less important works. | 8.57 | cum | 4,867.07 ₹41,735.13 Lowest |
| 1.01 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 4.21 | cum | 7,096.29 ₹29,910.86 Lowest |
| 1.01 | 12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer | 22.55 | cum | 8,902.08 ₹2,00,697.39 Lowest |
| 1.01 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications | 2.25 | MT | 96,992.29 ₹2,18,717.61 Lowest |
| 1.01 | 4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 0.54 | cum | 3,565.51 ₹1,925.38 Lowest |
Tender Value
₹5.0 L
EMD Value
₹12,498
Closing Date
4 Aug 2025, 2:00 pmClosed
Assistant Executive Engineer PWD Roads sud divisi
Office of the Assistant Executive Engineer PWD Roads sud division North Paravur.
This work is proposed to reconstruct the existing pipe culvert into concrete culvert Items included in the estimate are removing the existing hume pipe DR flooring PCC in 1 3 6 RCC M20 for culvert structure and wing walls HYSD steel reinforcements
2025_PWD_762598_6
PWD/RB/TR/9795/2024_5_1_1/1
Open Tender
Civil Works - Roads
Item Rate
Njarakkal
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,105
₹12,498
Yes
4 Nov 2025
21 Jul 2025
6 Aug 2025
21 Jul 2025
4 Aug 2025
21 Jul 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .