Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance MADHAVI NAGAR GADAI PURA A B ROAD GWALIOR DIST GWALIOR M P | GWALIOR | MADHYA PRADESH | 474001 | Admitted-Finance |
| 3 | Admitted-Finance GUDLIXA | Admitted-Finance |
| 4 | Admitted-Finance JAIPUR | JAIPUR | RAJASTHAN | 302001 | Admitted-Finance |
| 5 | Rejected-Technical | Rejected-Technical ALL DOCUMENT NOT COMPLETED |
Tender Value
₹21.0 L
EMD Value
₹41,969
Closing Date
30 Oct 2023, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Archaeologist
Superintending Archaeologist, Archaeological Survey of India, Jaipur Circle, 70/133-140, Patel Marg, Mansarovar, Jaipur-302020
Restoration AND Conservation at Dara Mahal complex (Phase.IV) at Dara Distt. Kota (Complete work)
2023_ASI_775879_1
3/109/JPR/2023-24-W
Open Tender
Civil Works
Works
120 days
Dara Mahal complex (Phase.IV) at Dara Distt. Kota
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹41,969
Yes
28 Nov 2023
11 Oct 2023
31 Oct 2023
11 Oct 2023
30 Oct 2023
11 Oct 2023
11 Oct 2023 - 30 Oct 2023
Amount
Description of items and specification of work to be excuted.
Removal Taking out the dead weathered/cracked/damaged plaster of thickness 25- 30mm average of wall very carefully & disposal of the unserviceable material with lead upto 100 mts & lift upto 3-5mts etc complete.
Taking out/removal of the dead/sunken/pulverized lime concrete very carefully in flooring area very carefully to avoid any damage of structure & disposal of unserviceable material by manually in head load with lead approx. 200mtr etc complete.
Providing and laying 1:2 lime concrete with 50% composite mortar 1:1:1 lime mortar (1lime:1surkhi:1coarse sand) and 20mm down gauge stone/brick aggregate with binding solution of belgiri, gud, methi, jute & adhesive material beating with bamboo stick first & then with thaphi till the surface is harden to maintain the proper slope & top surface finishing etc complete in all respect.
Taking out, Lowering down and replacing the old broken/cracked/missing chajja stones by providing & fixing 50mm thick average thickness (Local quarry/Bijolia stone) including making the grooves & joints and interlocking with S.S. Rod (Nails) and anchoring pin with lime mortar as per the original etc complete.
Plastering the walls in 30mm avg. thick lime surkhi plaster (1 lime :1 surkhi : 1 coarse sand) as per old traditional practice in three coat of base course and subsequent course and low temping beating till the shrinkage cracks disappear then the work is done as per the required work of restoration with lead approx 100 mtr etc complete.
Making Designer Plaster in 30mm avg. thick lime surkhi plaster (1lime : 1surkhi : 1c.sand) as per old traditional practice (both in 3 coat of base course and subsequent course and low temping beating out the shrinkage cracks and making them disappear, then the work is done as per the restoration nature requirement with lead 100mtr etc complete.
Providing and laying APP (Atactic Polypropylene Polymer) modified prefabricated five layer, 3 mm thick water proofing membrane, black finished reinforced with glass fiber matt consisting of a coat of bitumen primer for bitumen membrane @ 0.40 liter/sqm by the same membrane manufactured of density at 25°C, 0.87 - 0.89 kg/liter and viscosity 70 - 160 cps. Over the primer coat the layer of membrane shall be laid using butane torch and sealing all joints etc., and preparing the surface complete. The vital physical and chemical parameters of the membrane shall be as under: Joint strength in longitudinal and transverse direction at 23°C as 350/300 N/5 cm. Tear strength in longitudinal and transverse direction as 60/80N. Softening point of membrane not less than 150°C. Cold flexibility shall be upto -2°C when tested in accordance with ASTM, D - 5147. The laying of membrane shall be got done through the authorized applicator of the manufacturer of membrane 3mm thick.
Providing & Fixing the I-Section Beam (ISWB) 250x200 size for support including making of hole & bed for supporting the cracked slab of Roof with packing material etc complete in all respect.
Providing & fixing the M.S. Gate of angle iron frame 40x40x5mm & 35x35x5mm for shutter with 12mm square bars 10cm c/c distance including fixing the expanded metal jalli with (30x3)mm iron flat to cover the jali with locking arrangement & painting two or more coat with synthetic enamel paint of approved shade over the red oxide primer & including transportation charge with loading/unloading etc complete.
Providing & fixing the M.S. Window of angle iron frame 40x40x5mm & 35x35x5mm for shutter with 12mm square bars 10cm c/c distance including fixing the G.I. sheet 18 Guage with (30x3)mm iron flat to cover the G.I. sheet with locking arrangement & painting two or more coat with synthetic enamel paint of approved shade over the red oxide primer & including transportation charge with loading/unloading etc complete.
Providing and laying 50 mm thick avg Bansi Pahadpur flag stone matching to original over 20mm thick base Lime cement mortar 1:1:1 (1 lime : 1 coarse sand : 1coarse surkhi) adhesive material including cutting, chiseling molding and fixing with 90% new stone etc complete. (Note-The sample of flag stone will be approved by circle office before execution of the work)
Recess Pointing the old structures & new wall in lime surkhi mortar 1:1:1 (1 Lime: 1 C. Sand: 1 B. Surkhi) mixed with adhesive material matching with the original structures including washing & racking out the joints etc complete.
Erection and dismantling scaffolding with wooden ballies and bamboo challies for execution of work including carrying the scaffolding material to working site etc complete.
Disposal of unwanted waste material / malba received from the site during the work after stacking and measuring by mechanical transportation upto lead of 7 to 8 km from site area for site clearance and good appearance. (Note - It is for estimate purpose only actual qty. will be measured and recorded during execution of the work)
PAWAN ENTERPRISES
INDRAJ MEENA CONTRACTOR
PRAVEEN AND COMPANY
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .