Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAccepted-AOC WARD NO 4 NETA NAGAR SULTANPUR PATTI TEHSIL BAZPUR U S NAGAR RAMNAGAR | UDAM SINGH NAGAR | UTTARAKHAND | 244712 | ₹3.7 L | L1 | Accepted-AOC First Lowest Bid Rs. 373000.00 |
| 2 | L2₹3.8 LRejected-Finance AZAD NAGAR HALDWANI NAINITAL | HALDWANI | NAINITAL | UTTARAKHAND | ₹3.8 L | L2 | Rejected-Finance Due to Highest Bid Rank |
| 3 | L3₹3.9 LRejected-Finance NARAIN NAGAR OPPOSITE DEGREE COLLEGE BAJPUR ROAD KASHIPUR DISTT UDHAM SINGH NAGAR UTTARAKHAND | ₹3.9 L | L3 | Rejected-Finance Due to Highest Bid Rank |
| Sl No | Description | Qty | Unit | Gani Engineering and construction company L1 | T A CONSTRIUTION L3 | ROYAL ENTERPRISES L2 |
|---|---|---|---|---|---|---|
| 1.00A- Supply of Non- centralized Items | ||||||
| 1.01 | M.S. Holding Clamps | 6 | Nos | 265 ₹1,590 | 300 ₹1,800 | 300 ₹1,800 |
| 1.02 | X Arm Clamp For Pcc Pole With N/B | 4 | Nos | 260 ₹1,040 | 280 ₹1,120 | 280 ₹1,120 |
| 1.03 | Stay Clamp With N&B Pcc Pole 8.5mtr | 4 | Nos | 231.25 ₹925 | 260 ₹1,040 | 240 ₹960 |
| 1.04 | Earth Wire Clamp For Pcc Pole With N/B | 3 | Nos | 260 ₹780 | 275 ₹825 | 260 ₹780 |
| 1.05 | MS Clamp With N&B For Distribution Box | 12 | Nos | 259 ₹3,108 | 260 ₹3,120 | 260 ₹3,120 |
| 1.06 | Stay Insulator 75x90 mm | 4 | Nos | 50 ₹200 | 65 ₹260 | 60 ₹240 |
| 1.07 | LT Distribution Box | 6 | Nos | 3,302.54 ₹19,815.24 | 3,302.54 ₹19,815.24 | 3,302.54 ₹19,815.24 |
| 1.08 | Cable AL 4x25 Sq. mm PVC | 18 | M | 97.5 ₹1,755 | 100 ₹1,800 | 100 ₹1,800 |
| 1.09 | LT ACB Out Door 400A | 1 | Nos | 1,35,000 ₹1.4 L | 1,35,000 ₹1.4 L | 1,35,000 ₹1.4 L |
Tender Value
Refer Docs
EMD Value
₹15,000
Closing Date
15 Dec 2025, 12:00 pmClosed
Executive Engineer
Office of the EE EDD Jaspur
Increasing the capicity of the T/F from 100 KVA to 250 KVA in Village Kunda of Kunda Feeder, 33/11 KV S/S Garhinegi, under EDSD (Second), Jaspur.
2025_UPCL9_89426_1
Tender No 13/EDD(J)/2025-26
Open Tender
Electrical Works
45 days
EDD Jaspur
Please refer Tender documents.
3 documents required · 3 mandatory
₹295
EE EDD Jaspur
₹15,000
7 Apr 2026
3 Dec 2025
16 Dec 2025
3 Dec 2025
15 Dec 2025
3 Dec 2025
A- Supply of Non- centralized Items
M.S. Holding Clamps
X Arm Clamp For Pcc Pole With N/B
Stay Clamp With N&B Pcc Pole 8.5mtr
Earth Wire Clamp For Pcc Pole With N/B
MS Clamp With N&B For Distribution Box
Stay Insulator 75x90 mm
LT Distribution Box
Cable AL 4x25 Sq. mm PVC
LT ACB Out Door 400A
Wire Mesh Fencing
AL. Lug Long Barrel 240 Sq. mm.
B- Labour Charges
Cement Plaster Work
Chemical Earthing
Erection Of Earthing Rod
Fabrication Of Steel
Excavation Of Pit For Stay Set
Erection Of 11 Kv Stay Set
Grouting Of Stay Set
Dismantling Of 100 Kva DTR
Excavation Of Earth For DTR Plinth
Cement Concreting Work DTR Plinth
Brick Work In 1:4 Ratio DTR Plinth
Inst. Of 250 KVA DTR On Plinth
Fixing Of TPMO
Fixing Of Fuse Set
Cartage Of Petty Material,21-50 Km
Cartage Of 100 KVA DTR, 21-50 Km
Cartage Of 250 KVA DTR, 21-50 Km
Disconnection & Reconnection of Consumer
Fencing Of DTR
stage.html
html • 0.04 MB
techsummary_106037.pdf
BOQ Comparative Chart
xlsx
finsummary_106037.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
PQR13.pdf
Tender Documents • 1.06 MB
BOQ_106037.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid