Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC | ₹1.5 Cr | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹1.5 Cr+₹5.7 L (3.93%)Rejected-AOC | ₹1.5 Cr+₹5.7 L (3.93%) | L2 | Rejected-AOC L2 Bidder |
| 3 | Rejected-Technical | - | - | Rejected-Technical License category - Civil C |
Tender Value
₹1.7 Cr
EMD Value
₹50,000
Closing Date
15 Nov 2023, 12:00 pmClosed
Additional Director of Soil Conservation
Directorate of Soil Survey and Soil Conservation, 3rd and 4th Floor, Centre Plaza building, Vazhuthacaud, TVPM
1. Deepening and widening of stream and Retaining Wall,1.5 M height-770 Rm 2. RCC field channel and side wall for Diverting Water to Field Channel-490 Rm 3. Foot slab- Top of RCC Field Channel-4 Nos
2023_DSSC_605049_2
SSSC/1286/2023-PG1
Open Tender
Civil Works - Others
Item Rate
365 days
Ayanchery and Velom panchayath of Kozhikkode
Please refer Tender documents.
7 documents required · 7 mandatory
₹5,520
₹50,000
13 Dec 2023
6 Nov 2023
17 Nov 2023
6 Nov 2023
15 Nov 2023
6 Nov 2023
Amount
DEEPENING AND WIDENING OF STREAM AND RETAINING WALL FOR SIDE PROTECTION
2.6.1 -Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD469/2023-2024-DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble ncluding packing to compactness tolines and levels cost and conveyance of all materials labour charges etc.complete as per direction of Departmental officers at site
5.9.1- Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.6 -Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.1.2-Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
50.2.3.1- Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
RCC FIELD CHANNEL and SIDE WALL FOR DIVERTING WATER TO FIELD CHANNEL
2.6.1-Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD478/2023-2024-Filling with Quarry Muck Filling up low lying and water logged areas with local material/quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade.
OD1319/2023-2024-DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.3.1-Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.5-Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5.9.2-Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.22.-6-Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.1.2-Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
OD488/2023-2024 PVC WEEP HOLES-Providing weep holes using 75mm dia. PVC pipes working pressure 4kg/sq.cm including cost of materials, conveyance, labour charges etc.complete.
50.18.9.21.8-Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement -75 mm dia End cap
OD 490/2023-2024,FRP Shutters-Supplying and fixing FRP CHANNELS of "C" profile and sill beam size 100x100x100mm with flange of 50 to 75mm depth in the grooves already arranged and asper the direction of departmental officers.
OD 491/2023-2024, FRP SHUTTERS -Supplying and fixing FRP shutters of suitable size to with stand the design and max water pressure as prescribed by the departmental officer and installing the FRP channels provided in the grooves already arranged and as per the direction of departmental officers. Net Total 1.170sqm
2.25,Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
50.2.3.1,Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
FOOT SLAB-Top of RCC field channel
5.9.3,Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.22.6-Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.1.3-Providing and laying in position specified grade of reinforced cement concrete,excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
N C ABDUL GAFOOR
RAFEEQUE
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_931049.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .