| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.3 LAccepted-AOC 22045 R 100 M S PANJIPILLAI GINDADA P O KERALA | IDUKKI | KERALA | 685501 | L1 | Accepted-AOC L1 | |
| 2 | L2₹12.5 L+₹1.1 L (10.1%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | BAIJU L1 | MADATHUMBHAGAM LABOUR CONTRACT CO-OPERATIVE SOCIETY L2 |
|---|---|---|---|---|---|
| 1.00Canal work | |||||
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 570 | sqm | 9.37 ₹5,340.9 Lowest | 10.3 ₹5,871 |
| 1.00 | 2.33.3:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth | 2 | each | 11,499.15 ₹22,998.3 Lowest | 12,660.5 ₹25,321 |
| 1.00 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | 28 | cum | 1,569.11 ₹43,935.08 Lowest | 1,728 ₹48,384 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 49.8 | cum | 260.05 ₹12,950.49 Lowest | 286.32 ₹14,258.74 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 23.85 | cum | 8,007.8 ₹1,90,986.03 Lowest | 8,816.67 ₹2,10,277.58 |
| 1.01 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 360.6 | sqm | 847.53 ₹3,05,621.01 Lowest | 933.13 ₹3,36,488.54 |
| 1.01 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 45.15 | cum | 8,650.13 ₹3,90,553.37 Lowest | 9,523.8 ₹4,29,999.57 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 4.5 | cum | 9,323.3 ₹41,954.85 Lowest | 10,265 ₹46,192.5 |
| 1.01 | 13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand) | 270 | sqm | 320.31 ₹86,483.7 Lowest | 352.66 ₹95,218.2 |
Tender Value
₹10.3 L
EMD Value
₹25,747
Closing Date
12 Aug 2025, 6:55 pmClosed
Assistant Executive Engineer
o/oAssistant Executive EngineerKyIP Canal Subdivision Vadakara
GENERAL-KyIP CADA 2025-26-Renovation and modernisation works to East Velom Field Bothie inbetween Ch. 0/000 and 0/200 km- General Civil Work
2025_Irrig_782583_1
IRR/PI/TR/4213/2025_5_1_1/1
Open Tender
Civil Works - Canal
Item Rate
180 days
valakettu
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹25,747
Yes
31 Jul 2026
5 Aug 2025
14 Aug 2025
5 Aug 2025
12 Aug 2025
5 Aug 2025
5 Aug 2025 - 12 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1284113.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .