Loading…
Loading…
Tender Value
₹1.4 L
EMD Value
₹2,898
Closing Date
31 Aug 2026, 6:00 pm5d left
Executive Engineer Rew Baramulla
REW BARAMULLA
Improvement of panchayat Ghar salamabad Dachna A Under ADP / BDC 2026-27 P/H Salamabad A Block Bijhama
2026_RDPR_320500_13
195 Xen/Rew/Bla/2026-27 Dated 11/08/2026
Open Tender
Civil Works
Percentage
30 days
Baramulla
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Baramulla
₹2,898
11 Aug 2026
11 Aug 2026
1 Sept 2026
11 Aug 2026
31 Aug 2026
11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal ofexcavated earth lead upto 50 meters and lift upto 1.5 m, as directed byEngineer-in-Charge All kinds of soil : | 6.54 | Cum | 479.3 | ₹3,134.62 |
| 2 | Providing/Laying Stone soling Nallah hand packed on level in foundation trenches excluding carriages of Stones.(Under foundation trench & Floors) | 0.36 | Cum | 1,000 | ₹360 |
| 3 | Providing and laying in position plain cement concrete 1:4:8 mix ratio using 20 mm nominal size agg excluding cost of shuttering i/c curing( all works upto lintel level) | 0.27 | Cum | 5,209.9 | ₹1,406.67 |
| 4 | Brick work with common burnt clay F.P.S. (non-modular) bricks of class designation 75 in foundation & plinth in cement mortar 1:6 (1 Cement : 6 coarse sand) | 2.34 | Cum | 7,877.4 | ₹18,433.12 |
| 5 | Centering and Shuttering I/c Strutting, Propping etc & removal of formwork for roof. | 3.25 | Sqm | 718.2 | ₹2,334.15 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings,balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 0.33 | Cum | 9,821.85 | ₹3,241.21 |
| 7 | Reinforcment for R.C.C. work incl. straightening, cutting, bending, placing in position & binding all complete. | 0.33 | qtl | 11,535 | ₹3,806.55 |
| 8 | 12 mm Cement plaster on the rough side of single or half brick wall of mix: 1:6 mix | 43.68 | Sqm | 266.2 | ₹11,627.62 |
| 9 | P/L 40mm thick flooring with 20 mm nominal size stone aggregate. | 4.18 | Sqm | 510.25 | ₹2,132.85 |
| 10 | P/f of mild steel grills for door/window frames and shutters complete job | 4.36 | qtl | 12,000 | ₹52,320 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BOQ_1065771.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].