| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹36.4 LAccepted-AOC | 1 | Accepted-AOC LOWEST | |
| 2 | 2₹2.5 Cr+₹2.2 Cr (589.8%)Rejected-AOC 150 VILLARASAMPATIBALL ROAD PO NASIYANUR ROAD ERODE 638107 TAMIL NADU | ERODE | ERODE | TAMIL NADU | 638107 | 2 | Rejected-AOC HIGHEST | |
| 3 | Rejected-Technical | - | Rejected-Technical GENLINE HAS NO EXPERIENCE IN SIMILAR WORKS |
Tender Value
₹33 L
EMD Value
₹82,500
Closing Date
4 Aug 2020, 3:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Generation Division Seethathode
Stator coil repair/ replacement and re-insulation of 25MW generator UNIT #1 at Kakkad HEP to enable the generator for recommissioning
2020_KSEB_373579_1
EE-GDS/05/2020-21 dated 24.07.2020
Open Tender
Electrical and Maintenance Works
Item Wise
35 days
Seethathode
Please refer tender documents
6 documents required · 6 mandatory
₹5,959
online
₹82,500
19 Aug 2020
25 Jul 2020
7 Aug 2020
25 Jul 2020
4 Aug 2020
25 Jul 2020
25 Jul 2020 - 4 Aug 2020
120 days
Amount
Stator coil repair/ replacement and re-insulation of 25MW Generator Unit#1 at Kakkad Power House, Seethathode to enable the Generator for re commossing.
Removal of the first defective coil (Top /bottom) and fixing new coil back with necessary pole dismantling and re-fixing of associated 16 nos of coil
Charges for replacement of additional coils
Replacement of end cap( Top & Bottom)
a. Top Over hang Portion re-installating. b. Jumber lead re-insulation laying and proper supporting by replacing defective clamps etc. c. Supply and replacement of defective supporting brackets (HylemSheet) of size 30 mm thickness of where ever required d. Supply and replacement ring segment where ever required
Through cleaning of winding. Gel coat painting (core portion) double coat. Bectol red painting ( winding portion ), complete drying out of winding and core with equipments supplied by KSEB Ltd. Testing the stator with the following tests a.Winding joint resistance test(ultrasonic test) b. Surge comparison test c. Supply of terminal clamp insulating assembly at both terminals( NGT side & SPPT Side)
Any other item identifiyied by the contractor for the successful completion of the work.
Coral Rewinding India Private Limited
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .