MUNICIPAL CORPORATION TIRUPATI
Thirupathi
Construction of damaged drains from 19-4-372 to 19-4-303, 19-4-336 to 19-4-345/A and Laying of CC Road from 19-4-336 to 19-4-345/A at STV Nagar in Ward No. 14 (Reserved for SC/ST and Waddera).
939725
08/TPT/26-27/GEN/TO, Dt. 27-05-2026
OPEN - NCB
Civil Engineering Works
TIRUPATHI
8 documents required · 7 mandatory · 1 optional
₹283
₹7,991
3 Jun 2026
3 Jun 2026
3 Jun 2026
BLD-CSTN-12-1 Demolishing and disposal of unserceable materails within 100 Mts lead For brick work (Revised standard data) BLD-CSTN-14-9
BLD-CSTN-12-1 Demolishing and disposal of unserceable materails within 100 Mts lead for CC Ramps
BLD-CSTN-12-2 Demolition including stacking of serviceable materials and disposal of unserviceable materials within 100 Mts lead for RCC Ramps
(RBR -FNDN-1 (i)) Earthwork excavation for Structures as per drawing and technical specifications clause 305.1 including dewatering, setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50mtrs, dressing of sides, bottom and back filling in trenches with excavated suitable material as per technical specification 305 MORD / 304 MORth
(RBR-FNDN-2) Providing bedding with sand for necessary areas as per specification and drawing including cost and conveyance of materials to site with all leads, lifts including watering, tamping, ramming, labour charges, all other incidental and operational charges etc., complete as per detailed specification and directed by the Engineer - in - Charge (as per SSR 14-15- Amendment)
(RBR-FNDN-4G-4V-i) Providing Plain cement concrete M 15 Grade Nominal Mix as approved by the department using 20 mm graded hard granite machine crushed metal including cost and conveyance of all materials to site, machine mixing of concrete, all lifts, leads, delifts, centering, laying in position, vibrating, compacting, curing, removal of centering, all labour charges, tools and plants, and all other incidental and operational charges etc., complete as per specifications, drawings and as directed by the Engineer - in - Charge (may be used as CC 1:2:4) For Drain bed
(RBR-FNDN-4G-4V-i) Providing Plain cement concrete M 15 Grade Nominal Mix as approved by the department using 20 mm graded hard granite machine crushed metal including cost and conveyance of all materials to site, machine mixing of concrete, all lifts, leads, delifts, centering, laying in position, vibrating, compacting, curing, removal of centering, all labour charges, tools and plants, and all other incidental and operational charges etc., complete as per specifications, drawings and as directed by the Engineer - in - Charge (may be used as CC 1:2:4) for Drain Walls
(BLD-CSTN 6-3) Plastering with CM (1:5) prop., 12 mm thick, with sponge finishing including cost and conveyance of all materials to site, tools and plants, labour charges, leads, lifts, curing, scaffolding and all other incidental and operational charges etc., complete for finished item of work
(BLD-CSTN 2-13) RCC M- 20 Nominal Mix as approved by the department Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For M20 Culvert SLABS - above 150 mm - Up to 300 mm thick
(BLD-CSTN-2-18) Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) bars (Fe 415 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete
Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of manhole covers and frames with ISI marking anywhere in A.P.,F.O.R. destination including, loading, unloading & stacking at site but excluding central excise duty, sales tax, octroi and other Govt levies etc., as applicable.I.S.I Mark
Raising of Existing Manhole to the present Road Level and Dismantling and clearing away of Concrete
(RBR-CCPV-5) Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars and construction joints, plasticizer to attain proper workability as per IS 9103/99 & as approved, curing of concrete slabs for 14- days, curing compound and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD. item RBR-CCPV-5 of standard data.
Carting away the surplus excavated material i.e., earth from the site to a suitable distance of about 5 kms including loading, unloading, conveyance, labour charges, all leads and lifts and other incidental and operational charges etc., complete. Stone Type Materials
Carting away the surplus excavated material i.e., earth from the site to a suitable distance of about 5 kms including loading, unloading, conveyance, labour charges, all leads and lifts and other incidental and operational charges etc., complete.Earthern Type Materials
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BoQ-08-26-27.xlsx
TENDER_DOCUMENT • 0.02 MB
Download all tender documents and submit your bid