Loading…
Loading…
Tender Value
₹2.9 Cr
EMD Value
₹5.7 L
Closing Date
29 Jul 2026, 3:00 pm3d left
The EE, MCD, PWD(B),ILS Road, Khejurbagan
O/O The EE, MCD, PWD(B),ILS Road, Khejurbagan
Special Repair and water tightness of terrace at Citizen Charter Old Block AGMC and GBP Hospital, Agartala, Tripura (W) during the year 2025-26.
2026_CEPWD_74698_1
CE(B)/PWD/ACE/PU/DNIT/07/26-27
Open Tender
Civil Works - Building
Percentage
60 days
At AGMC and GBPH
Please refer to Tender Documents
3 documents required · 3 mandatory
₹8,000
₹5.7 L
15 Jul 2026
15 Jul 2026
29 Jul 2026
15 Jul 2026
29 Jul 2026
15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Removal of existing water proofing system upto any thick max upto 20 to 400 mm and disposing the debris upto a max.lead of 1 km from site to stocking ground including cost of labour, tools, tackles, equipments etc. complete all including removal of debris. | 6,762.53 | Sqm | 205 | ₹13,86,318.65 |
| 0.0 | Providing and fixing shear connectors, fixing with epoxy as per manufactures specification, drilling 10mm dia hole upto a depth of 100mm, cleaning the holes with blowers etc. and fixing connectors with 8mm steel upto a length of 150mm to 300mm depending upon the requirement including cutting and bending with labour, equipment, machinary etc. complete wherever required. | 45,710 | Nos | 110 | ₹50,28,100 |
| 0.0 | Surface preparation by overlay (50mm) with rich grade concrete M25 and (Pre-packed polymer modified mortar if required), by Vaccume Dewatering System with separated with plain glass of suitable size on either side or grovering excluding the cost of centering shuttering, and reinforcement, including Polypropylene Fibre at the rate of 800 Gm per cum of concrete and admixture at the rate of 150ml per bag of cement, etc complete and the glass shall be fixed with micro concrete or equ. including bond coat of SBR/cement slurry etc complete after removing loose friable material and weak concrete, surface defects such as blowholes and voids must be fully exposed. Repairs to be substrate, filling or joints, blowholes/voids and surface leveling must be carried out using appropriate products, surface biocide used in the treatment of microbial contamination (fungi, algae, mosses, lichen, mildew and moulds) to be applied prior to the application of a coating system. It is also essential that visible growth, flaking paint and others loose materials are removed prior to application. This may be achieved by wire brush, scraper or other similar means.Oil/grease contamination should be removed using a proprietary solution etc. complete, High spots/undulation must be removed by grinding, outgrassing is a naturally occuring phenomenon of concrete that can produce pinholes in sussequently applied coatings, so the surface preparation must be touch sound and neat & clean to receive the coating.Measurement shall be in length and breath of the over lay, steel, shear connector & centering shall be paid separately. | 6,762.53 | Sqm | 1,400 | ₹94,67,542 |
| 0.0 | Providing and placing in position Micro Concrete, which shall be cement based pre-packed single component chloride free, non-shrink , free flow, self compacting ready to use after mixing water in specified proportion obtained from approved manufacturer as per specification upto Grade not less than M40 for column, beam, slab etc. wherever required including mixing with paddle fitted low RPM machine, including materials, Aggregate, labours etc. complete. | 115.07 | Sqm | 6,000 | ₹6,90,420 |
| 0.0 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or
more | 3,007.67 | Kg | 103.9 | ₹3,12,496.91 |
| 0.0 | Centering shuttering including struttings, propping etc.
and removal of form work for:Suspended floors, roofs, landings, balconies and access platform with 12 mm thick shuttering ply | 763.3 | Sqm | 729.5 | ₹5,56,827.35 |
| 0.0 | Providing and applying PU coating ( Polyurethane) by spray etc complete as per manufacture specification minimum PU at the rate 0.700 kg/ Sqm etc complete the substrate should be checked for < 4% pbw moisture content, Relative Air Humidity 85% r. h. max, the mixing must be thoroughly mixed using a low speed electric stirrer (300 - 400 rpm) or other suitable equipment, if applied by roller then roller shall be With a solvent resistant, “non-fuzzy” roller, or if applied by spray then spray shall be Airless spray equipment, for example: piston pump Wagner EP 3000. (pressure: ~ 200 - 250 bar, nozzle: 0.38mm - 0.53mm, angle: ca. 50 - 80°) including materials , skilled applicator, labours , tools tackles etc complete (The product performance shall be guranteed for ten year from the date of application) | - | - | - | - |
| 0.9 | Two component, composite water based silicone impregnateing solution with Nano mechanism, which impart water repellency at 100% for mineral construction materials, with UV resistance, barrier against chloride ions, carbon dioxide and water, it can be Siloxane- Silicone modified two-component waterborne polyurethane was synthesized by the reaction between siloxane-modified hydroxyl-functional polyurethane aqueous dispersion and the hydrophilic-modified polyisocyanate, or with any such equal composite mechanism, with a NANO mechanism, so that, the process of impregnateing and surface protection shall be ensured.Two process waterproofing systemComponent "A" as base application - Impregnateing solution with low vicious, which should provides 100% water repellency Component "B" as top application- Protection to treated surface with UV resistance, barrier against chloride ions, carbon dioxide and water, with excellent bond strength, etc.Measurement shall be in lenghth and breath | 6,762.53 | Sqm | 1,135.57 | ₹76,79,326.19 |
| 0.0 | Demolishing reinforced cement concrete manually /
by mechanical means including stacking of steel
bars properly and disposal of unserviceable material
with all lifts and upto 50 m lead etc. complete as per
direction of the Engineer- in-charge. | 38.17 | Cum | 2,087.3 | ₹79,672.24 |
| 0.0 | Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to pproved municipal dumping ground for lead upto 10 km for all lifts, complete as per directions of Engineer-in-charge.
Note - item to be applicable in urban areas having directions for restricted hours for movement/ plying of load carrying motor
vehicle of 3.5 cum or more. | 511.54 | Cum | 399.9 | ₹2,04,564.85 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
INTEGRITY.PDF
Additional Documents • 0.19 MB
DNIT.pdf
Tender Documents • 2.94 MB
BOQ_76034.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].