Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.6 LAccepted-AOC UMMATHOOR HOUSE KAVUNGAL UP HILL MALAPPURAM DIST PIN 676 506 | MALAPPURAM | MALAPPURAM | KERALA | 676506 | L1 | Accepted-AOC L1 | |
| 2 | L2₹65.4 L+₹3.2 L (5.22%)Rejected-Finance DOOR NO 592A 5928 VARIKKODAN OFFICE BUILDING VALIYAVARAMBA ROAD DOWN HILL MALAPPURAM 676519 | DOWN HILL | MALAPPURAM | KERALA | 676519 | L2 | Rejected-Finance L2 |
Tender Value
₹54.5 L
EMD Value
₹50,000
Closing Date
29 Jun 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Project Division ,KWA ,Malappuram
KIIFB Special Investment Package WSS to Tanur Municipality and Adjoining Four Panchayaths in Malappuram district Overhauling Electromechanical Equipment
2024_KWA_676677_1
EE/PROJ/MPM/03/2024-25
Open Tender
Electrical and Maintenance Works
Item Rate
90 days
TANUR
AS PER NIT
8 documents required · 8 mandatory
₹2,760
₹50,000
4 Jul 2025
19 Jun 2024
1 Jul 2024
19 Jun 2024
29 Jun 2024
19 Jun 2024
19 Jun 2024 - 29 Jun 2024
Amount
Appendix A1: RWPM SUBSTATION
OD306702/2023-2024:Oil filtration of 1 no 1250KVA transformer & OLTCs And 01No. 100KVA transformer to improve the BDV of oil Oil leak arresting etc. complete
OD306703/2023-2024:1250 kva transformer IR value, polarization index and dielectric absorption ratio testing
OD306704/2023-2024:100 kva transformer IR value, polarization index and dielectric absorption ratio testing
OD306705/2023-2024:Supply and filling of transformer oil (liter)
OD306706/2023-2024: Transporting costs of filter machine to site
OD306707/2023-2024:Supply & replacing Silica gel for Air breathers
OD306708/2023-2024:Charges for 11kv load breaker switch servicing and testing
OD306709/2023-2024:Megger testing of transformers and General servicing of the OLTC ( with out spares )
OD306710/2023-2024:Cleaning the 11KV panel, closing of cable entry holes with fire retardant compounds, removing moistures from 11kv VCBs checking the proper working of breakers, testing of protection relays for pickup and trip using current injection, indication lamps, other parameters and megger testing Incomer and outgoing 11KV VCBs(including spare)
OD306711/2023-2024:Cleaning the 3.3KV panel, closing of cable entry holes with fire retardant compounds, removing moistures from 3.3kv VCBs checking the proper working of breakers, testing of protection relays for pickup and trip using current injection, indication lamps, other parameters and megger testing Incomer and outgoing 3.3KV VCBs(including spare)
OD306712/2023-2024:Rental charges of 65kva 415v diesel generator for power supply in raw water substation to power up oil filtration machine including transportation
Appendix A2 :RAW WATER
OD306724/2023-2024:FCMA starter restoration, checking for proper working of reactors, vacuum contactors, Testing of protection relays for pickup and trip using current injection test equipment and proper setting of relay, Testing of timer and auxiliary relays, indication lamps and breakers and rewiring of starters and megger testing
OD306725/2023-2024:Cleaning the Starter panel, closing of cable entry holes with fire retardant compounds, cleaning the panel, removing moisture contents from starters and improving the IR values
OD306726/2023-2024:FCMA starter manufacturer engineer onsite assistance for commissioning
OD306727/2023-2024:Commissioning of 370KW 3300v FCMA soft starter and trial run works
OD306728/2023-2024:Charges for dismantling the electrical terminations to the motor, removing all foundation bolts of motor and lifting out the motor from the base including cost of labor and hire charges for tools and equipments
OD306729/2023-2024:Charges for removing oil based bearing coupling, dismantling the motor housing and checking the bearing and oil of coupling
OD306730/2023-2024:Charges for lifting out all column pipes, center shafts and bushings and multi-stage impeller, straightening and polishing all center shafts including cost of labors including replacing rubber spider bushing as required
OD306731/2023-2024:Charges for dismantling the impeller unit, cleaning and polishing inner and outer surfaces and checking for any defect and assembling the multi-stage impeller unit complete making sure free rotation of the impeller with shaft.
OD306732/2023-2024:Charges for checking Vertical alignment and correcting motor pedestal and pump outlet head positions and level as required.
OD306733/2023-2024:Charges for dropping down the impeller unit by connecting all column pipes, bushes, center shafts, spider bush and bearing etc. using trolley and man power by providing new SS nut & bolts between each column pipes including cost of labors
OD306734/2023-2024:Charges for seating the motor pedestal housing on floor base, tightening all fasteners, setting the drive shaft Nut for free rotation of the shaft, fixing the coupling on housing, setting bearing and non reversible ratchet and refilling the oil in coupling unit including cost of oil
OD306735/2023-2024:Charges for fixing the motor on housing, checking level and alignment and making correction as required tightening all foundation bolts, connecting all electrical terminals to the motor and coupling the motor with pump set
OD306736/2023-2024:Megger testing of motor for any defect and commissioning of motor pump sets
Appendix A3 : REWORK OF FLASH MIXER
OD306760/2023-2024:Dismantling the flash mixer gearbox and motor from the structure, removing oil from gearbox, Providing new bearings and oil seal for gearbox and refilling the new Gear oil for gear box including cost of labors and materials
OD306742/2023-2024:Aligning the gearbox and motor, coupling the gearbox with motor, connecting the electrical terminals to motor and trial run works
OD306743/2023-2024:Re-alignment of center shaft of flash mixer and providing new pillow block bearing for supporting of paddles
14.54.1:Painting with synthetic enamel paint of approved brand and manufacture of required colour to an give even shade:One or more coats on old work
Appendix A4 : FLOCCULATOR WORK
OD306750/2023-2024:Dismantling the flocculator gearbox from the structure, removing oil from gearbox, Providing new bearings and oil seal for gearbox and refilling the new Gear oil for gear box including cost of labors and materials
OD306751/2023-2024:Supply of 415v 0.75kw (1 HP) 940 rpm foot mounted induction motors for flocculator
OD306752/2023-2024:Aligning the gearbox and motor, coupling the gearbox with motor, connecting the electrical terminals to motor and trial run works
OD306753/2023-2024:Re-alignment of center shaft of flocculators and providing new center bearing for center shaft
14.54.1:Painting with synthetic enamel paint of approved brand and manufacture of required colour to an give even shade:One or more coats on old work
OD306755/2023-2024:Dismantling the operating gearbox from flocculator scour valve, checking for any defect, providing grease and oil gasket for gear box and fixing back on valve, dismantling the valve ON/OFF feedback relay from the valve, rewiring the relays, checking the proper working of relays and fixing back on valves
Appendix A5 : CHEMICAL DOSAGE
OD306764/2023-2024:Dismantling gearbox from the structure, removing oil from gearbox, Providing new bearings and oil seal for gearbox and refilling the new Gear oil for gear box including cost of labors and materials
OD306765/2023-2024:Supply of 415v 0.75kw (1 HP)1440 rpm foot mounted induction motors and connecting belts for chemical dosing
OD306766/2023-2024:Aligning the gearbox and motor, connecting the electrical terminals to motor and trial run works
OD306767/2023-2024:Re-alignment of center shaft of mixer and providing new pillow block bearing for supporting of paddles
14.54.1:Painting with synthetic enamel paint of approved brand and manufacture of required colour to an give even shade:One or more coats on old work
Appendix A6 : PLATE SETTLER
OD306772/2023-2024:Carefully removing the entire SS sheets from the plate settler, cleaning of plates, each slot and replacing the same carefully without any damage to the SS sheets.
OD306773/2023-2024:Dismantling the operating gearbox from clarifier scour valve, checking for any defect, providing grease and oil gasket for gear box and fixing back on valve, dismantling the valve ON/OFF feedback relay from the valve, rewiring the relays, checking the proper working of relays and fixing back on valves
Appendix A7 : PULSATOR WORK
OD306779/2023-2024:Dismantling the scraper mechanism, providing new ball couplings for scrapper trolly and connecting trolly with electric motor
OD306780/2023-2024:Checking the pulsator air feeder pipes for any broken pipes and replacement of feeder pipes
Appendix A8 : PULSATOR BLOWER
OD306810/2023-2024:Dismantling the electrical terminations of pulsator blower motor, removing blower case, cleaning the corroded fan blades, assembling the case by providing gaskets, connecting the electricity and commissioning
Appendix A9 : PIPE GALLERY
OD306812/2023-2024:dismantling the operating gearbox from back wash inlet main valve, checking for any defect, providing grease and oil gasket for gear box and fixing back on valve, dismantling the valve ON/OFF feedback relay from the valve, rewiring the relays, checking the proper working of relays and fixing back on valves
OD306813/2023-2024:dismantling the operating gearbox from back wash inlet valve, checking for any defect, providing grease and oil gasket for gear box and fixing back on valve, dismantling the valve ON/OFF feedback relay from the valve, rewiring the relays, checking the proper working of relays and fixing back on valves
OD306814/2023-2024:dismantling the operating gearbox from back wash outlet valve, checking for any defect, providing grease and oil gasket for gear box and fixing back on valve, dismantling the valve ON/OFF feedback relay from the valve, rewiring the relays, checking the proper working of relays and fixing back on valves
OD306815/2023-2024:dismantling the operating gearbox from filter outlet valve , checking for any defect, providing grease and oil gasket for gear box and fixing back on valve, dismantling the valve ON/OFF feedback relay from the valve, rewiring the relays, checking the proper working of relays and fixing back on valves
OD306816/2023-2024:Dismantling the operating gearbox from air wash main valve, checking for any defect, providing grease and oil gasket for gear box and fixing back on valve, dismantling the valve ON/OFF feedback relay from the valve, rewiring the relays, checking the proper working of relays and fixing back on valves
OD306817/2023-2024:Dismantling the operating gearbox from air wash valve, checking for any defect, providing grease and oil gasket for gear box and fixing back on valve, dismantling the valve ON/OFF feedback relay from the valve, rewiring the relays, checking the proper working of relays and fixing back on valves
OD306818/2023-2024:Dismantling the operating gearbox from filter inlet gear shutter valve, checking for any defect, providing grease and oil gasket for gear box and fixing back on valve, dismantling the valve ON/OFF feedback relay from the valve, rewiring the relays, checking the proper working of relays and fixing back on valves
OD306819/2023-2024:Dismantling the filter outlet controller system (controller buddy), realigning the driven and extended shaft, restoring the corroded particles and assembling the system in filter outlet chamber
Appendix A10 : FLOW SENSOR
OD306820/2023-2024:Dismantling the flow sensor from filter outlet channel, checking for the proper working of sensors, rewiring and calibration of flow sensors
Appendix A11 : BLOWER
OD306823/2023-2024:Lifting out the blower unit from base, dismantling the blower unit, boring the corroded inside edges and fan blades and assemble the blower unit by providing oil gaskets and seals, checking for smooth working of blower and making the blower functional
OD306824/2023-2024:Cleaning the corroded outer surfaces, re-racking the blower to base and painting the blower unit
OD306825/2023-2024:Aligning the blower with motor, connecting with belt and trial run works including including cleaning panels, checking IR value and cost of labors
Appendix A12 : CLEAR WATER PUMPSETS
OD306827/2023-2024:Megger testing and commissioning of 315 kva transformer
OD306828/2023-2024:VFD starter restoration, checking for proper working of VFD, protection relays, indication lamps and breakers and rewiring of starters and megger testing
OD306829/2023-2024:Decoupling the pump with motor, dismantling the pump from base, checking the pump set for any defect, cleaning the corroded particles of pump and painting work
OD306830/2023-2024:Realigning the pump set with motor by providing shim plates, coupling the motor with pump set and completion works
OD306831/2023-2024:Dismantling the clear water pump set lifting device, providing grease and oil for device, checking the proper working of device and fixing the device back on rail
Appendix A13 : WASH WATER PUMPSETS
OD306833/2023-2024:Dismantling the electrical terminations of Wash water pump sets , removing pump case, checking for any defect in impellers, assembling the case by providing gaskets, connecting the electricity and commissioning
OD306834/2023-2024:Dismantling the Wash water pumping line valve, checking for any defect, providing grease and oil gasket, dismantling the valve ON/OFF feedback relay from the valve, rewiring the relays, checking the proper working of relays and fixing back on valves
Appendix A14 : CHLORINATION
OD306836/2023-2024:Chorine tonner lifting device electrification work and rewiring of control panel
OD306837/2023-2024:Supply, installation and commissioning of 1.5hp kirloskar make booster pump with motor, base frame and coupling
OD306838/2023-2024:supply, installation and commissioning of two tonner and four chlorinator manifold system made out of 20 NB sch 80 carbon steel with necessary copper tubes and fittings
OD306839/2023-2024:Supply, installation and commissioning of wall mounted chlorinator with injector and interconnecting tubing.
OD306840/2023-2024:Tonner Auto Changeover System with bypass arrangement system comprising of : a. Motor actuated ball valve – 2 Nos. b. Pressure Switch with isolating diaphragm – 2 Nos. c. Ball valve with flanged ends (By pass) – 5 Nos. d. Interconnecting piping & fittings – 1 Lot
OD306841/2023-2024:supply of Self contained breathing Apparatus with full vision face mask (ISI Marked)attached with pressure gauge, high pressure tubes coupled with 200 bar cylinder as per IS 7625 mounted on a fiber glass back plate.
OD306842/2023-2024:Supply of Emergency Repair Kit ‘B’ for Chlorine Ton Containers having following items, as per details of Chlorine Institute USA. 1. Assembly for repair leaks of chlorine Tonner valve. 2. Assembly for repair leaks of tonner body. 3. Assembly for repair leaks of filling plug. 4. Canister type Gas mask. 5. PVC Chlorine resisting clothing. 6. Necessary tools for operation of kit. 7. Steel box for keeping all the above items.
OD306843/2023-2024:Supply of Chlorine Leak Detector – single sensor, PVC clothing and Electric control panel for operation of pre and post chlorination
OD306844/2023-2024:Re-inspection of chlorine cylinders at PETROLEUM AND EXPLOSIVES SAFETY ORGANIZATION for explosives safety inspection certificate and LRA certificate including cost of transportation of cylinders to hariyana and re-do
OD306845/2023-2024:charges for sending the chlorine cylinders for inspection of explosives safety LRA
Appendix A15 : SCADA REQUIREMENTS
OD306848/2023-2024:Supply of ALLEN-BRADLEY 1769 PA2 power supply
OD306849/2023-2024:supply of ALLEN-BRADLEY 1606-XLB240E power supply
OD306850/2023-2024:Supply of Endress+Hauser FMR10 Level sensor
OD306852/2023-2024:supply E+H PROMAG10 electronic card
OD306853/2023-2024:supply of 2000x800mm Rittal enclosure side panel for PLC panel
OD306854/2023-2024:Supply of CPU supporting the SCADA system and mouse, keyboard and speakers for plant overview monitoring
OD306855/2023-2024:Supply of plant overview monitoring TV - 40 inch
OD306856/2023-2024:Supply of office table 4 nos and and office chair 4 nos of good quality as per the direction of departmental officers
OD306868/2023-2024:supply of 2000VA inverter with twin 12v 200Ah battery of approved make as per the direction of departmental officers
Appendix A16 : ALUMINIUM FABRICATION WORKS
21.1.1.1:Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate Z sections and other sections of approved make conforming to IS : 733 and IS: 1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminnium snap beading for glazing /paneling, C.P. brass/ stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-charge.(Glazing, paneling and dash fasteners to be paid for separately): For fixed portionAnodised aluminium (anodised transparent or dyed to required shade according to IS : 1868, Minimum anodic coating of grade AC 15)
21.1.2.1:For shutters of doors, windows & ventilators including providing and fixing hinges / pivots and making provision for fixing of fittings wherever required including the cost of EPDM rubber/ neoprene gasket required (Fittings shall be paid for separately)Anodised aluminium ( anodised transparent or dyed to required shade according to IS : 1868, Minimum anodic coating of grade AC 15)
21.2.1:Providing and fixing 12 mm thick prelaminated particle board flat pressed three layer or graded wood particle board conforming to IS : 12823 Grade I Type II, in panelling fixed in aluminum doors, windows shutters and partition frames with C.P. brass / stainless steel screws etc. complete as per architectural drawings and directions of Engineer - in- Charge.Pre-laminated particle board with decorative lamination on one side and balancing lamination on other side
21.3.1:Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of Engineer - in -Charge. ( Cost of aluminium snap beading shall be paid in basic item):With float glass panes of 4.0 mm thickness
Appendix A17 : MAINTENANCE OF OVERHEAD CRANE AT INTAKE WELL
OD306864/2023-2024:Checking of all electrical connections and contactors, switches, taking IR value, making all electrical and mechanical connections as required for proper functioning of the trolley, remote operating switch box and lifting mechanism. Lubricating the steel rope using proper grade lubricating compound Including commissioning and trial run of the OH Crane.
MIDLAND ENGINEERING AND CONTRACTING COMPANY
Bidder Name
Fakrudheen ali ahammed
MIDLAND ENGINEERING AND CONTRACTING COMPANY
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1052175.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .