Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.1 LAccepted-AOC KORAMANGALATH HOUSE TOMY LANE SOUTH PANAMBILLY NAGAR KADAVANTHRA P O KOCHI 682 020 | KOCHI | ERNAKULAM | KERALA | 682020 | L1 | Accepted-AOC L1 | |
| 2 | L2₹30.3 L+₹3.9 L (14.7%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹35.1 L+₹8.7 L (32.7%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
₹37 L
EMD Value
₹74,000
Closing Date
20 Jul 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE NS KOCHI
Military Engineer Services Garrison Engineer (Naval Services) Kataribagh, Naval Base Post Kochi 682004.
REPAIR / MAINTENANCE OF COMMAND SWIMMING POOL AND DIVING CHAMBER AT NAVAL BASE KOCHI.
2024_MES_661210_1
8362/E8
Open Tender
Civil Works
Item Rate
330 days
Kochi
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹74,000
Yes
20 Dec 2024
21 Jun 2024
22 Jul 2024
21 Jun 2024
20 Jul 2024
6 Jul 2024
21 Jun 2024 - 5 Jul 2024
Amount
Material & Labour in repair open pressure filter of capacity 120 Cum/hour, drain out water remove all filters media (sand & pebbles) cleaning the internal surface and applying one coat of anti-corrosive bituminous paint pebbles duly washed and cleaned with fresh water and reassembly the filter testing and commissioning complete all as specified and directed
Material & Labour for Quartz sand in two grades replacement in the filter grade size 16/30mm or 6/3 mm complete all as specified and as a directed.
Supply and fixing MS Butter fly valve 200mm dia all as specified and directed
Supply and fixing MS Butter fly valve 150mm dia all as specified and directed
Supply and fixing MS Buffer type NRV 200mm dia all as specified and directed
Supply and fixing MS Buffer type NRV 150mm dia all as specified and directed
Material & Labour for dismantling unserviceable electric motor 2 HP capacity 50Hz 400/415 Volts 3 phase from existing LT panel board removing carefully taking out old burn out winding cleaning of slots , motor and stator complete, rewinding the motor with super enamelled copper winding wire of same gauge as per existing pattern with proper material apply two coat of varnish and heating of windings , reassembled the motor, refixing in the same location testing and commissioning of motor on full load to the entire satisfaction of Engineer in charge
Supply and fix UPVC butter fly valve of size 150mm dia taking down the old unserviceable butter fly valve all as specified and directed
Supply & fix three core flat cable of size 10 Sqmm with bare bunched copper conductor insulated with PVC and sheathed with PVC for suction sweeper pumps with voltage grade up to 1100 volts generally conforming to IS 694: 1990 complete all as specified and directed
Material & Labour for Cleaning of RCC Balancing at command swimming Pool tank of capacity 50,000 Liters complete all as specified.
Material & Labour for scrubbing & cleaning thoroughly for removing the dirt’s, sediments, silts etc from the internal surfaces of HDPE storage tank 5000 litres of capacity (bottom and wall) by using brushes, bleaching powder and other cleaning materials as required.
Material & Labour for maintenance and cleaning of command swimming pool all as specified and directed.
Material & Labour for maintenance and cleaning of old swimming pool all as specified and directed
Notes for item No 12 & 13:-Daily routine maintenance tasks include the following:- (a) Checking of all parts of the plants for its functional stability. (b) Calibrating and dozing the plant to obtain variable dosage 2 PPM at user's end. (c) Testing chlorinated water for correct dosage. (d) Routine maintenance tasks shall be carried out from 0800 hrs to 1600 hrs. Record of testing/dosage/time of checking, maintenance carried out etc. shall be maintained separately for each plant by the contractor. (e) Spares for replacement if any will be measured and paid separately as supply & fix as per requirement (f) Suction sweeping the bottom of the entire pool for a period of two hours (4 AM to 6 AM) or as required to clean the water for bailing out the sediments. (g) Removing all floating particles by using net before 6 AM.
(h) Cleaning of command swimming pool every Monday & Thursday including brushing inside the entire pool having bottom area 1540 Sqm, side wall having an area 515 Sqm, 172-meter-long scum channel and having 667500 gallons entire capacity of water. (j) Cleaning of old swimming pool every Tuesday & Friday including brushing inside the entire pool having bottom area 380 Sqm, side wall having an area 168 Sqm, 84-meter-long scum channel and having 107000 gallons entire capacity of water. (k) Backwashing of the filter media by operating various control valves accommodated with the filtration plant adequately with trained operators to removing sludge clogged inside the filter media directly to the outside drainage without entering into the swimming pool once in a week (Command and Old Swimming pools). (l) Contractor shall deploy sufficient manpower to carryout above said maintenance including providing telescopic brush & cleaning materials include in quoted rates. If any time found the any pool dirty, contractor is liable a penalty of Rs 5000/- per day till the pool cleaned. .
(m) Adding requisite quantity of chemicals considering the condition of the pool: - (i) Dozing requisite quantity of Calcium Hypochlorite and bleaching powder through dozing system for maintaining the percentage of chlorine up to 2 PPM every day (0700 Hours to 2100 Hours). (ii) Dozing requisite quantity of alum through alum dozer for better sedimentation of impurities in the pool water. (iii) Dozing requisite quantity of soda ash through soda ash dozer for maintain the PH level of pool water between every day (0700 Hrs to 2100 Hrs). (iv) Add sodium hypo chloride for maintaining the percentage of chlorine up to 2 PPM every day. (e) Chemical will be measured and paid separately as supply only as per requirement
Supply only bleaching powder ISI marked superior quality.
Supply only Soda Ash.
Supply only Alum Sulphate.
Supply only Sodium Hypochlorite.
Supply only Calcium Hypochlorite Granules disinfectant for water treatment having chlorine content (60-70) % complete all as specified.
Supply only poly aluminium chloride (PAC) COAGULANT CONTAINING APPROX 29% Al2O3 with basity of approximately 64% packed complete all as specified.
Supply only Ortho - Tolidine solution for testing of dissolved chlorine in water .
Material and labour for disconnecting of suction and delivery pipe and electric connections, from three phase centrifugal pump sets motor of 10 HP capacity and dismantling the pump sets complete from the foundation, strip opening the unserviceable motor at site to located the fault and transporting to the local work shop. Strip opening the motor and cutting/removing burnt out winding and rewinding the motor with as per existing original wire gauge super enamelled copper wire including high quality 'F' class insulating material with heat resistant sleeves, sealing compound and varnishing and heating the stator up to varnish fully dry and testing the motor at work shop to the satisfaction of Engr-in-charge. Coupled the motor with pump and installed at site as per existing position. Testing the pump set after completion of work all as specified.
Material and labour for disconnecting of suction and delivery pipe and electric connections, from three phase sweeping motor 5 HP capacity and dismantling the pump sets complete from the trolly, strip opening the unserviceable motor at site to located the fault and transporting to the local work shop. Strip opening the motor and cutting/removing burnt out winding and rewinding the motor with as per existing original wire gauge super enamelled copper wire including high quality 'F' class insulating material with heat resistant sleeves, sealing compound and varnishing and heating the stator up to varnish fully dry and testing the motor at work shop to the satisfaction of Engr-in-charge. Coupled the motor with pump and installed at site as per existing position. Testing the pump set after completion of work all as specified.
Supply & Fix Framed / Fabrication work for, such as Valve chamber covers, Static Tank Cover, Base frames for pump sets, Protection covers for Pump sets / Panel Boards, Staging for Water tanks, ladders, etc. complete all as specified and as directed
Supply & Fix filter bucket stainer set suitable for 10 HP pump set 200 mm dia complete set all as specified and directed.
Amount of Credit Schedule shall be deducted to arrive the Contract Sum.
SRI AYYAPPA ENTERPRISES
SOORYA ASSOCIATES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .