Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.1 LAdmitted-Finance | ₹11.1 L | L1 | Admitted-Finance |
| 2 | L2₹19.6 L+₹8.5 L (77.2%)Admitted-Finance | ₹19.6 L+₹8.5 L (77.2%) | L2 | Admitted-Finance |
| 3 | L3₹10.8 L−₹30,800 (2.78%)Admitted-Finance | ₹10.8 L−₹30,800 (2.78%) | L3 | Admitted-Finance |
| 4 | L4₹11.8 L+₹70,000 (6.33%)Admitted-Finance | ₹11.8 L+₹70,000 (6.33%) | L4 | Admitted-Finance |
| 5 | L5₹10.9 L−₹14,000 (1.27%)Admitted-Finance | ₹10.9 L−₹14,000 (1.27%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SHREE GANPATI ENTERPRISES L5 | M/S Shree Bajrang Enterprises L6 | nipputiwari L2 | M/S Vijay Bahadur Yadav L1 | ANIMESH KUMAR L3 | BRIJESH UPADHYAY L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00PART-A (SUGAULI) Handling of ash during the season for the 110 TPH boiler at HBL’s 3500 TCD integrated sugar plant, Sugauli. Job description given below and attached tender document: | |||||||||
| 1.01 | Handling of Ash for 110 TPH Boiler at 3500 TCD Sugar Plant Sugauli.
Job includes:
a. Cleaning/poking of Bagasse Screw Feeders, Drum Feeders, chutes, all ash hoppers, and breaking hips inside the boiler furnace in running condition of the boiler with all safety precautions.
b. Inspection and cleaning of air preheater compartments and related jammed / choked tubes, SCAPH, all hoppers, etc., at the time of stoppage of the boiler.
c. Housekeeping and accumulation of ash in and around the boiler/Cogen plant and shifting the same.
d. Any other job related to ash handling inside the plant as directed by the Shift-in-Charge.
e) The above jobs envisage the deployment of 6 labours in each shift
(A, B & C). The contractor may have to increase the number of resources if found inadequate at any point of time, without any extra cost. Payment will be made on a job basis as indicated above. The supervisor will not be counted as labour. | 140 | Days | 6,30,000 ₹6,30,000 | 7,00,000 ₹7,00,000 | 12,60,000 ₹12,60,000 | 6,44,000 ₹6,44,000 | 6,56,600 ₹6,56,600 | 5,88,000 ₹5,88,000 Lowest |
| 1.02 | Shifting of Ash for 110 TPH Boiler at 3500 TCD Sugar Plant Sugauli
Job includes:
a) Collecting boiler ash from the ash discharge silo and shifting it to a bio-compost yard or designated place outside/inside the premises within a distance of around 1.5 km from the boiler.
b) Providing adequate tractors and trolleys, including diesel and lubricants required for operation, with trained drivers and required labour on tractors and trolleys.
c) Accumulating spilled-over ash in and around the plant and shifting the same to the designated place as required, sparing water over the ash to avoid flying. Spillages shall be strictly avoided.
d) Cutting of firewood to the required size for boiler light-up.
e) Work will have to be carried out in 3 shifts (round the clock) for the entire week of 7 days, including Sunday, and holidays. The contractor shall quote lump sum on a per-day basis. Providing adequate tractors and trolleys, including diesel and lubricants required for operation, with trained drivers and required labour on tractors and trolleys. The contractor may have to increase the numbers/resources if they are found inadequate at any point in time, without any extra cost. Payment will be made on a job-by-job basis, as indicated above. | 140 | Days | 4,62,000 ₹4,62,000 | 4,69,140 ₹4,69,140 | 7,00,000 ₹7,00,000 | 4,62,000 ₹4,62,000 | 4,18,600 ₹4,18,600 Lowest | 5,88,000 ₹5,88,000 |
Tender Value
Refer Docs
Closing Date
6 Oct 2025, 3:00 pmClosed
CHIEF MANAGER
PATNA BIHAR
ASH DURING SEASON FOR 110 TPH BOILER AT HBL 3500 TCD INTEGRATED SUGAR PLANT, SUGAULI AND LAURIYA, DISTT. - EAST AND WEST CHAMPARAN, BIHAR
2025_HPCLB_250450_1
HBL/TEN/25-26/185
Limited
Miscellaneous Services
Works
140 days
SUGAULI AND LAURIYA
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
13 Oct 2025
25 Sept 2025
7 Oct 2025
25 Sept 2025
6 Oct 2025
25 Sept 2025
25 Sept 2025 - 5 Oct 2025
PART-A (SUGAULI) Handling of ash during the season for the 110 TPH boiler at HBL’s 3500 TCD integrated sugar plant, Sugauli. Job description given below and attached tender document:
Handling of Ash for 110 TPH Boiler at 3500 TCD Sugar Plant Sugauli. Job includes: a. Cleaning/poking of Bagasse Screw Feeders, Drum Feeders, chutes, all ash hoppers, and breaking hips inside the boiler furnace in running condition of the boiler with all safety precautions. b. Inspection and cleaning of air preheater compartments and related jammed / choked tubes, SCAPH, all hoppers, etc., at the time of stoppage of the boiler. c. Housekeeping and accumulation of ash in and around the boiler/Cogen plant and shifting the same. d. Any other job related to ash handling inside the plant as directed by the Shift-in-Charge. e) The above jobs envisage the deployment of 6 labours in each shift (A, B & C). The contractor may have to increase the number of resources if found inadequate at any point of time, without any extra cost. Payment will be made on a job basis as indicated above. The supervisor will not be counted as labour.
Shifting of Ash for 110 TPH Boiler at 3500 TCD Sugar Plant Sugauli Job includes: a) Collecting boiler ash from the ash discharge silo and shifting it to a bio-compost yard or designated place outside/inside the premises within a distance of around 1.5 km from the boiler. b) Providing adequate tractors and trolleys, including diesel and lubricants required for operation, with trained drivers and required labour on tractors and trolleys. c) Accumulating spilled-over ash in and around the plant and shifting the same to the designated place as required, sparing water over the ash to avoid flying. Spillages shall be strictly avoided. d) Cutting of firewood to the required size for boiler light-up. e) Work will have to be carried out in 3 shifts (round the clock) for the entire week of 7 days, including Sunday, and holidays. The contractor shall quote lump sum on a per-day basis. Providing adequate tractors and trolleys, including diesel and lubricants required for operation, with trained drivers and required labour on tractors and trolleys. The contractor may have to increase the numbers/resources if they are found inadequate at any point in time, without any extra cost. Payment will be made on a job-by-job basis, as indicated above.
Description of Work / Item(s)
PART - B : (LAURIYA) - Handling of ash during the season for the 110 tph boiler at HBL’s 3500 TCD integrated sugar plant, Lauriya, West Champaran, Bihar, Job description given below and attached tender document:
Handling of Ash for 110 TPH Boiler & HBL’s 3500 TCD Sugar Plant at Lauriya Job includes: a) Cleaning/poking of chutes (RAV, Furnace, APH, ESP) during boiler running condition, breaking hips inside the boiler, and feeding ash at the ash belt conveyor with all safety precautions. b) Internal cleaning of the boiler (RAV, Grate, APH, ESP, and ducts) at time of stoppage of the boiler. c) Housekeeping, accumulation of spread ash in and around the Boiler/Cogen plant, and shifting the same. d) Any other job related to ash handling inside the plant as directed by the Shift-in-Charge, including support for boiler operation at the Bagasse Silo sliding gate, the Bagasse drag chain feeder, and the Boiler furnace. e) The above jobs envisage the deployment of 6 labours in each shift (A, B & C). The contractor may have to increase the number of resources if found inadequate at any point of time, without any extra cost. Payment will be made on a job basis as indicated above. The supervisor will not be counted as labour.
Shifting of Ash for 110 TPH Boiler & HBL’s 3500 TCD Sugar Plant at Lauriya Job includes: a) Collecting boiler ash from ash discharge chutes and shifting to Bio-compost yard or designated place outside/inside the premises, including weighment of each loaded tractor-covered trolley (with load and without load) each time within around 1.5 km distance during operation of the boiler. b) Providing adequate tractor-covered trolleys, including diesel, lubricants required for operation, with trained drivers and required labours on tractors and covered trolleys. c) Accumulating spilled-over ash in and around the plant, and shifting the same to the designated place, as required. Spraying water over the ash to avoid flying. Spillages shall be strictly avoided. d) Work will have to be carried out in 3 shifts (Round the clock) for the entire week of 7 days, including Sunday and Holidays. Operations will be in 3 shifts (Round the clock) for the entire week of 7 days, including Sunday and Holidays. Contractor shall quote a lump sum on Per day basis. Providing adequate tractor-covered trolleys, including diesel, lubricants required for operation, with trained drivers and required labours on tractors and covered trolleys. Contractor may have to increase the numbers/resources if found inadequate at any point of time without any extra cost. Payment will be made on job basis as indicated above. The supervisor will not be counted as labour.
SHREE GANPATI ENTERPRISES (BID ID -911653)
M/S Vijay Bahadur Yadav (BID ID -908595)
M/S Shree Bajrang Enterprises (BID ID -911482)
BRIJESH UPADHYAY (BID ID -911340)
nipputiwari (BID ID -910215)
nipputiwari (BID ID -910215)
ANIMESH KUMAR (BID ID -911715)
BRIJESH UPADHYAY (BID ID -911340)
SHREE GANPATI ENTERPRISES (BID ID -911653)
M/S Shree Bajrang Enterprises (BID ID -911482)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .