Loading…
Loading…
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
27 Jul 2026, 6:00 pmDue tomorrow
EXECUTIVE ENGINEER REW DIVISION RAJOURI
OFFICE OF THE EXECUTIVE ENGINEER REW DIV RAJOURI
PLZ REFER BOQ
2026_RDPR_316479_6
e-NIT No. 24 REW Rajouri of 2026-27Dated 17-07-2026(re-tender )
Open Tender
Civil Works
Percentage
90 days
Rajouri
PLZ REFER NIT
2 documents required · 2 mandatory
₹500
Major Treasury head
₹60,000
27 Jul 2026
18 Jul 2026
28 Jul 2026
18 Jul 2026
27 Jul 2026
18 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | 99.45 | Cum | 479.3 | ₹47,666.39 |
| 2 | Filling available exFilling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 39.78 | Cum | 218.4 | ₹8,687.95 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 20.66 | Cum | 4,826.5 | ₹99,715.49 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 55.49 | Cum | 5,733.6 | ₹3,18,157.46 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 8.71 | Cum | 7,788.4 | ₹67,836.96 |
| 6 | Providing and laying Brick work with FPS bricks of class designation 75 in 1:4 mix mortar | 56.47 | Cum | 7,571.6 | ₹4,27,568.25 |
| 7 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 56.47 | Cum | 1,455.65 | ₹82,200.56 |
| 8 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 2.25 | Cum | 9,395.7 | ₹21,140.33 |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 23.24 | Cum | 9,821.85 | ₹2,28,259.79 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columnsCentering and shuttering including strutting, propping etc. and removal of form work. | 249.18 | sqm | 286.35 | ₹71,352.69 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
BOQ_1033943.xls
BOQ • 0.37 MB
corrigendumextension24.pdf
PDF • 0.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].