Tender Value
₹27.7 L
EMD Value
₹28,000
Closing Date
7 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer, Petlad Irrigation Division Petlad
Construction of Asphalt Road on Petlad Branch in between Ch. 48700 to 49400 mt. on I.P. Side.
283776
21 of 2025-26
Open
Miscellaneous Works
Anand
8 documents required · 7 mandatory · 1 optional
₹1,500
Yes
Executive Engineer Petlad Irrigation Division Petlad
₹28,000
Yes
9 Mar 2026
9 Mar 2026
9 Mar 2026
7 Apr 2026
9 Mar 2026
Bill Of Quantities
Name of work :- Construction of Asphalt road on Petlad Branch in between ch. 48700 to
49400 mt. on I.P.Side
Estimated Rate without Total Amount
Estimated Rate without Total Amount
Sr.No Quntity Item Unit
GST Without GST Rs.
In figures In World
Box cutting the road surface to proper Rs. One
slope and camber for making a base of Hundred
road work including removing the Nine & Forty
1 448.00 excavated stuff upto and disposing on CM 109.41 One Paise
the road side as directed 50 mt. in Only
Providing and laying granular sub-base Thousand
Grade-I C.B.R.not less than 30% by Four
providing close graded Hundred
materials,consisting of B.T. crushed
stone aggregates 53 mm to 25 mm @
mm to below @ 30% coarse sand
2 336.00 combination and stone dust/grit CM 1416.09
spreading in uniform layers with motor
grader on prepared surface, mixing by
mix in place method with rotovator at
O.M.C. to required dry density including
filling the depressions which occred
during the process using vibratory roller
8-T to 10-T complete .
Providing, laying, spreading and Rs. One
compacting graded stone aggregate to Thousand
Wet Mix Macadam (WMM) Five Hundred
specification including premixing the Sixty Eight &
material with water at OMC in
mechanical mix plant carriage of mixed
material by tripper to site, laying in
3 543.00 uniform layers with grader in sub base / CM 1568.45
base course on well prepared surface
and compacting with vibratory roller to
achieve the desired density etc.
complete as per MORT&H
Specifcation & Grading as per IRC 109-
Preparing surface by Brushing with Rs. Twenty
wire brushes for removing caked mud Nine &
etc. sweeping with brooms and finally Seventy
fanning the cleaned surface with Three Paise
gunney bags to remove all loose dirt Only
etc.(i) Water bound macadam
Providing & Laying bitumeneous grout Rs. Two
37.50 mm thick using asphal tgrade Thousand
VG-30 at the rate of 1.99 % Two Hundred
i.e.19.90Kg./Mt byweight of mix Ninety Nine &
including heating and mixing in drum Ninety Four
mix plant,transporting the mix and Paise Only
spreading the sameby paver finisher
andconsolidation as per MOST
specification including cost of
allMaterials, fuel, labours, tools and
plants etc. using contractor's owndrum
mix plant etc. complete.(Considering
0.66 cmt/MT qty. for Aggregate.)
Providing, laying and rolling of 25mm Rs. Three
thick VG-30 open graded Thousand
premixbituminous carpet with B.T. Three
aggregate as specified and using Hundred
bitumen VG-10 for tack coat at the Forty Seven
rate of 3.5 kg/ 10sqm on BT .( As per & Eighty Nine
IRC-16)and using bitumen VG-30 for Paise Only
mixing with aggregate at the rate of
3.36% i.e.33.60 Kg/M.T. of total mix
including heating and mixing in drum
mixpant, spreading the same with
6 121.00 paver finisher and consolidation MT 3347.89
withvibratory roller includng necessary
firewood, oil lubricants, labour,charges
etc. using equipment, tool etc
completed in accordance with the
requirement of specification
(Considering 0.66 cmt/MT qty. for
Providing and laying seal coat with Rs. Three
B.T. aggregate as specified using Thousand
aggregate at the rate of 0.66 cum / 1 Three
MT. and bitumen VG-30 for mixing Hundred
with aggregate at the rate of 4.5% i.e. Seventy
45.00 kg/ M.T. of total mixincluding Seven & Sixty
heating and mixing heating and mixing Four Paise
in drum mix plantand spreading the Only
same by paver finisher and
7 101.00 consolidation withvibratory roller MT 3377.64
including necessary using contractor's
own drum mixplant, machineries and
equipment, tools etc. complete in
accordancewith the requirement of
Providing and laying asphalt painting Rs. Forty One
on BT surface with Bitumengrade VG- & Eight Paise
10 at the rate of 5.00Kg / 10 Sqm by Only
Mechanical sprayer and spreading the
stone dust on prepared surface at the
8 2100.00 rate of 0.03 cum / 10 sqm and Rolling SM 41.08
withsmooth wheeled roller and
pneumatic roller and brushing etc
type - A, "W" : Metal Beam Crash Rs. Three
Barrier (Providing and erecting a "W" Thousand
metal beam crash barrier comprising Three
of 3 mm thick corrugated sheet metal Hundred
beam rail, 70 cm above road/ground Twenty One
level, fixed on ISMC series channel Only
vertical post, 150 x 75 x 5 mm spaced
2 m centre to centre, 1.8 m high,
m below ground/road level, all steel
parts and fitments to be galvanised by
9 30.000 hot dip process, all fittings to conform Rm 3321.00
to IS:1367 and IS:1364, metal beam
rail to be fixed on the vertical post with
a spacer of channel section 150 x 75 x
5 mm, 330 mm long complete as per
Total Rs…(Without GST)
Rs. Twenty Seven Lac Seventy Three Thousand Three Hundred Twenty Eight & Twenty Six Paise Only
I / We am / are willing to carry out the work at………………..% above / below precent.
(Should be written in figure and words) of the estimate reates mentioned above.
Amount of my / our tender works out as under.
Estimated amount put Estimated amout put
to tender Rs……………. to tender Rs……………..
Deduct …………..% Add………………%
below Rs………… Above Rs……………
Net Rs……………….. Total Rs…………….
In words…………………………….. In words………………
Notes 1 -The Contractor shall exhibit a board with detailed specification and details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
Notes 2 - The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
Notes 3 - GST and Income tax TDS will be deducted at a source while making payments of bills
Note 4 - In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt.G.R.:PRC-10/2017CementConsumption/16/CDate:11/05/2017asstatedin
S.O.R. there fore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item at the rate of input rate
mentioned in all the tender.
Note 5 - Basic Rate for Cement Difference Calculation of Mix Design will be Rs.5483.37/M.T. (Rate as per
CGWRD SOR 2023-24)
Deputy Executive Engineer Divisional Account Officer
Petlad Irrigation Sub Division Petlad Irrigation Division
Executive Engineer
Petlad Irrigation Division
Bill Of Construction of Asphalt road on Petlad Branch in between ch. 48700 to 49400 mt. on
Quantities I.P.Side
BITUMEN CONSUMPTION
Item Total Bitumen
Sr No. Item Description Quantity Unit consumptio
Providing, laying and rolling of 25mm thick VG-30 open graded
premixbituminous carpet with B.T. aggregate as specified and using
bitumen VG-10 for tack coat at the rate of 3.5 kg/ 10sqm on BT .( As
per IRC-16)and using bitumen VG-30 for mixing with aggregate at
the rate of 3.36% i.e.33.60 Kg/M.T. of total mix including heating and
1 6 mixing in drum mixpant, spreading the same with paver finisher and 121.00 MT 0.03360
consolidation withvibratory roller includng necessary firewood, oil
lubricants, labour,charges etc. using equipment, tool etc completed
in accordance with the requirement of specification (Considering
0.66 cmt/MT qty. for Aggregate.)
Providing and laying seal coat with B.T. aggregate as specified using
aggregate at the rate of 0.66 cum / 1 MT. and bitumen VG-30 for
mixing with aggregate at the rate of 4.5% i.e. 45.00 kg/ M.T. of total
mixincluding heating and mixing heating and mixing in drum mix
2 7 plantand spreading the same by paver finisher and consolidation 101.00 MT 0.045
withvibratory roller including necessary using contractor's own drum
mixplant, machineries and equipment, tools etc. complete in
accordancewith the requirement of specification
Providing and laying asphalt painting on BT surface with
Bitumengrade VG-10 at the rate of 5.00Kg / 10 Sqm by Mechanical
sprayer and spreading the stone dust on prepared surface at the
rate of 0.03 cum / 10 sqm and Rolling withsmooth wheeled roller and
pneumatic roller and brushing etc complete.
BITUMEN CONSUMPTION
Item Total Bitumen
Sr No. Item Description Quantity Unit consumptio
Providing, laying and rolling of 25mm thick VG-30 open graded
premixbituminous carpet with B.T. aggregate as specified and
using bitumen VG-10 for tack coat at the rate of 3.5 kg/ 10sqm
on BT .( As per IRC-16)and using bitumen VG-30 for mixing
with aggregate at the rate of 3.36% i.e.33.60 Kg/M.T. of total
mix including heating and mixing in drum mixpant, spreading 121.00 MT 0.0060865
the same with paver finisher and consolidation withvibratory
roller includng necessary firewood, oil lubricants,
labour,charges etc. using equipment, tool etc completed in
accordance with the requirement of specification (Considering
0.66 cmt/MT qty. for Aggregate.)
Deputy Executive Engineer
Section Officer Petlad Irrigation Sub Division
Manej Section Petlad
Percentage Breakup Calculation
Name of work :- Construction of Asphalt road on Petlad Branch in between ch. 48700 to 49400 mt. on I.P.Side
Quantity Item Rate Unit Total amount Labour Cement Steel per Bitumen PoL Per Machiner Other Total Labour Total Cement Total Steel Total Total PoL Total Total Other TOTAL cost Total Item Cost Total %
Quantity Item Rate Unit Total amount Labour Cement Steel per Bitumen PoL Per Machiner Other Total Labour Total Cement Total Steel Total Total PoL Total Total Other TOTAL cost Total Item Cost Total %
Sr. Estimated but according to Rs. Per Per Unit Unit Per Unit Unit y Per Unit Comodity Cost Cost Cost Bitumen Cost Machinery Comodity Cost per Unit
No. may be more estimated Rs. Unit Per Unit Cost
Box cutting the road surface to proper
slope and camber for making a base of
road work including removing the
road side as directed 50 mt. in lead.
Providing and laying granular sub-base
Grade-I C.B.R.not less than 30% by
providing close graded
materials,consisting of B.T. crushed
stone aggregates 53 mm to 25 mm @
mm to below @ 30% coarse sand
combination and stone dust/grit
spreading in uniform layers with motor
mix in place method with rotovator at
O.M.C. to required dry density including
filling the depressions which occred
during the process using vibratory roller
8-T to 10-T complete .
Providing, laying, spreading and
compacting graded stone aggregate to
Wet Mix Macadam (WMM) specification
including premixing the material with
water at OMC in mechanical mix plant
carriage of mixed material by tripper to
site, laying in uniform layers with grader
in sub base / base course on well
prepared surface and compacting with
vibratory roller to achieve the desired
density etc. complete as per MORT&H
Specifcation & Grading as per IRC 109-
Preparing surface by Brushing with wire
brushes for removing caked mud etc.
sweeping with brooms and finally fanning
the cleaned surface with gunney bags to
remove all loose dirt etc.(i) Water bound
macadam surface (New)
Providing & Laying bitumeneous grout
37.50 mm thick using asphal tgrade VG-
30 at the rate of 1.99 % i.e.19.90Kg./Mt
byweight of mix including heating and
mixing in drum mix plant,transporting
the mix and spreading the sameby paver
finisher andconsolidation as per MOST
specification including cost of
allMaterials, fuel, labours, tools and
plants etc. using contractor's owndrum
mix plant etc. complete.(Considering
cmt/MT qty. for Aggregate.)
Percentage Breakup Calculation
Name of work :- Construction of Asphalt road on Petlad Branch in between ch. 48700 to 49400 mt. on I.P.Side
Quantity Item Rate Unit Total amount Labour Cement Steel per Bitumen PoL Per Machiner Other Total Labour Total Cement Total Steel Total Total PoL Total Total Other TOTAL cost Total Item Cost Total %
Quantity Item Rate Unit Total amount Labour Cement Steel per Bitumen PoL Per Machiner Other Total Labour Total Cement Total Steel Total Total PoL Total Total Other TOTAL cost Total Item Cost Total %
Sr. Estimated but according to Rs. Per Per Unit Unit Per Unit Unit y Per Unit Comodity Cost Cost Cost Bitumen Cost Machinery Comodity Cost per Unit
No. may be more estimated Rs. Unit Per Unit Cost
Providing, laying and rolling of 25mm
thick VG-30 open graded
premixbituminous carpet with B.T.
aggregate as specified and using bitumen
VG-10 for tack coat at the rate of 3.5 kg/
10sqm on BT .( As per IRC-16)and using
bitumen VG-30 for mixing with aggregate
at the rate of 3.36% i.e.33.60 Kg/M.T. of
total mix including heating and mixing in
drum mixpant, spreading the same with
paver finisher and consolidation
withvibratory roller includng necessary
firewood, oil lubricants, labour,charges
etc. using equipment, tool etc completed
in accordance with the requirement of
specification (Considering 0.66 cmt/MT
qty. for Aggregate.)
Providing and laying seal coat with B.T.
aggregate as specified using aggregate at
the rate of 0.66 cum / 1 MT. and
bitumen VG-30 for mixing with aggregate
at the rate of 4.5% i.e. 45.00 kg/ M.T. of
total mixincluding heating and mixing
heating and mixing in drum mix plantand
spreading the same by paver finisher and
including necessary using contractor's
own drum mixplant, machineries and
equipment, tools etc. complete in
accordancewith the requirement of
Providing and laying asphalt painting on
BT surface with Bitumengrade VG-10 at
the rate of 5.00Kg / 10 Sqm by
Mechanical sprayer and spreading the
stone dust on prepared surface at the
withsmooth wheeled roller and
pneumatic roller and brushing etc
type - A, "W" : Metal Beam Crash Barrier
(Providing and erecting a "W" metal beam
crash barrier comprising of 3 mm thick
corrugated sheet metal beam rail, 70 cm
above road/ground level, fixed on ISMC
series channel vertical post, 150 x 75 x
mm spaced 2 m centre to centre, 1.8 m
high, 1.1 m below ground/road level, all
steel parts and fitments to be galvanised
to IS:1367 and IS:1364, metal beam rail
to be fixed on the vertical post with a
spacer of channel section 150 x 75 x
mm, 330 mm long complete as per clause
Signature of Contractor Deputy Executive Engineer Executive Engineer
Petlad Irrigation sub Division Petlad Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Notice 21 of 2025-26 online.pdf
1.page.pdf
3.Notice Inviting Tender.pdf
4.SBD.pdf
Forwadding.pdf
Itemwise Specification.pdf
material Specification.pdf
schedule B.pdf
Download all tender documents and submit your bid