| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.8 LAccepted-AOC | ₹31.8 L | L1 | Accepted-AOC Lowest bidder |
| 2 | L2₹34.8 LRejected-Finance | ₹34.8 L | L2 | Rejected-Finance Other than lowest |
| 3 | L3₹34.9 LRejected-Finance NEAR CIVIL HOSPITAL WARD NO 07 VPO CHOWARI DISTT CHAMBA HP 176302 | CHOWARI | CHAMBA | HP | 176302 | ₹34.9 L | L3 | Rejected-Finance Other than lowest |
| 4 | L4₹36.9 LRejected-Finance 202 VIDYA NAGAR BEHIND SANJAY GANDHI MEMORIAL COLLEGE KAMRE RANCHI JHARKHAND 835222 | RANCHI | JHARKHAND | 835222 | ₹36.9 L | L4 | Rejected-Finance Other than lowest |
| 5 | L5₹37.8 LRejected-Finance | ₹37.8 L | L5 | Rejected-Finance Other than lowest |
| Sl No | Description | Qty | Unit | m/S Varun Gupta L3 | BHARDWAJ BUILDERS L5 | M/s ASS Construction Co L2 | M/s Gobind Construction Company L1 | M/s R S Construction L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Rough excavation not exceeding 1.5m deep and getting out in any type of soil complete all as specified and directed. | 223 | Cum | 150 ₹33,450 | 300 ₹66,900 | 80 ₹17,840 | 120 ₹26,760 | 120 ₹26,760 |
| 2.00 | Excavation over areas not exc 1.5m deep and getting out in any type of soil complete all as specified and directed. | 244.25 | Cum | 280 ₹68,390 | 300 ₹73,275 | 80 ₹19,540 | 140 ₹34,195 | 120 ₹29,310 |
| 3.00 | M&L PCC 1:3:6 type C-2 using 40mm graded crushed stone aggregate as in foundation filling and mass concrete complete all as specified and directed. | 15 | Cum | 5,200 ₹78,000 | 6,000 ₹90,000 | 80 ₹1,200 | 3,800 ₹57,000 | 120 ₹1,800 |
| 4.00 | Returning, filling in (soil ) including spreading, levelling, watering and well ramming in layers not exc 25cm in any type of soil complete all as specified and directed. | 232.68 | Cum | 155 ₹36,065.40 | 300 ₹69,804 | 80 ₹18,614.40 | 70 ₹16,287.60 | 120 ₹27,921.60 |
| 5.00 | M&L RCC M-25 Design mix as in foundations, including rafts, footings, foundation beams; plinth beams; base of columns, etc.; basement slabs, under-reamed piles and mass concrete complete all as specified and directed. | 49 | Cum | 7,800 ₹3.8 L | 8,000 ₹3.9 L | 8,600 ₹4.2 L | 8,500 ₹4.2 L | 9,200 ₹4.5 L |
| 6.00 | M&L RCC M-25 Design mix as in walls, retaining walls, basement walls, ballast walls and the like; any thickness; above top of footings; including attached pilasters and buttresses complete all as specified and directed. | 91 | Cum | 8,000 ₹7.3 L | 8,000 ₹7.3 L | 9,000 ₹8.2 L | 8,500 ₹7.7 L | 9,200 ₹8.4 L |
| 7.00 | Use and waste form work flat, rough finished surface to side of concrete foundation, footing, plinth beam and similar work vertical or batter complete all as specified and directed. | 45 | Sqm | 200 ₹9,000 | 300 ₹13,500 | 100 ₹4,500 | 200 ₹9,000 | 200 ₹9,000 |
| 8.00 | Use and waste form work flat, rough finished surface of walls, retaining wall, abutments, parapets etc vertical or batter complete all as specified and directed. | 495 | Sqm | 325 ₹1.6 L | 300 ₹1.5 L | 180 ₹89,100 | 200 ₹99,000 | 200 ₹99,000 |
| 9.00 | S&F mild steel TMT bars 10mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips complete all as specified and directed. | 7,944 | Kg | 110 ₹8.7 L | 100 ₹7.9 L | 100 ₹7.9 L | 97 ₹7.7 L | 96 ₹7.6 L |
| 10.00 | Hand packing (any thickness) using broken stone or boulders at back of walls over arches etc and raising (or lowering) to the required level complete all as specified and directed. | 3.4 | Cum | 1,000 ₹3,400 | 3,000 ₹10,200 | 80 ₹272 | 1,500 ₹5,100 | 200 ₹680 |
Updated dates
Tender Value
Refer Docs
EMD Value
₹80,000
Closing Date
27 Apr 2026, 6:00 pmClosed
Aayush Kumar Singh
Holta cantt Palampur
PROVN OF RETAINING WALL L 50 MTRS FOR SAFETY OF BLDGS AND PROVN OF RETAINING WALL L 30 MTRS NEAR POWER HOUSE AT PALAMPUR
2026_MES_758460_1
gep-45/2025-26
Open Tender
Civil Works
180 days
Palampur Mil Stn
As per tender documents
8 documents required · 8 mandatory
₹500
GE Palampur
₹80,000
4 Jun 2026
30 Mar 2026
2 May 2026
30 Mar 2026
27 Apr 2026
13 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Rough excavation not exceeding 1.5m deep and getting out in any type of soil complete all as specified and directed. | |||||
| 2Excavation over areas not exc 1.5m deep and getting out in any type of soil complete all as specified and directed. | |||||
| 3M&L PCC 1:3:6 type C-2 using 40mm graded crushed stone aggregate as in foundation filling and mass concrete complete all as specified and directed. | |||||
| 4Returning, filling in (soil ) including spreading, levelling, watering and well ramming in layers not exc 25cm in any type of soil complete all as specified and directed. | |||||
| 5M&L RCC M-25 Design mix as in foundations, including rafts, footings, foundation beams; plinth beams; base of columns, etc.; basement slabs, under-reamed piles and mass concrete complete all as specified and directed. | |||||
| 6M&L RCC M-25 Design mix as in walls, retaining walls, basement walls, ballast walls and the like; any thickness; above top of footings; including attached pilasters and buttresses complete all as specified and directed. | |||||
| 7Use and waste form work flat, rough finished surface to side of concrete foundation, footing, plinth beam and similar work vertical or batter complete all as specified and directed. | |||||
| 8Use and waste form work flat, rough finished surface of walls, retaining wall, abutments, parapets etc vertical or batter complete all as specified and directed. | |||||
| 9S&F mild steel TMT bars 10mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips complete all as specified and directed. | |||||
| 10Hand packing (any thickness) using broken stone or boulders at back of walls over arches etc and raising (or lowering) to the required level complete all as specified and directed. | |||||
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
td.pdf
Tender Documents • 1.18 MB
BOQ_849532.xls
BOQ • 0.56 MB
Download all tender documents and submit your bid