The Chief Officer, Umreth Municipality, Umreth
BID DOCUMENTS FOR CONSTRUCTION WORK OF DRAINAGE CHAMBER AT BUS STAND AREA NEAR OLD DEVNARAYAN ICE-CREAM AT UMRETH UNDER 15 PERCENT VIVEKADHIN YOJANA YEAR:2026-27.
345339
Vikendrit/2026-27
Open
Civil Works
Works
Anand
13 documents required · 13 mandatory
₹1,062
The Chief Officer, Umreth Municipality, Umreth
₹16,900
16 Sept 2026
16 Sept 2026
16 Sept 2026
1 Oct 2026
16 Sept 2026
Item Qty. Description Total Unit Amount
1 75.00 Excavation for foundation upto 1.5 m depth including sorting out
Cmt. and stacking of useful materials and disposing off the excavated
stuff upto 50 Meter lead.(A) Loose or soft soil
2 75.00 Excavation for foundation for depth from 1.5 m to 3.0 m including
Cmt. sorting out and stacking of useful materials and disposing off the
excavated stuff upto 50 Meter lead.(A) Loose or soft soil
3 45.00 Excavation for foundation for depth from 3.0 m to 5.0 m including
Cmt. sorting out and stacking of useful materials and disposing off the
excavated stuff upto 50 Meter lead.(A) Loose or soft soil
4 15.00 Providing and filling rubbles including hand packing and filling
Cmt. interstices with quarry spalls behind abutments and between
returns as directed. ( upto 10 ton) 1094.11 Cmt.
5 14.50 Providing and laying cement concrete 1:3:6 (1-Cement : 3- coarse
Cmt. sand : 6- hand broken stone aggregates 40 mmnominal size) and
curing complete excluding cost of formwork in (A) Foundation and
Plinth 3077.07 Cmt.
6 Providing and laying controlled cement concrete M.250 and curing
complete excluding the cost of formwork and reinforcement for
reinforced concrete work in.
a 35.50 -- do -- for R.C.C. Wall 6330.68 Cmt.
b 3.00 -- do -- for R.C.C. Beam 6455.92 Cmt.
c 17.50 -- do -- for R.C.C. Base Slab 4503.59 Cmt.
SBD SECTION-7 BILL OF QUANTITIES-176
d 15.00 -- do -- for R.C.C. Slab 5744.88 Cmt.
7 7100.00 Providing T.M.T. Bar Fe 500D reinforcement for R.C.C.work
Kgs. including bending, Binding and placing in position complete upto
floor two level.(upto 10 ton) 77.29 Kg.
8 240.50 Providing 10mm. Thick cement plaster in single coat on
brick/concrete walls for interior plastering upto floor two level and
Smt. finished even and smooth in C. M. 1:3 (1 Cement, 3 Sand)
including finishing with a floating coat of neat cement slurry.
9 240.50 White washing with lime on wall surfaces (three coats) to give an
Smt even shade including thoroughly brooming the surface to remove
all dirt, dust, mortar drops and other foreign matter.
10 67.50 Filling available excavated earth (excluding rock) in trenches
Cmt. plinth, sides of foundations etc. in layers not exceeding 20 cm in
depth consolidating each disposited layer by ramming and
11 3.50 Providing and casting in situ ordinarycement concrete M-200 for
Cmt. average 75 mm thick wearing coat laid as directed including
tamping ,vibrating, finishing, curing and filling in joints with bitumen
12 309.60 Providing and fixing M.S. grills of required pattern to wooden
Kgs. frames of windows etc. with M.S. flats at required spacings and
frame alround, square or round bars with round headed bolts and
nuts or by screws (A) Plain Grill.
13 15.50 Painting two coats (including priming coat) on new steel and other
Smt metal surface with enamel paint, brushing, interior to give an even
shade including cleaning the surface an even shade including
cleanicn the surface of all dirt, dust and other foreign matter.
SBD SECTION-7 BILL OF QUANTITIES-177
14 Providing and Supplying ISI Standard R.C.C pipes (of Sulphate
Resisting Cement) In Standard length of following class and
diameter suitable for either collar joints or rubber ring joints
including all taxes, Insurance , transportation , freight charges
Octroi , Inspection Charges loading unloading , conveyance to
department stores stacking etc.
Class NP3 Test Pressure 0.7 Kg/Sq.cm
15 Lowering, laying and jointing R.C.C. pipes in C.M 1:1 1/2of
following in proper position ,grade and alignment as directed by
Engineer in charge including conveyence from stores to site work,
labour,giving hydraulic testing as per ISI code etc complete.
16 101.30 Excavation for pipe line trenches for water supply, sewerage line,
Cmt. manhole etc. all with shoring and struting if required as per
required gradient and line including safety provisions using site
rails and stacking excavated stuff including up to all required lead
cleaning the site etc. complete for all lifts and strata as specified.
In all sort of soil and soft murrum.
Excavation upto 1.5 mt. Depth-(a)
17 70.50 Reffiling the Pipe line Trenches incluidng ramming, watering,
Cmt. consolidating disposal of surplus stuff as directed within a radius of
SBD SECTION-7 BILL OF QUANTITIES-178
18 1.00 Dismantling the existing manhole (depth up to 3.00 m) by breaking
Job the masonry/concrete structure, removal of cover and frame,
including necessary dewatering, disposal of all dismantled
materials and debris to an approved disposal location, and making
necessary arrangements for reconnecting the existing sewer/drain
line to the new manhole or system, all as directed by the Engineer-
in-Charge, complete. 50500.00 Job
Add : 18% for GST Rs.
Add : 1% for Quality Control Charges Rs.
Add : 2% for Contingencies Charges Rs.
I / We am/are willing to carry out the work at _____________ % above / below (percent should be written in figure and in
words) of the estimated rates mentioned above. Amount of my/our tender works out as under.
( In words ) __________________________________________ Percentage above / below the estimated rate.
Estimated Amount put to tender Rs.
Deduct _______ % below Rs. Rs.
Estimated Amount put to tender Rs.
Add _______ % above Rs. Rs.
Total Amount Rs.
Total Amount Rs.
*( Please strike out whichever is not applicable)
Note :1 All work shall be carried out as per Public Works Department Hand Book and other specifications of
Division or as directed.
Note :2 Rates quoted include clearance of site (prior commencement of work and its close) in all respects and
hold good for work under.
Note :3 I/ We have read the conditions mentioned in this tender and agree to abide by the same.
Seal & Signature of Contractor President Chief Officer
Umerth Nagarpalika Umerth Nagarpalika
SBD SECTION-7 BILL OF QUANTITIES-179
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD.pdf
Notes.pdf
Special Conditions.pdf
BOQ.pdf
OTHER IMPORTANT-1.pdf
OTHER IMPORTANT-2.pdf
OTHER IMPORTANT-3.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .