| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.0 CrAccepted-AOC | ₹3.0 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹3.3 Cr+₹34.4 L (11.5%)Rejected-AOC | ₹3.3 Cr+₹34.4 L (11.5%) | 2 | Rejected-AOC L2 |
| 3 | 3₹3.3 Cr+₹35.0 L (11.7%)Rejected-AOC | ₹3.3 Cr+₹35.0 L (11.7%) | 3 | Rejected-AOC L3 |
| 4 | 4₹3.3 Cr+₹35.4 L (11.8%)Rejected-AOC 4TH FLOOR B K MARKET BACK SIDE PREMISES NO 16 B SHAKESPEARE SARANI KOLKATA 700071 | KOLKATA | KOLKATA | WEST BENGAL | 700071 | ₹3.3 Cr+₹35.4 L (11.8%) | 4 | Rejected-AOC L4 |
| 5 | 5₹3.4 Cr+₹36.0 L (12.1%)Rejected-AOC 3RD FLOOR INDICON VIVA 53A LEELA ROY SARANI GARIAHAT ROAD KOLKATA WEST BENGAL 700019 | KOLKATA | WEST BENGAL | 700019 | ₹3.4 Cr+₹36.0 L (12.1%) | 5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | GREENVIEW DEALTRADE PRIVATE LIMITED | R K TRANSPORT PRIVATE LIMITED | NEW COALFIELD CARRIERS | Bishnu Transport Co | NKAS Services Private Limited | RA Mining Private Limited | M/S UPENDRA PRASAD AND BROTHERS | M/s United Coal Carriers |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Evacuation of ash from ash pond of TTPS up to all possible lift and including dewatering as required, loading by pay loaders / excavators, washing the outside of dumpers/trucks as per specification on approved route and unloading at disposal site as directed by Engineer-in-charge. The rate includes cost of sprinkling of water at the excavation site, haulage route and disposal site, dozing of ash by dozers, compaction of ash by vibro-rollers and levelling the ground at disposal site to avoid floating & rain cuts on disposed ash heaps as per procedure mentioned in scope of work of the NIT, as per direction of EIC and specification in conformity with pollution control norms, and status and repairing of road in route.The different slabs/leads for above work are as given below: | |||||||||||
| 1.01 | Lead 3KM to 4 KM | 70,200 | MT | 94,77,000 ₹94,77,000 | 92,09,538 ₹92,09,538 Lowest | 98,98,200 ₹98,98,200 | 97,57,800 ₹97,57,800 | 97,57,800 ₹97,57,800 | 97,57,800 ₹97,57,800 | 98,28,000 ₹98,28,000 | 96,53,202 ₹96,53,202 |
| 1.02 | Lead 4KM to 5 KM | 70,200 | MT | 1,01,08,800 ₹1,01,08,800 | 99,40,320 ₹99,40,320 Lowest | 1,04,59,800 ₹1,04,59,800 | 1,05,30,000 ₹1,05,30,000 | 1,04,59,800 ₹1,04,59,800 | 1,04,59,800 ₹1,04,59,800 | 1,05,30,000 ₹1,05,30,000 | 1,04,25,402 ₹1,04,25,402 |
| 1.03 | Lead 5KM to 6 KM | 81,000 | MT | 1,53,09,000 ₹1,53,09,000 | 1,24,52,940 ₹1,24,52,940 Lowest | 1,53,90,000 ₹1,53,90,000 | 1,43,37,000 ₹1,43,37,000 | 1,53,49,500 ₹1,53,49,500 | 1,53,49,500 ₹1,53,49,500 | 1,53,90,000 ₹1,53,90,000 | 1,42,16,310 ₹1,42,16,310 |
| 2.00 | Excavation of earth/soil and carriage by truck/dumper and spreading this over defined ash disposal area to make a 300 mm compressed soil blanket on the ash evacuated from ash pond of TTPS to make ash dumping area nuisance free.
The rate includes cost of sprinkling of water at haulage route and disposal site, dozing of soil by dozers, compaction of soil by vibro-rollers & levelling the ground at the disposal site to avoid floating &rain cuts on disposed ash heaps as per procedure mentioned in scope of work of the NIT, as per direction of EI and specification in conformity with pollution control norms and repairing of road in route. The procedure of filling & compaction of ash shall be followed as per IS-2720(PART-vii&ii). The soil shall be spread uniformly by mean of earth moving equipments like dozers, spreaders etc. of appropriate size commensurate to the working site size/configuration. Uniform spreading is to be done in the layers of 300(+,-)50 mm loose thickness in the entire area or in the strips of about 15 meters width whichever is less. The length of each strips may also be restricted maximum up to 150 meters. The compaction shall be done with vibratory rollers up to maximum dry density of 95-100% Proctors density. Frequency of test shall be at every 100-150 m length. The lead for above work is up to 1KM | 16,605 | M3 | 22,41,675 ₹22,41,675 | 22,62,099.15 ₹22,62,099.15 | 21,91,860 ₹21,91,860 | 21,08,835 ₹21,08,835 | 21,50,347.5 ₹21,50,347.5 | 21,50,347.5 ₹21,50,347.5 | 21,58,650 ₹21,58,650 | 20,84,093.55 ₹20,84,093.55 Lowest |
Tender Value
₹2.9 Cr
EMD Value
₹5.7 L
Closing Date
11 Apr 2025, 4:00 pmClosed
ESE F/A/Civil
T.V.N.L.,ABD Area, Smart City, Dhurwa,Ranchi
e-Tender with reverse auction is invited for the work of evacuation of ash from Ash Pond of TTPS, its nuisance-free transportation and disposal in defined areas provided by the Plant
2025_TVNL_99637_1
38/CIVIL/W/TVNL/RAN/2024-25
Open Tender
Miscellaneous Services
Tender cum Auction
180 days
TTPS, LALPANIA
Please refer Tender documents.
2 documents required · 2 mandatory
₹17,700
₹5.7 L
Yes
29 Sept 2025
20 Mar 2025
12 Apr 2025
20 Mar 2025
11 Apr 2025
20 Mar 2025
Evacuation of ash from ash pond of TTPS up to all possible lift and including dewatering as required, loading by pay loaders / excavators, washing the outside of dumpers/trucks as per specification on approved route and unloading at disposal site as directed by Engineer-in-charge. The rate includes cost of sprinkling of water at the excavation site, haulage route and disposal site, dozing of ash by dozers, compaction of ash by vibro-rollers and levelling the ground at disposal site to avoid floating & rain cuts on disposed ash heaps as per procedure mentioned in scope of work of the NIT, as per direction of EIC and specification in conformity with pollution control norms, and status and repairing of road in route.The different slabs/leads for above work are as given below:
Lead 3KM to 4 KM
Lead 4KM to 5 KM
Lead 5KM to 6 KM
Excavation of earth/soil and carriage by truck/dumper and spreading this over defined ash disposal area to make a 300 mm compressed soil blanket on the ash evacuated from ash pond of TTPS to make ash dumping area nuisance free. The rate includes cost of sprinkling of water at haulage route and disposal site, dozing of soil by dozers, compaction of soil by vibro-rollers & levelling the ground at the disposal site to avoid floating &rain cuts on disposed ash heaps as per procedure mentioned in scope of work of the NIT, as per direction of EI and specification in conformity with pollution control norms and repairing of road in route. The procedure of filling & compaction of ash shall be followed as per IS-2720(PART-vii&ii). The soil shall be spread uniformly by mean of earth moving equipments like dozers, spreaders etc. of appropriate size commensurate to the working site size/configuration. Uniform spreading is to be done in the layers of 300(+,-)50 mm loose thickness in the entire area or in the strips of about 15 meters width whichever is less. The length of each strips may also be restricted maximum up to 150 meters. The compaction shall be done with vibratory rollers up to maximum dry density of 95-100% Proctors density. Frequency of test shall be at every 100-150 m length. The lead for above work is up to 1KM
M/s United Coal Carriers
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .