Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹51.3 LAccepted-AOC | L1 | Accepted-AOC Lowest bid. | |
| 2 | L2₹54.8 L+₹3.5 L (6.74%)Rejected-AOC 95 A GOVIND NAGAR RACE COURSE OPP GURUDWARA DEHRADUN UK PIN 248001 | DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | L2 | Rejected-AOC Other than lowest. | |
| 3 | L3₹57.3 L+₹6.0 L (11.6%)Rejected-AOC 362 SUBHASH NAGAR PO CLEMENT TOWN DEHRADUN UTTARAKHAND | L3 | Rejected-AOC Other than lowest. | |
| 4 | L4₹57.8 L+₹6.4 L (12.5%)Rejected-AOC A 29 SAMRAT PALACE GARH ROAD MEERUT UP 250001 | MEERUT | UTTAR PRADESH | 250001 | L4 | Rejected-AOC Other than lowest. | |
| 5 | L5₹61.0 L+₹9.6 L (18.7%)Rejected-AOC 11 167 JMI COLONY SHAKTINAGAR DISTT SONEBHADRA UP | SHAKTINAGAR | SONEBHADRA | UTTAR PRADESH | 231222 | L5 | Rejected-AOC Other than lowest. |
Tender Value
₹78 L
EMD Value
₹1.4 L
Closing Date
7 Sept 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE HILLS DEHRADUN
Headquarters Commander Works Engineers (Hills) Military Engineer Services, Mall Road, Dehradun Cantt
PERIODICAL SERVICES TO MD ACCN OTM ACCN UNDER GE CLEMENT TOWN DEHRADUN
2022_MES_543608_1
85372/CLT/E8
Open Tender
Civil Works
Item Rate
180 days
GE Clement Town
Class C Cat a i
8 documents required · 8 mandatory
₹1,000
GE Clement Town
₹1.4 L
Yes
22 Oct 2022
5 Aug 2022
14 Sept 2022
5 Aug 2022
7 Sept 2022
26 Aug 2022
5 Aug 2022 - 12 Aug 2022
Amount
M&L for preparation of old surface on ceiling including brooming down or steel wire brushing scraping down smoke soot, moulds, moss and efflorescent salts and treating oil and greasy spots making the surface even and smooth and applying one coat of white wash on old decorated surfaces complete all as specified and as directed by Engr-in-Charge.
M&L for preparation of old surface of wall including brooming down or steel wire brushing scraping down smoke soot, moulds, moss and efflorescent salts and treating oil and greasy spots making the surface even and smooth and applying one coat of white wash on old decorated surfaces complete all as specified and as directed by Engr-in-Charge.
M&L for preparation of old surface of wall , kerb stone including brooming down or steel wire brushing scraping down smoke soot, moulds, moss and efflorescent salts and treating oil and greasy spots making the surface even and smooth and applying one coat of cement base paint on old decorated surfaces complete all as specified and as directed by Engr-in-Charge.
M&L for preparation of old surface on ceiling including brooming down or steel wire brushing scraping down smoke soot, moulds, moss and efflorescent salts and treating oil and greasy spots making the surface even and smooth and applying one coat of acrylic distemper on old decorated surfaces complete all as specified and as directed by Engr-in-Charge.
M&L for preparation of old decorated distempered surfaces on internal walls including brooming down or steel wire brushing scraping down smoke soot, moulds, moss and efflorescent salts and treating oil and greasy spots and making the surface smooth by rubbing with sand paper and applying one coat of acrylic distemper (oil emulsion) using rollers of approved tint and make all as specified and directed by Engr-in-Charge.
M&L for preparation of old decorated surface of internal wall by removing existing treatment with mechanical sander (rpm 1500-2700) along with internal dust extraction system for clean environment certified by reputed paint manufacturers and applying two coats of acrylic distemper using roller over a layer of wall care putty to make the surface smooth all as specified and prescribed by manufacturer of paint and all as directed at site by Engr-in-Charge. Note:- (i) The old surface must be prepared in a manner so that there should not be any impression of dent and it should be made even and smooth all as per manufacture’s instruction before application of distemper. The cost of materials, labour & T&P required for preparation of surface are deemed to be included in the rates quoted. (ii). The work must be got executed through authorised applicator of manufacture after concluding an MoU with manufacture for company back guarantee by the contractor. The authorised applicator of manufacturer shall be got approved from GE before commencement of work. (iii). All the material to be incorporated in the work shall be brought by contractor to MES store yard which will be subsequently issued by department for incorporation in the work to ensure the quantity to be consumed all as per recommendation of manufacture. (iv). After carrying out preparation of surface the same shall be got approved from GE before application of distemper for each building. (v). The colour / shade will be all as approved by GE.
M&L for preparation of old decorated surface of exterior wall by removing existing treatment with mechanical sander (rpm 1500-2700) along with dust extraction system for clean environment certified by reputed paint manufacturers, then washing the surface with Bleaching powder solution for treatment of fungal growth and applying two coats of exterior anti fungal acrylic emulsion paint (wallmista of Berger paint or equitant in Asian paint, Nerolac etc having three years of performance warranty) over a coat of exterior water based primer of same incl making the surface smooth using exterior cement based wall care putty all as specified and prescribed by manufacture of paint and as directed at site by Engineer-in-Charge. Note:- (i) The old surface must be prepared in a manner so that there should not be any impression of dent and it should be made even all as per manufacture instruction before application of distemper. The cost of materials, labour & T&P required for preparation of surface are demand to be included in the rates quoted. (ii). The work must be got executed through authorised applicator of manufacture after concluding an MoU with manufacture for company back guarantee by the contractor. The authorised applicator of manufacturer shall be got approved from GE before commencement of work. (iii). All the material to be incorporated in the work shall be brought by contractor to MES store yard which will be subsequently issued by department for incorporation in the work to ensure the quantity to be consumed all as per recommendation of manufacture. (iv). After carrying out preparation of surface the same shall be got approved from GE before application of distemper for each building. (v). The colour / shade will be all as approved by GE. (vi) The cost of Scaffolding wherever required are deemed to be included in the rates quoted by the contractor.
Demolition of cement concrete (un-reinforced) of any description and in any position not otherwise specially provided and including removing unserviceable material,outside of A 1 defence land complete all as specified and directed.
Demolition of cement concrete (reinforced) of any position not otherwise specifically provided for and including reinforcement required to facilitate demolition upto and including on the roof top/mumty/parapet/RCC chajjas/stair/RCC water tank and removing unserviceable material,outside of A 1 defence land complete all as specified and directed.
M&L for PCC 1:2:4 type B-0 using 12.5 mm graded stone aggregate, as in padding, roof kerb or mud stops,round or chamfered on edges coping portion rounded chamfered on edge on roof chajjas finished even and smooth complete directed by Engr-in-Charge.
Taking down cement plaster, in any thickness from brick or stone walls,/facia of roof Chajjas,roof projection,ceiling etc including raking out joints, hacking for key, scrubbing down with water etc and removing unserviceable material,outside of A 1 defence land complete all as specified and directed.
Chipping of unsound /weak concrete materials including cover plaster from RCC structural member i.e. , beams, columns ,lintel,chajja, fin , facia etc. of any thickness including tapering all edges,cleaning of exposed concrete surface applying a layer of thick cement slurry and M&L 20 mm thick plaster in cement plaster in two layers ( first dubbing layer 15 mm thick in cement mortar 1:4 and after drying a 5 mm thick cement plaster in CM 1:3 finishing the edges, corner etc even and smooth w/o using extra cement complete all as specified and as directed by Engr-in-Charge.
M&L for Rendering 15 mm thick cement plaster on concrete,stone surfaces, brick walls/facia of roof Chajjas,roof projection in two layer first layer of 10 mm in CM 1:4 & 2nd layer of 5mm in CM 1:4 mixed with integral water proofing compound finished to even & smooth w/o using extra cement. Note :- Integral water proofing liquid will be measured and paid seperately.
Supply only water proofing compound liquid ISI marked as approved by GE . Complete all as specified and directed by Engineer in Charge . .
M&L for Rendering 15 mm thick on fair faces of brick work or concrete walls internal surfaces in CM 1:6 finished to even & fair without using extra cement.Complete all as specified and directed by Engineer in Charge .
M&Lfor rendering 5 mm thick in CM 1:3 in ceiling / Chhajja's finished even and smooth (without using extra cement). Complete all as specified and directed
M&L for preparation of newly plastered surface of external wall and applying two coat of cement base paint complete all as specified and as directed by Engr-in-Charge. Note :- The newly plastered surface must be prepared in a manner so that there should not be any impression of dent and it should be made even and smooth all as per satifaction of Engr-in-Charge.The cost of all materials, T&P and labour required for preparation of surface are deemed to be included in the rates quoted.
M&L for white washing three coats on ceiling incl preparation of newly plastered surfaces. complete all as specified and directed by Engr In Charge. Note :- The newly plastered surface must be prepared in a manner so that there should not be any impression of dent and it should be made even and smooth all as per satifaction of Engr-in-Charge.The cost of all materials, T&P and labour required for preparation of surface are deemed to be included in the rates quoted.
M&L for white washing three coats on wall incl preparation of newly plastered surfaces.complete all as specified and directed by Engr In Charge. Note :- The newly plastered surface must be prepared in a manner so that there should not be any impression of dent and it should be made even and smooth all as per satifaction of Engr-in-Charge.The cost of all materials, T&P and labour required for preparation of surface are deemed to be included in the rates quoted.
M&L for preparation of newly plastered surface of external wall all as prescribed by manufacture of paint and applying two coats of exterior anti fungal acrylic emulsion paint (walmista of Berger paint or equitant in Asian paint, Nerolac etc having three years of performance warranty) over a coat of exterior water based primer of same make all as specified and prescribed by manufacture of paint and as directed at site by Engineer-in-Charge. Note:- 1. The newly plastered surface must be prepared in a manner so that there should not be any impression of dent and it should be made even all as per manufacture instruction before application of emulsion paint. The cost of all materials, T&P and labour required for preparation of surface are deemed to be included in the rates quoted. (ii). The work must be got executed through authorised applicator of manufacture after concluding an MoU with manufacture for company back guarantee by the contractor. The authorised applicator of manufacturer shall be got approved from GE before commencement of work. (iii). All the material to be incorporated in the work shall be brought by contractor to MES store yard which will be subsequently issued by deportment for incorporation in the work to ensure the quantity to be consumed all as per recommendation of manufacture. (iv). after carrying out preparation of surface the same shall be got approved from GE before application of distemper for each building. (v). The colour / shade will be all as approved by GE (vi) The cost of Scaffolding wherever required are deemed to be included in the rates quoted by the contractor.
M&L for preparation of newly plastered surface of internal wall by application of wall care putty to remove the dent and to make the surface even and smooth by grinding or rubbing with sand paper and applying two coats of acrylic distemper over a coat of primer using roller all as specified and prescribed by manufacture of paint and as directed at site by Engineer-in-Charge. Note :- The newly plastered surface must be prepared in a manner so that there should not be any impression of dent and it should be made even and smooth all as per satifaction of Engr-in-Charge.The cost of all materials, T&P and labour required for preparation of surface are deemed to be included in the rates quoted.
M&L for application of two coat of smart care damp block 2k slurry by brush or roller on brick surface (2nd coat shall be applied after 4-6 hours of Ist coat) to achieve a coverage of 0.72Kg/Sqm/coat and 15mm thick cement plaster in two layers of 10mm in CM 1:4 and 5mm in CM 1:3 as setting coat, trowelled to even and smooth on fair face of brick walls or concrete surfaces without using extra cement incl taking down old cement plaster from walls complete all as specified.
M&L for preapration of old plastered or unplastered surafces t of walls, concrete tiles, kerb stone and the like and applying one coat of weather proof exterior emulsion paint complete all as specified and directed.
M&L for preparation of old painted surfaces of wood and wood based surfaces of any description, not otherwise described and applying one coat of synthetic enamel paints over 10cm width or girth complete all as specified and as directed by Engr-in-Charge
Removing old paint by paint removers or burning off by blow lamps and cleaning with scrapers, any number of coats, any wiidth or girth and preparation of previously untreated wood and wood based sufaces of any description not othrwise described over 10 cms width or girth and applying two coat of synthetic enamel paint (any tint) complete all as specified and directed.
M&L for preparation of old painted steel surfaces of any description, not otherwise described and applying one coat of synthetic enamel paint over 10cm width or girth complete all as specified and as directed by Engr-in-Charge
M&L for preparation of old painted plastered or concrete surfaces of any description over 10cm girth or width, not otherwise described and applying one coat of synthetic enamel paint complete all as specified and as directed by Engr-in-Charge
M&L for one coat of french polish on old decorated wooden surfaces of any description including preparation of surface.
S&F ceramic tiles 300X300 in vertical surfaces on sides / front of buildingd to mark bldg nos fixed with Fevimate adhesive and printed with numbers etc or stick computersied Sticker letters up to 8 letters of 15 cm height comma,dash all as directed by Engr -in-charge.
Material and labour for TMT bar 10mm dia and over,cut to length,bent to shape required,including cranking,bending spirally for hooping for columns,hooking ends and binding with and including mild steel wire (annealed) not less than 0.90 mm dia or securing clips for structural connection in RCC beams, columns, lintel and,walls ,slabs ,RCC Chhajjas and facia complete all as specified and directed (Any storey/ height of building/ structure/including scaffolding).
Material and labour for TMT bar 6 to 8mm dia and over,cut to length,bent to shape required,including cranking,bending spirally for hooping for columns,hooking ends and binding with and including mild steel wire (annealed) not less than 0.90 mm dia or securing clips for structural connection in RCC beams, columns, lintel and,walls ,slabs ,RCC Chhajjas and facia complete all as specified and directed (Any storey/ height of building/ structure/including scaffolding).
M&L for RCC (1: 1½ :3) ,12.50 mm graded aggregate in position for strengthening of beams,columns,facia,RCC chhajja,stair and including other structural elements of any thickness and including surface preparation & suitable type of formwork etc complete all as per directed by Engr-in-Charge.(Any storey/height of building/structure/icluding scaffolding).
S&F for welded steel wire fabric n exc 4kg/sqm welded to existing reinforcement complete all as per direction of Engr-in-Charge.
Note:- (a) The work is required to be carried out in buildings up to trippled storyed. (b) :- The contractor will all make arrangement for scaffolding etc. © :- Adequate arrangement for safty and security of labours shall also be made by the contractor. (d) :- The cost of all above shall deemed to be included in the rates quoted by the contractor and nothing extra shall be admissible.
M/S Manmohan Singh Anand
KAPOOR ELECTRICALS
Jain Engineering Works
M/S AJIT CONSTRUCTION CO
Panwar Construction Co.
M/s Anjali Construction
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .