The Superintending Engineer
Tender for Survey, Design, Supply, Installation, Testing, Commissioning and Comprehensive Maintenance for 5 years of Distributed Grid-connected Solar PV plants at various under Dhanera AM Divisions under Palanpur Circle. (PHASE - II)
336074
PTC/ET/84/2026
Open
Electrical Goods/Equipment
Works
Banaskantha
16 documents required · 16 mandatory
₹5,900
Gujarat Energy Transmission Corporation Ltd
₹84,415
17 Aug 2026
17 Aug 2026
17 Aug 2026
1 Sept 2026
17 Aug 2026
Date of opening of Tender fee, EMD and technical bid on – line
Dt. As per N-code
3 opening at 16.01 Hours.(If Possible)
4 Tentative Date of on – line opening of Price bid Shall be intimated separately.
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
1. Bidder has to upload scanned copies of original (Notarized / self-attested copies of original – as specified
in tender document) documents with bid and no physical documents to be submitted by bidder including
Tender fee, EMD. Signed and Scanned copies of all the annexures of the tender required to be upload
2. Bidders have to submit Technical bid as well as Price bid in electric format only on above
mentioned website till the date and time shown above. It is required that only online submission
of tender fees, EMD (NEFT/RTGS/ONLINE/Online transaction Slip) dully signed integrity pact to
be done. However, of anywhere in tender documents submission of other than this document
physical submission mentioned to be overlooked.
3. If the EMD amount is should be paid either by Payment of EMD by RTGS/NEFT/on line shall
be encouraged. Payment through RTGS/NEFT/online bidder has to mail following details to
The transection slip of payment made by RTGS/NEFT/Online is to be uploaded in Nprocure with
tender documents.
Sr No Required Details
1 Name & Address of the bidder
2 Bidder GST No
3 Tender No with due date
4 Mode of Transfer
5 Ref. ID with Bank Details
7 Payment against (Tender Fee/ EMD)
Bidder has to provide all above details by email on the same date of payment so that
receipt can be generated.
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
4. GETCO beneficiary Bank Details as under
1 Name of Account Holder Gujarat Energy Transmission Corporation Ltd.
2 Account No. ‘01740200000624
3 Name of Bank Bank of Baroda
4 Branch Code PALANP
Transmission Circle, 66kv S/S Campus,
5 Address of Bank Abu Highway,
6 IFSC Code BARB0PALANP (“ Fifth Digit is Zero”)
7 PAN No AABCG4029R
8 TAN No AHMG02636E
9 GST No 24AHMG02636E1DV
5. In case short submission of documents with bid and / or clarification if any required from the bidder, the
required details / documents may be asked from bidder in physical form.
6. It shall be sole responsibility of the bidder that the uploaded scanned documents (in PDF from) remain
legible and should not be password protected.
7. All the relevant scanned documents as per requirement of the tender are to be upload through online
only on n procure portal including Tender fee, EMD and attested Integrity Pact. Physical copies of Tender
fee, EMD and Integrity Pact to be submitted in sealed cover on OR before due date and time. (All tender
documents including Price bid are not to be submitted with the physical documents including Tender fee,
EMD and Integrity Pact).
8. Tender will be evaluated on Data / Details / Documents of the online offer only.
9. It is mandatory for all the bidders to upload their tender documents by on line (E-tendering) in scheduled
10. The bidders are required to fill up all the online annexure / forms. This is intended for transparency and
speedy evaluation of the bids. Instead of simply confirming / attached in bid, the Bidder shall fill in the
particulars against appropriate place in respect of each line appearing in each online annexure. Wherever
required, bidder shall invariably have to upload supporting authentic documents in the online bid.
(In the absence of required details in the online annexure, the owner has every right to evaluate the bids
accordingly and bidder cannot raise any objection against any point during evaluation.)
11. Bidders are requested to remain in touch with the web-site for any amendment / corrigendum or
extension of due date etc
12. No tender shall be accepted / opened in case of receipt after due date and time of tender, irrespective
of delay due to postal services or any other reasons and the Corporation shall not assume any responsibility
for late receipt of tender.
13. The Earnest Money Deposit and tender fee will be accepted by NEFT/RTGS/ONLINE/Online on any
Nationalized Bank only situated at “Palanpur” drawn in favor of “GUJARAT ENERGY TRANSMISSION
CORPORATION LTD.” EMD and Tender Fee NEFT/RTGS/ONLINE/Online with different purchaser or agency
shall not be accepted. Tender without EMD and tender fee shall be rejected.
14. The GETCO reserves the right to award the work to one or more bidders, considering their technical
and financial capacity OR to reject any or all tenders or accept any tender without assigning any reason
Any technical questions, information and clarifications that may be required pertaining to this enquiry
should be referred to:
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
The S u p e r i n t e n d i n g Eng i neer ( TR),
Gujarat E ne r g y T r ans m is s i on C o r p o r a t i o n
Limited, Circle Office, Aroma Circle,
Palanpur, - 385
GETCO reserves the right to reject any OR all tenders without assigning any reasons thereof.
Yours faithfully,
Superintending Engineer (AM),
GETCO, Palanpur
Sr.No. Document Code Part
1. Tender Notice - I
2. Instructions to Tenderers ITB I
3. General Conditions of Contract GCC I
4. Scope of Work I
5. General Information SCC I
6. Special Conditions of Contract with Declaration Form SCC I
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
INSTRUCTIONS TO BIDDERS
A. INTRODUCTION
1.0 General Particulars
1.1 The Gujarat Energy Transmission Corporation Ltd., Baroda hereinafter called ‘’/ ‘OWNER’ intends
to receive bids for erection of structures and all equipment including earthing installation as
detailed in the accompanying specifications in accordance with Terms and Conditions herein. The
bids shall be prepared and furnished as per these Instructions.
2.0 Qualification Requirements of Bidders
1. Registration: The Bidder shall be strictly a registered with GEDA.
2. Experience: The Bidder should have designed, supplied, installed & commissioned Grid
connected Solar PV Power Projects having aggregate capacity not less than 200 kW in
residential Sector during last three years in any Government department
3. Solvency: Latest bank solvency certificate not older than 1 Year from any Nationalized/
Scheduled/Co-operative Bank of a sum of minimum 20 % of the estimated cost shown in
4. Provident Fund Code: Separate provident fund code number towards firm registered with
Regional P. F. Commissioner.
5. Financial Statement: The Bidder should submit certified photocopy of audited financial
statement i.e. Balance sheet with profit and loss account of last three Years. In case, audit
is not mandatory, bidder should submit photocopy of financial statements i.e. Balance
Sheet & Profit & Loss Account
6. Nature of Firm: Attested copy of Partnership Deed, Power of Attorney, if any, for signing
the bid documents in case of partnership firm & self-affidavit for proprietorship firm.
MOA/AOA shall be submitted in case it is corporate entity. All such documents shall
have to be NOTARISED.
7. I.T. PAN CARD: The bidder should submit the attested Photocopy of PAN Card of their
8. GST Registration: The bidders should submit the certified copy of GST registration of their
9. Electrical contractor’s license: The bidders should submit the attested copy of GOG
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
Electrical Contractor licenses of firm with latest validation.
The bidders must attach and submit all above documents scanned copy on n-procure and
certified/self-verified copy of all documents to be submitted with Technical bid online only.
CHECK LIST OF DOCUMENTS SUBMISSION
Mandatory to upload on-line only (pdf file)
No. Particulars
1 Scan of Demand Draft of Tender Fee Amount / Online payment receipt
2 Scan of Demand Draft of EMD Amount / Online payment receipt
3 ReAIStration document as Approved Contractor –of GEDA
Work completion certificate in Form No.3A (Experience Certificate as main
contractor) only as Per Qualification Requirement
5 Bank Solvency Certificate
6 GST ReAIStration Number Documents
Nature of Firm: Partnership deed/Latest Form-G/ POA/Authorized Signatory
Certificate for Partnership
Self-Affidavit/POA/Authorized Signatory Certificate for Proprietorship
8 Provident Fund Code Number Documents
9 PAN Number Document
Income Tax Return, Profit Loss Accounts and Balance sheet of Last Three
Financial Years
11 Electrical Contractor License
13 Filling Annexure 1 to
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
Technical Specification
Tender for Survey, Design, Supply, Installation, Testing, Commissioning and Comprehensive
Maintenance for 5 years of Distributed Grid-connected Solar PV plants at various under
Dhanera AM Divisions under Palanpur Circle. (PHASE - II)
The assorted rating of the solar rooftop system for which the rates shall be discovered are
Sr No Proposed Sub/station Capacity
1 66 KV Kuvarla SS 10KW
2 66 KV Nagfana SS 10KW
3 66 KV Sherpura SS 10KW
4 66 KV Dhakha SS 10KW
5 66 KV Nenava SS 10KW
6 66 KV Voda SS 10KW
7 66 KV Ghodasar SS 10KW
8 66 KV Malotra SS 10KW
9 66 KV Samarwada SS 10KW
10 66 KV Chekra SS 10KW
11 66 KV Nanuda SS 10KW
12 66 KV Vaktapura SS 10KW
13 66 KV Duva SS 10KW
14 66 KV Morthal SS 10KW
15 66 KV Kuchawada SS 10KW
16 66 KV Kherola SS 10KW
17 66 KV Charda SS 10KW
18 66 KV Runi SS SS 10KW
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
(Project capacity will be considered in AC. Payment to Bidder will be done on AC Capacity
Registered, DC Capacity Installed, and Invertor Installed, whichever will be less.)
The broad specifications of the system (Detailed Specifications are given in the Tender
elsewhere) shall be as follows:
1) Solar PV Modules: - Poly Crystalline make solar module not less than 300 Wp each
and having valid IEC certificate. (Certificate to be submitted on shortlisting of
successful Tenders). The PV Cell and the modules shall be of INDIAN MAKE.
Necessary documents in this regards must be provided to GEDA/GETCO.
The bidder shall be required to submit the Self declaration, regarding the Modules
and Solar cells used under this supply are “Made in India”, from the concerned
manufacturer of Solar Modules, before commissioning of the System. Such firm
and Shortlisted bidder, those violate the requirement of Indian Make Solar Cell and
Module shall be put under the black list, and or stop deal list as may be decided by
the GEDA/GETCO.
Violation of norms of Domestic Content Requirement (DCR) Under Solar PV
projects will lead to penalties and action as mentioned in office memorandum of
MNRE GOI vide letter no. 283/2018-GRID SOLAR dated 20th February,
The ALMM list is published by the MNRE vide Notification No. 283/54/2018-Grid
Solar-Part(1) Dated 30-12-2021 and the notification for the same is also published
by the MNRE vide Notification No. 283/54/2018-Grid Solar-Part(2) Dated 13-01-
2022. The Model and Manufactures of the Module and Cell shall be from the
ALMM only used in the SPV System in this project.
2) Invertor: - IEC certified invertor with in-built anti-islanding facility of Rated capacity
plus minus 10% of the aggregate capacity of the modules.
3) Mounting structure: - The mounting (Rectangle pipe/square pipe / circular pipe)
with requisite cross bars, nuts and bolts etc. shall be pre-galvanized or galvanized.
The Rectangular /square / circular hollows pipe section used for the structures
should have a minimum 2.5 mm. A certificate of a structural engineer certifying
the strength and stability of the mounting structure to withstand the weight and
wind speed of 150 km/hour throughout the life span of 25 years of the system,
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
shall be submitted by the vendors. The ground clearance of the bottom most edge
of solar panel shall not be less than 1200 mm.
4) AC, DC cable shall be of ISI mark and reputed make.
5) Lightning arrestor shall be provided for each of the Solar Rooftop installations. It
shall be of ISI mark and reputed make.
6) The system cost shall be inclusive of supply of solar modules, invertors, mounting
structure, AC DC cables in RPVC conduit as per requirement on location (Rate
include supply of minimum AC Cable length Upto 30 Meter/Building), AC - DB, DC
– DB, earthing, LA, Bidirectional meter, Solar AC Meter and its installation. No any
differential/additional Charges for LT Bidirectional meter will be reimbursed.
The rate quoted per kW for each project should be inclusive of all taxes. No rate
revision under this tender will be allowed in any circumstances.
7) The scope of regular cleaning of the modules for five years shall also be in the scope
of Bidder. The arrangement of required water etc for regular cleaning of the modules
shall be in the scope of the Bidder.
8) The payment terms towards the supply, Installation, commissioning and 5 years CMC shall be as
a) 100% of the order value upon certification of GEDA/third party approved by GEDA and
commissioning of the system upon installation of the bidirectional and solar meter and complete
the installation process with uploading of all documents on GEDA online portal., or as may be
2. Installation certificate duly signed by beneficiary/GEDA official/third party showing its
commissioning date (date of bi-directional meter installation)
Note : Performance Guarantee for 5 years –CMC :
You have to Submit 20% of the order value against the equivalent amount of performance bank
guarantee/ Demand draft valid for a period of 5 years from the date of commissioning of the
system. (date of meter Installation).
Completion period:
The Project completion period shall be 03 months from the date of placement of order, completion
should mean, commissioning of the system, meaning commencement of injection of power to
grid. The delay if any in the specific completion period shall be dealt with on the basis of the
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
certified documentary evidence of the single line diagram (SLD) drawing, submission and approval
to CEI, estimate generation and payment to DISCOM and application submission and approval of
CEI for charging of system.
For different site location you have to provide separate gang. Within 03 Months time limit you have to
complete work of all SS as per given lists.
TECHNICAL SPECIFICATIONS FOR GRID CONNECTED SPV SYSTEMS
The specifications of SPV systems, for which tender invited, is as under. The self-certified Test
Report(s) of each of the components/ systems mentioned shall be submitted before starting
System installation. To ensure optimum performance of the solar installation and its related
safety aspects, the provisions of the publication of GERMI on “Best Practices in Operation and
Maintenance of Roof Top Solar PV systems in India” published in May, 2018 be followed.
The proposed projects shall be commissioned as per the technical specifications given below. Any
short comings will lead to cancelation of Empanelment as may be decided by GETCO. The
specifications, in the GERC Regulation on Net Metering shall also be applicable. The technical
specifications mentioned herewith are minimum requirement, specifications of higher side will
A Grid Tied Solar Rooftop Photo Voltaic (SPV) power plant consists of SPV array, Module
Mounting Structure, Power Conditioning Unit (PCU) consisting of Maximum Power Point Tracker
(MPPT), Inverter, and Controls & Protections, interconnect cables, solar meter, bi-directional
energy meter and switches. PV Array is mounted on a suitable structure. Grid tied SPV system is
without battery and should be designed with necessary features to supplement the grid power
during daytime. Components and parts used in the SPV power plants including the PV modules,
metallic structures, cables, junction box, switches, PCUs etc., should confirm to the BIS, IEC, or
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
international specifications, wherever such specifications are available and applicable.
Solar PV system shall consist of following equipment/components.
1. Solar Photo Voltaic (SPV) modules consisting of required number of Crystalline PV
2. Inverter and Remote Monitoring System.
3. Module mounting structures.
4. Energy Meter.
5. Array Junction Boxes.
6. DC Distribution Box.
7. AC Distribution Box.
8. Protections – Earthing, Lightning, Surge.
10. Drawing & Manuals.
11. Miscellaneous.
a. SOLAR PHOTOVOLTAIC MODULES:
1.1.1 The PV modules and Solar Cell used should be made in India. Necessary documents in this
regards must be provided to GETCO.
Violation of norms of Domestic Content Requirement (DCR) UNDER Solar PV projects will
lead to penalties and actions as mentioned in office memorandum of MNRE GOI vide
letter no. 283/2018-GRID SOLAR dated 20th February, 2018 as under:
a) Filing of criminal case under IPC 420 and related Sec.
b) Blacklisting f developers for period of 10 years
c) Forfeiting of relevant bank guarantee(s)
d) Disciplinary case against the Officers of concerned CPSU/ State Govt.
e) Any other action, in addition to those above
SPV Modules and Solar Cells must be used for this Scheme shall be domestically manufactured
as per MNRE’s requirement. The Empanelled Agencies shall require to submit the Self
declaration, regarding the Modules and Solar cells used under the Scheme are “Made in India”,
from the concerned manufacturer of Solar Modules, supplied for this scheme of GoG/GOI, before
commissioning of the System. Violation of this condition will be reported to the MNRE and GoG
for taking actions against the Manufacturer of the Solar Modules and Empanelled Agency. Such
firm and Empanelled Agency may be put under the black list or stop deal list as may be decided
by the GETCO Authority.
In absence of the ALMM, the Empanelled Agencies shall have to submit self-declaration regarding
domestically manufactured Cell and Modules used in the SPV System in this project. Whenever,
the ALMM list published by the MNRE, the Model and Manufactures of the Module and Cell shall
be from the ALMM only used in the SPV System in this project.
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
The PV modules used must qualify to the latest edition of IEC standards or equivalent BIS
standards, i.e. IEC 61215/IS14286, IEC 61853-Part I/IS 16170-Part I, IEC 61730 Part-1 & Part 2. For
the PV modules to be used in a highly corrosive atmosphere throughout their lifetime, they must
qualify to IEC 61701/IS
a) The total solar PV array capacity should not be less than allocated capacity (kWp) and
should comprise of solar crystalline modules of minimum 300 Wp. Module capacity less
than 300 watts shall not be accepted
b) Protective devices against surges (SPD) at the PV module shall be provided. Low voltage
drop bypass diodes shall be provided. Surge Protective Device (SPD) of appropriate
capacity & type shall be provided either in the inverter or in DC Junction Box for protection
against surges. Low voltage drop bypass diodes shall be provided.
C) PV modules must be tested and approved by one of the NABL accredited and BIS Approved
d) The module frame shall be made of corrosion resistant materials, preferably having
anodized aluminium.
e) The bidder shall carefully design & accommodate requisite numbers of the modules to
achieve the rated power in his bid.
f) The PV Module efficiency should be higher than 16 %
Solar PV modules of minimum fill factor 75%, to be used.
g) Other general requirement for the PV modules and sub systems shall be the following:
I. The rated power of solar PV module shall have maximum tolerance up to +3%.
II. The peak-power point current of any supplied module string (series connected
modules) shall not vary by +1% from the respective arithmetic means for all
modules and/or for all module strings (connected to the same MPPT), as the
The peak-power point voltage of any supplied module string (series connected
modules) shall not vary by + 2% from the respective arithmetic means for all
modules and/or for all module strings (connected to the same MPPT), as the
III. All electrical parameters at STC shall have to be provided.
IV. Minimum certified PV module efficiency shall be +17 % for crystalline The
temperature co-efficient power of the PV module shall be equal to or better than
V. All PV modules should carry a performance warranty of >90% during the first
years, and >80% during the next 15 years. Further, module shall have performance
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
warranty of >97% during the first year of installation. Degradation of module
should not be more than 1 % per annum.
1.1.2. The PV modules shall be equipped with IP 65 or better protection level junction box
with required numbers of bypass diodes of appropriate rating and appropriately sized
output power cable of symmetric length with MC4 or equivalent solar connectors. The
IP level for protection may be chosen based on following conditions:
i. An IP 65 rated enclosure is suitable for most outdoor enclosures that won’t encounter
extreme weather such as flooding.
ii. An IP 67 rated enclosure is suitable at locations which may encounter temporary
submersion at depths of up to one meter.
iii. An IP 68 enclosure is recommended if there may exist situations of submergence for
extended periods of time and at substantial depths.
1.1.3. Modules deployed must use a RF identification tag. The following information must be
mentioned in the RFID used on each module (This can be inside or outside the laminate,
but must be able to withstand harsh environmental conditions).
a) Name of the manufacturer of the PV module
b) Name of the manufacturer of Solar Cells.
c) Month & year of the manufacture (separate for solar cells and modules)
d) Country of origin (separately for solar cells and module)
e) I-V curve for the module Wattage, Im, Vm and FF for the module
f) Unique Serial No and Model No of the module
g) Date and year of obtaining IEC PV module qualification certificate.
h) Name of the test lab issuing IEC certificate.
i) Other relevant information on traceability of solar cells and module as per ISO
j) Nominal wattage +3%.
k) Brand Name, if applicable.
Other details as per IS/IEC 61730-1 clause 11 should be provided at appropriate place.
The actual Power Output Pmax shall be mentioned on the label pasted on the back side of PV Module. In
addition to the above, the following information should also be provided:
i. Polarity of terminals or leads (color coding is permissible) on junction Box housing
near cable entry or cable and connector.
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
The Maximum system voltage for which the module is suitable to be provided on
the back sheet of the module.
1.1.4. Warranties:
a) Material Warranty:
i. Material Warranty is defined as: The manufacturer should warrant the Solar
Module(s) to be free from the defects and/or failures specified below for a period
not less than five (05) years from the date of commissioning.
ii. Defects and/or failures due to manufacturing
iii. Defects and/or failures due to quality of materials
iv. Non conformity to specifications due to faulty manufacturing and/or inspection
processes. If the solar Module(s) fails to conform to this warranty, the
manufacturer will repair or replace the solar module(s), at the Owners sole
b) Performance Warranty:
i. The predicted electrical degradation of power generated not exceeding 20%of the
minimum rated power over the 25-year period and not more than 10%after ten
years’ period of the full rated original output.
2. ARRAY STRUCTURE:
The mounting structure steel shall be as per latest IS 2062: 2011 and hot dip galvanization of the
mounting structure shall be in compliance of latest IS
3. Module Mounting Structure (MMS):
3.1. Supply, installation, erection and acceptance of module mounting structure (MMS)
Necessary accessories, auxiliaries and spare part shall be in the scope of the work.
3.2. Module mounting structures can be made from two types of materials. They are Hot
Dip Galvanized Iron or Hot Dip Galvanized Mild Steel (MS). However, MS will be preferred for
raised structure.
3.3. MMS Steel shall be as per latest IS 2062:2011 and galvanization of the mounting
structure shall be in compliance of latest IS
3.4. All bolts, nuts, fasteners shall be of stainless steel of grade SS 304 or hot dip
galvanized, panel mounting clamps shall be of aluminium and must sustain the
adverse climatic conditions. Structural material shall be corrosion resistant and
electrolytically compatible with the materials used in the module frame, its fasteners,
nuts and bolts.
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
3.5. The module mounting structures should have angle of inclination as per the site
conditions to take maximum insolation and complete shadow-free operation during
generation hours. However, to accommodate more capacity the angle of inclination
may be reduced until the plant meets the specified performance ratio requirements.
3.6. The Mounting structure shall be so designed to withstand the speed for the wind zone
of the location where a PV system is proposed to be installed. The PV array structure
design shall be appropriate with a factor of safety of minimum 1.5.
3.7. The upper edge of the module must be covered with wind shield so as to avoid build
air ingress below the module. Slight clearance must be provided on both edges (upper
& lower) to allow air for cooling.
3.8. Suitable fastening arrangement such as grouting and calming should be provided to
secure the installation against the specific wind speed. The Empanelled Agency shall
be fully responsible for any damages to SPV System caused due to high wind velocity
within guarantee period as per technical specification.
3.9. The structures shall be designed to allow easy replacement, repairing and cleaning of
any module. The array structure shall be so designed that it will occupy minimum
space without sacrificing the output from the SPV panels. Necessary testing provision
for MMS to be made available at site.
3.10. Adequate spacing shall be provided between two panel frames and rows of panels to
facilitate personnel protection, ease of installation, replacement, cleaning of panels
and electrical maintenance.
3.11. The structure shall be designed to withstand operating environmental conditions for
a period of minimum 25 years.
3.12. The Rooftop Structures maybe classified in three broad categories as follows
(drawings at Annex-I):
i. Ballast structure
a. The mounting structure must be Non-invasive ballast type and any sort of
penetration of roof to be avoided.
b. The minimum clearance of the structure from the roof level should be in between
70-150 mm to allow ventilation for cooling, also ease of cleaning and maintenance
of panels as well as cleaning of terrace.
c. The structures should be suitably loaded with reinforced concrete blocks of
appropriate weight made out of M25 concrete mixture.
a. The structure design should be as per the slope of the tin shed.
b. The inclination angle of structure can be done in two ways-
b.1. Parallel to the tin shed (flat keeping zero-degree tiling angle), if the
slope of shed in Proper south direction
b.2. With same tilt angle based on the slope of tin shed to get the
maximum output.
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
c. The minimum clearance of the lowest point from the tin shade should be
more then 100mm.
d. The base of structure should be connected on the Purlin of tin shed with the
proper riveting.
e. All structure member should be of minimum 2 mm thickness.
iii. RCC Elevated structure: It can be divided into further three categories:
A. Minimum Ground clearance (300MM – 1200 MM)
a. The structure shall be designed to allow easy replacement of any module
and shall be in line with site requirement. The gap between modules
should be minimum 30MM.
b. Base Plate – Base plate thickness of the Structure should be 5MM for
c. Column – Structure Column should be minimum 2MM in Lip section /
3MM in C-Channel section. The minimum section should be 70MM in
Web side and 40MM in flange side in Lip section.
d. Rafter - Structure rafter should be minimum 2MM in Lip section / 3MM
in C-Channel section. The minimum section should be 70MM in Web
side (y-axis) and 40MM in flange side (x-axis).
e. Purlin - Structure purlin should be minimum 2MM in Lip section. The
minimum section should be 60MM in Web side and 40MM in flange side
in Lip section.
f. Front/back bracing – The section for bracing part should be minimum
g. Connection – The structure connection should be bolted/welded
completely. Leg to rafter should be connected with minimum
diameter bolt. Rafter and purlin should be connected with minimum
diameter bolt. Module mounting fasteners should be SS-304 only and
remaining fasteners either SS-304 or HDG 8.8 Grade.
h. For single portrait structure the minimum ground clearance should be
3.13. Material standards:
i. Design of foundation for mounting the structure should be as per defined
standards which clearly states the Load Bearing Capacity & other relevant
parameters for foundation design (As per IS 6403 / 456 / 4091 / 875).
ii. Grade of raw material to be used for mounting the structures so that it
complies the defined wind loading conditions (As per IS 875 - III) should be
referred as follows (IS 2062 – for angles and channels, IS 1079 – for sheet,
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
IS 1161 & 1239 for round pipes, IS 4923 for rectangular and square hollow
iii. Test reports for the raw material should be as per IS 1852 / 808 / 2062 /
iv. In process inspection report as per approved drawing & tolerance should be
v. For ascertaining proper welding of structure part following should be
a. D.P. Test (Pin Hole / Crack) (IS 822)
b. Weld wire grade should be of grade (ER 70 S - 6)
vi. For ascertaining hot dip galvanizing of fabricated structure following should
a. Min coating required should be as per IS 4759 & EN
b. Testing of galvanized material
Pierce Test (IS 2633)
Mass of Zinc (IS 6745)
Adhesion Test (IS 2629)
CuSO4 Test (IS 2633)
Superior High Grade Zinc Ingot should be of 99.999% purity (IS 209)
(Preferably Hindustan Zinc Limited or Equivalent).
vii. Foundation Hardware – If using foundation bolt in foundation then it
should be as per IS
3.14. Design Validation- The Structure design and drawing should be duly verified by
a licensed Structural designer before installation for all types of structure
arrangements including the extension made, as per specification.
JUNCTION BOXES (JBs):
a) The junction boxes are to be provided in the PV array for termination of connecting
cables. The Junction Boxes (JBs) shall be made of GRP/FRP/Powder Coated
aluminium /cast aluminium alloy with full dust, water & vermin proof
arrangement. All wires/cables must be terminated through cable lugs. The JBs shall
be such that input & output termination can be made through suitable cable
glands. Suitable markings shall be provided on the busbars for easy identification
and cable ferrules will be fitted at the cable termination points for identification.
b) Copper bus bars/terminal blocks housed in the junction box with suitable
termination threads Conforming to IP65 standard and IEC 62208 Hinged door with
EPDM rubber gasket to prevent water entry. Single /double compression cable
glands should be provided.
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
c) For array junction box/ PV combiner box, Empanelled Agency may also provide
polyamide glands and MC4 Connectors. The rating of the junction box shall be
suitable with adequate safety factor to interconnect the Solar PV array
d) Suitable markings shall be provided on the bus bar for easy identification and the
cable ferrules must be fitted at the cable termination points for identification.
e) Junction boxes shall be mounted on the MMS such that they are easily accessible
and are protected from direct sunlight and harsh weather.
DC DISTRIBUTION BOX (DCDB):
May not be required for small plants, if suitable arrangement is available in the inverter.
a) DC Distribution Box (DCDB) to receive the DC output from the PV array field.
b) DC DBs shall be dust & vermin proof conform having. IP 65 or better protection, as
per site conditions.
C The bus bars are made of EC grade copper of required size. Suitable capacity
MCBs/MCCB shall be provided for controlling the DC power output to the inverter a long
with necessary surge arrestors. MCB shall be used for currents up to 63 Amperes, and
MCCB shall be used for currents greater than 63 Amperes
5. AC DISTRIBUTION BOX (ACDB):
a) AC Distribution Panel Board (DPB) shall control the AC power from PCU/inverter,
and should have necessary surge arrestors. Interconnection from ACDB to mains
at LT Bus bar while in grid tied mode.
b) All switches and the circuit breakers, connectors should conform to
IEC60947:2019, part I, II and III/ IS60947 part I, II and III.
c) The changeover switches, cabling work should be undertaken by the bidder as part
of the project.
d) All the Panel’s shall be metal clad, totally enclosed, rigid, floor mounted, air -
insulated, cubical type suitable for operation on three phase / single phase,415 or
230 volts, 50 Hz
e) The panels shall be designed for minimum expected ambient temperature of
degrees Celsius, 80 percent humidity and dusty weather.
f) All indoor panels will have protection of IP54 or better. All outdoor panels will have
protection of IP65 or better as per site conditions.
g) Should conform to Indian Electricity Act and CEA safety regulations (till last
h) All the 415 AC or 230 volts devices / equipment like bus support insulators, circuit
breakers, SPDs, VTs etc., mounted inside the switchgear shall be suitable for
continuous operation and satisfactory performance under the following supply
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
a. Variation in supply voltage: +/- 10 % as per CEA/State regulations.
b. Variation in supply frequency :+/- 3 Hz as per CEA/State regulations.
i) The inverter output shall have the necessary rated AC surge arrestors, if required
and MCB/ MCCB. RCCB shall be used for successful operation of the PV system, if
inverter does Not have required earth fault/residual current protection.
6. PCU/ARRAY SIZE RATIO:
The recommended the solar PV array capacity in KW shall be in a range of 100%-
110% of invertor capacity. i.e if the Invertor Capacity is 5 KW, then the Solar PV
array capacity should be from 5 KW to 5.5 KW.
7. Inverter and Remote Monitoring System :-
All the Inverters should contain the following clear and indelible Marking Label &
Warning Label as per IS16221 Part II, clause 5. The equipment shall, as a minimum, be
permanently marked with:
a) The name or trade mark of the manufacturer or supplier;
b) A model number, name or other means to identify the equipment,
A serial number, code or other marking allowing identification of manufacturing
location and the manufacturing batch or date within a twelve month time period.
c) Input voltage, type of voltage (a.c. or d.c.), frequency, and maximum continuous
current for each input.
d) Output voltage, type of voltage (a.c. or d.c.), frequency, maximum continuous
current, and for a.c. outputs, either the power or power factor for each output
e) The Ingress Protection (IP) rating
Marking shall be located adjacent to each fuse or fuse holder, or on the fuse holder, or
in another location provided that it is obvious to which fuse the marking applies, giving
the fuse current rating and voltage rating for fuses that may be changed at the installed
Particulars Details
Switching devices IGBT/MOSFET
Control Microprocessor /DSP
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
Nominal AC output voltage For 3-phase/ 1phase :- 415V / 240 V
Output frequency 50 Hz
Grid Frequency Synchronization range + 3 Hz or more
Ambient temperature considered -20° C to + 50° C
Humidity 95 % Non-condensing
Protection of Enclosure
IP-65(Minimum).
Grid Frequency Tolerance range + 3 or more
No-load losses Less than 1% of rated power
Inverter Efficiency(minimum) (Above 10 kW)
Peak Efficiency At least 97%, measure as per IEC
Euro Efficiency At least 96%, measure as per IEC
Peak Efficiency At least 96%, measure as per IEC
Euro Efficiency At least 95%, measure as per IEC
Communication interface RS 485 with Modbus
Display type LCD for data display. LCD / LED for status display
Protections • Over voltage (both input and output)
• Over current (both input and output)
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
• Over/Under grid frequency
• Over temperature
• Short circuit
• Surge voltage induced at output due to
external source
• Anti-islanding
Recommended Alert/Indications • Inverter ON
• Inverter Under / Over Voltage
• Inverter Overload
• Inverter Over Temperature
Recommended LCD Display on Inverter • Output power (W)
• Daily Energy (Wh)
• cumulative energy (Wh)
• DC voltage (V)
• DC current (A)
• AC voltage (V)
• AC frequency (Hz)
• AC current (A)
• Cumulative hours of operation (h).
a) The inverter shall have an RS-485 interface and support communication of its
operational parameters and logs over Modbus protocol. The reAISter
mapping/memory mapping of the inverter data shall be made available by the
Empanelled Agency from the inverter supplier to the GETCO/GUVNL.
b) Three phase PCU/ inverter shall be used with each power plant system above 6KW
and In case of 6 KW or less Capacity single phase/3pahse inverter shall be used as
per market availability. In case of capacity addition of existing Solar plant, if the
existing inverter is required to be replaced, the cost same is to be borne by
consumer up on mutual agreement with Agency and consumer.
c) The output of power factor of PCU/ inverter is suitable for all voltage ranges or sink
of reactive power, inverter should have internal protection arrangement against
any sustain fault in feeder line and against the lightning on feeder.
d) Built-in meter and data logger to monitor plant performance through external
computer shall be provided.
e) The power conditioning units / inverters should comply with applicable
IEC/equivalent BIS standard for efficiency measurements and environmental tests
as per standard codes IEC 61683/IS 61683 and IEC 60068-2(1,2,14,30) /Equivalent
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
f) The charge controller (if any) / MPPT units environmental testing should qualify
IEC 60068-2(1, 2, 14, 30)/Equivalent BIS std. The junction boxes/enclosures should
be IP 65(for outdoor)/ IP 54 (indoor) and as per IEC 529 Specifications.
g) The PCU/ inverters should be tested from the MNRE approved test centers /NABL
/BIS /IEC accredited testing- calibration laboratories. In case of imported power
conditioning units, these should be approved by international test houses. Valid
type test report shall be submitted by the empanelled agency before
commissioning of the SPV System.
h) All inverters shall be IEC 61000 compliant for electromagnetic compatibility,
harmonics, Surge, etc.
i) Maximum Power Point Tracker (MPPT) shall be integrated in the PCU/inverter to
maximize energy drawn from the array.
j) The PCU/ Invertor shall have overloading capacity of minimum 10%
k) The allowable capacity of inverter shall be (+15/-10 %) of roistered AC Capacity.
8. INTEGRATION OF PV POWER WITH GRID:
• The output power from SPV would be fed to the inverters which converts DC
produced by SPV array to AC and feeds it into the main electricity grid after
synchronization.
• In the event of a power failure on the electric grid, it is required that any
independent power-producing inverters attached to the grid turn off in a short
period of time. This prevents the DC-to-AC inverters from continuing to feed power
into small sections of the grid, known as “islands.” Powered islands present a risk
to workers who may expect the area to be unpowered, and they may also damage
grid-tied equipment. The Rooftop PV system shall be equipped with islanding
protection. In addition to disconnection from the grid (due to islanding protection)
disconnection due to under and over voltage conditions shall also be provided.
• A manual disconnect 4 pole isolation switch beside automatic disconnection to grid
would have to be provided at utility end to isolate the grid connection by the utility
personnel to carry out any maintenance. This switch shall be locked by the utility
9. DATA ACQUISITION SYSTEM / PLANT MONITORING
i. Data Acquisition System shall be provided for each of the solar PV plant.
ii. Remote Monitoring and data acquisition through Remote Monitoring System
software at the GETCO location with latest software/hardware configuration and
service connectivity for online / real time data monitoring/control complete to be
supplied and operation and maintenance/control to be ensured by the Empanelled
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
Agency. Provision for interfacing these data on GETCO server and portal in future
shall be kept as per requirement.
iii. Empanelled agency shall ensure that Inverter should have provision of remote
monitoring of inverter data through sim card or through Wi-Fi. Required
website/mobile app platform, where the user (Consumer) can access the data,
should be provided/explained to consumer while installation by Empanelled
Agency. The facility of in-built wifi module or communication through sim-card
should also be explained to the consumer.
Recurring cost of sim card/Data pack for communication shall be borne by
consumers. All the inverter data should be made available to GETCO for monitoring
by giving web access by sharing the user ID and password. SIM-card cost, Periodic
data charges towards data pack and Internet/Wifi connectivity for maintaining
Remote Monitoring System shall be the responsibility of Beneficiary.
a) The bi-directional electronic energy meter (0.5S class) shall be installed for the
measurement of Import/Export of energy in co-ordination with GETCO.
b) Reverse power relay shall be provided by bidder (if necessary), as per the
INCHARGE AUTHORITY requirement.
A Roof Top Solar (RTS) Photo Voltaic (PV) system shall consist of following energy
i. Net meter: To record import and export units
ii. Generation meter: To keep record for total generation of the plant.
3.15. The installation of Generation meters including CTs & PTs, wherever applicable,
shall be carried out by the Empanelled Vendor as per the terms, conditions and
procedures laid down by the concerned GERC/GETCO.
11. POWER CONSUMPTION:
a) Regarding the generated power consumption, priority need to give for internal
consumption first and thereafter any surplus power can be injected in to the grid.
12. PROTECTIONS
The system should be provided with all necessary protections like earthing, Lightning,
and grid islanding as follows:
12.1. LIGHTNING PROTECTION:
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
i. The SPV power plants shall be provided with lightning & over voltage
protection, if required. The main aim in this protection shall be to reduce the
overvoltage to a tolerable value before it reaches the PV or other sub system
components. The source of over voltage can be lightning, atmosphere
disturbances etc.
ii. The entire space occupying the SPV array shall be suitably protected against
Lightning by deploying required number of Lightning Arrestors (LAs).
Lightning protection should be provided as per NFC17-102:2011/IEC
iii. The protection against induced high-voltages shall be provided by the use of
Metal Oxide Varistors (MOVs)/Franklin Rod type LA/Early streamer type LA.
iv. The current carrying cable from lightning arrestor to the earth pit should have
sufficient current carrying capacity according to IEC 62305. According to
standard, the minimum requirement for a lightning protection system
designed for class of LPS III is a 6 mm2 copper/ 16 mm2 aluminium or GI strip
bearing size 25*3 mm thick). Separate pipe for running earth wires of
Lightning Arrestor shall be used.
12.2. SURGE PROTECTION
i. Internal surge protection, wherever required, shall be provided.
ii. It will consist of three SPD type-II/MOV type surge arrestors connected from +ve
and –ve terminals to earth.
12.3. EARTHING PROTECTION
i The earthing shall be done in accordance with latest Standards.
ii. Each array structure of the PV yard, Low Tension (LT) power system, earthing grid for
switchyard, all electrical equipment, inverter, all junction boxes, etc. shall be grounded
properly as per IS 3043-2018.
iii. All metal casing/ shielding of the plant shall be thoroughly grounded in accordance
with CEA Safety Regulation 2010. In addition, the lightning arrester/masts should also be
earthed inside the array field.
iv. Earth resistance should be as low as possible and shall never be higher than 5 ohms.
v. separate three earth pits shall be provided for individual three earthing viz.: DC side
earthing, AC side earthing and lightning arrestor earthing.
12.4. GRID ISLANDING:
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
i. In the event of a power failure on the electric grid, it is required that any
independent power-producing inverters attached to the grid turn off
immediately. This prevents the DC-to-AC inverters from continuing to feed power
into small sections of the grid, known as “islands.” Powered islands present a risk
to workers who may expect the area to be unpowered, and they may also
damage grid-tied equipment. The Rooftop PV system shall be equipped with Anti
islanding features. In addition to disconnection from the grid (due to islanding
protection) disconnection due to under and over voltage conditions shall also be
ii. A manual disconnect 4 / 2 pole isolation switch (RCCB may also be used) beside
automatic disconnection to grid would have to be provided at utility end to
isolate the grid connection by the utility personnel to carry out any maintenance.
Cables of required size to be used in the system shall have the following characteristics:
i. Shall meet IEC 60227/IS 694, IEC 60502/IS1554 standards
ii. Temp. Range: –10°C to +80°C.
iii. Voltage rating 660/1000V
iv. Excellent resistance to heat, cold, water, oil, abrasion, UV radiation
vi. Sizes of cables between array interconnections, array to junction boxes, junction
boxes to Inverter etc. shall be so selected to keep the voltage drop (power loss)
of the entire solar system to the minimum. The cables (as per IS) should be
insulated with a special grade PVC compound formulated for outdoor use.
vii. Cable Routing/ Marking: All cable/wires are to be routed in a RPVC pipe/ GI cable
tray and suitably tagged and marked with proper manner by good quality ferule
or by other means so that the cable easily identified.
viii. The Cable should be so selected that it should be compatible up to the life of the
solar PV panels i.e. 25 years.
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
ix. The ratings given are approximate. All the cables required for the plant are to be
provided by the bidder. Any change in cabling sizes if desired by the
bidder/approved after citing appropriate reasons.
x. Multi Strand, annealed high conductivity copper conductor PVC type ‘A’ pressure
extruded insulation or XLPE insulation. Overall PVC/XLPE insulation for UV
protection Armoured cable for underground laying. All cable trays including covers
to be provided. All cables conform to latest edition of IEC/equivalent BIS Standards
as specified below: BoS item / component Standard Description Standard Number
Cables General Test and Measuring Methods, PVC/XLPE insulated cables for
working Voltage up to and including 1100 V,UV resistant for outdoor installation IS
/IEC 69947. Aluminium cable may be used on the AC-side of the PV system.
xi. The size of each type of DC cable selected shall be based on minimum voltage
drop however; the maximum drop shall be limited to 1%.
xii. The size of each type of AC cable selected shall be based on minimum voltage
drop however; the maximum drop shall be limited to 2 %.
14. CONNECTIVITY
The maximum capacity for interconnection with the grid at a specific voltage level shall
be as specified in the GERC regulation for Grid connectivity and norms of DISCOM and
amended from time to time.
15. DRAWINGS & MANUALS:
i. Operation & Maintenance manual/user manual, Engineering and
Electrical Drawings shall be supplied along with the each power plant. The manual shall
include complete system details such as array lay out, schematic of the system, inverter
details, working principle etc. Step by step maintenance and troubleshooting procedures
shall be given in the manuals and provided to the beneficiary.
ii. ISI marked (wherever applicable) and reputed makes equipment be used.
16. SOLAR PV SYSTEM ON THE ROOFTOP
The Solar PV system on the rooftop of the premises will be installed for PV
capacity permitted by GETCO as per regulation issued by GERC.
17. SAFETY MEASURES:
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
The bidder shall take entire responsibility for electrical safety of the installation(s)
including connectivity with the grid and follow all the safety rules & regulations
applicable as per Electricity Act, 2003 and CEA Safety Regulation 2010 etc.
18. DOCUMENTATION:
Operation & Maintenance manual / user manual shall be supplied along with each power
plant. The manual shall include complete system details such as array lay out, schematic
of the system, inverter details, working principle etc. Step by step maintenance and
troubleshooting procedures shall be given in the manuals and provided to the beneficiary.
19. SHADOW ANALYSIS:
The shadow analysis report with the instrument such as Solar Pathfinder or
professional shadow analysis software of each site has to be submitted by Bidder
and shall be his responsibility to educate the user to install the system only in
shadow free space. Lower performance of the system due to shadow effect shall
be the responsibility of the bidder and shall be liable for penalty for lower
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
Quality Certification, Standards and Testing for Grid-Connected Rooftop Solar PV
Systems/Power Plants
Solar PV Modules/Panels
IEC 61215 and Design Qualification and Type Approval for Crystalline Silicon Terrestrial
IS 14286 Photovoltaic (PV) Modules
IEC 61701:2011 Salt Mist Corrosion Testing of Photovoltaic (PV) Modules
IEC 61853- 1:2011 / Photovoltaic (PV) module performance testing and energy rating –:
IS 16170-1:2014 Irradiance and temperature performance measurements, and power
IEC 62716 Photovoltaic (PV) Modules – Ammonia (NH3) Corrosion Testing (as
per the site condition like dairies, toilets etc)
IEC 61730-1,2 Photovoltaic (PV) Module Safety Qualification – Part 1: Requirements
for Construction, Part 2: Requirements for Testing
IEC 62804 Photovoltaic (PV) modules – Test method for detection of potential-
induced degradation. IEC 62804-1: Part 1: Crystalline Silicon
Solar PV Inverters
IEC 62109 or Safety of power converters for use in photovoltaic power systems –
IS : 16221 Part 1: General requirements, and Safety of power converters for usein
photovoltaic power systems
Part 2: Particular requirements for inverters. Safety compliance
(Protection degree IP 65 or better for outdoor mounting, IP 54 or
better for indoor mounting)
IS/IEC 61683 latest Photovoltaic Systems – Power conditioners: Procedure for Measuring
(as applicable) Efficiency (10%, 25%, 50%, 75% & 90-100% Loading Conditions)
IEC 60068-2 /IEC Environmental Testing of PV System – Power Conditioners and
62093 Inverters
(as applicable)
IEC 62116:2014/ IS16169 Utility-interconnected photovoltaic inverters - Test procedure of
islanding prevention measures
IS/IEC 60947 (Part General safety requirements for connectors, switches, circuit breakers
1)Low-voltage Switchgear and Control-gear, Part 1: General rules
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
2)Low-Voltage Switchgear and Control-gear, Part 2: Circuit Breakers
3)Low-voltage switchgear and Control-gear, Part 3: Switches,
disconnectors switch-disconnectors and fuse-combination units
4) EN 50521: Connectors for photovoltaic system-Safety requirements
Low-voltage fuses - Part 6: Supplementary requirements for fuse-links
IEC 60269-6:2010 for the protection of solar photovoltaic energy systems
Solar PV Roof Mounting Structure
IS 2062/IS 4759/AA6063 T6 Material for the structure mounting
Surge Arrestors
BFC 17-102:2011/ NFC Lightening Protection Standard
IEC 60364-5-53/ IS Electrical installations of buildings - Part 5-53: Selection and erection
15086-5 (SPD) of electrical equipment - Isolation, switching and control
IEC 61643- 11:2011 Low-voltage surge protective devices - Part 11: Surge protective
devices connected to low-voltage power systems - Requirements
and test methods
IEC 60227/IS 694, IEC General test and measuring method for PVC (Polyvinyl chloride)
60502/IS 1554 (Part 1 & insulated cables (for working voltages up to and including 1100 V, and
2)/ IEC69947 (as UV resistant for outdoor installation)
Electric cables for photovoltaic systems (BT(DE/NOT)258), mainly for
BS EN 50618 DC Cables
Earthing /Lightning
IEC 62561/IEC 60634 IEC 62561-1: Lightning protection system components (LPSC) - Part:
Series (Chemical Requirements for connection components
earthing) IEC 62561-2: Lightning protection system components (LPSC) – Part 2:
(as applicable) Requirements for conductors and earth electrodes
IEC 62561-7: Lightning protection system components (LPSC) - Part 7:
Requirements for earthing enhancing compounds
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
Junction boxes and solar panel terminal boxes shall be of the thermo-
plastic type with IP 65 or better protection for outdoor use, and IP
IEC 60529 or better protection for indoor use
Guarantee and CMC: -
The Grid connected Solar Photovoltaic System for the project supplied, installed
and commissioned shall be guaranteed by the empanelled agency for a minimum
period of 5- years from the date of successfully commissioning of the last system,
in regard to quality of design, material, workmanship, quality of process/
manufacturing, performance, efficiency, installation, etc.
In the event any defect is found or developed in the system within guarantee
period, shall be rectified/replaced by the Empanelled Agency at his own expense
In case the defects are not rectified within 2 (Two) days of the receipt of the
complaint by the Empanelled Agency, GETCO shall have full liberty to rectify such
defect or undertake such repairs as may be necessary to restore the system in
working condition at the risk and cost of the Empanelled Agency.
The expenditure so incurred by GETCO shall be deducted from EOI applicant’s
pending claims, security, etc. and if necessary may be recovered in other mode
provided under the law. In the event of failure of the complete system, if necessary,
the whole system shall be replaced by the Empanelled Agency promptly.
(b) CMC: - Comprehensive Maintenance Contract for 5 years:- (Resolving
Complaints related to defects/ non-working / poor performance of the system)
This EOI Document cover Five-year Comprehensive Maintenance Contract under
the scope of EOI applicant.
The Five-year comprehensive Maintenance Contract shall include comprehensive
on-site guarantee and warranty for all materials and components of the system
under the project as mentioned above in para no 16(a) .
During this CMC period the Empanelled Agency has to repair/replace the defective
part/s or the material/s or any or all Components of the System to make it in
working condition without loss of performance or degradation in efficiency and
without compromising safety aspects free of cost within 48 (Fort eight) Hours of
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
time limit as soon as the complaint is received from the GETCO. Also the
Empanelled Agency has to undertake regular/periodical preventive maintenance
of the system to avoid any future fault in the system and to improve the solar yield.
During the CMC period, the inverter monitoring, monitoring and controlling, shall
be done by TENDER applicant. Hence necessary reports shall be submitted by the
tender applicant in the soft/hard copies periodically to the concern authority of
the GETCO as and when asked.
a) Logging of complain:
The record of each and every complaint received and resolve with down time
and up time shall have to be maintained by the Empanelled Agency in register
as well as computer based software and shall have to be submitted to GETCO
office In each quarter.
b) While doing repairing or rectification work, the Empanelled Agency’s
technician or any person is not authorized to work on GETCO’s electric line
having potential danger of electricity.
In case the defects are not rectified within 2 (Two) days from the receipt of the
complaint by empanelled agencies than penalty of Rs 200 per day is applicable till
the complaint is resolved.
This penalty shall be payable to GETCO, in case of empanelled agency failed to
pay the same, it will be recovered from the PBG or may be recovered in other
mode provided under the law. In the event of failure of the complete system, if
necessary, the whole system shall be replaced by empanelled agencies within
days failing which 0.5% per day plus GST and cess on the particular project value
subject to maximum of 10% of the project value plus applicable GST and cess to
be recovered from the PBG.
(C) Generation Guarantee:
The Capacity utilization factor CUF of the solar power plant shall not be less than
17% on annual basis, during the five CMC period. The Capacity Utilization factor (CUF)
shall be maintained at 17% and necessary efforts shall be made to achieve it by the
bidder. In case the system fails to attain the required CUF annually, the system shall be
deemed to underperforming. The calculation of the CUF shall be on the generation
recorded by the inverter/Solar system AC meter. The shortfall of energy to achieve 17%
CUF on the yearly bias shall be compensated by the bidder to GEDA at the rate
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
equivalent to the prevailing DISCOM tariff during the year. Failing which GEDA may
invoke the entire performance bank Guarantee. yearly
Periodical maintenance:
The record of down time and up time and periodical maintenance at least in every
quarter shall have to be maintained by the Empanelled Agency in register as well
as computer based software and shall have Mandatorily to be submitted to GETCO
Circle office at the end of every Quarter. Non submission of the report shall be
considered as “Breach of Contract” and shall attract punitive actions like
encashment of PBG will be applicable and the decision of GETCO shall be final in
Notices, Statements and other communications sent by GETCO through roistered post or
e-mail or fax to the tender applicant / Empanelled Agency at his specified address shall be
deemed to have been delivered to the TENDER applicant.
• Installation of remote Monitoring facility along with necessary dongle etc. for the period of
• The Scope of work covers cleaning and washing of the Photovoltaic modules regularly (Two
times in a month) to ensure annual capacity utilization factor of 17% during the five years
GUIDELINES FOR AGENCY:
1. It is mandatory for tender applicant to have valid test report of SPV Modules and
grid tie inverters with similar or larger capacity from MNRE approved laboratories.
2. The program implementation guidelines of the MNRE, as declared from time to
time, for SPV program shall be applicable and followed at all times.
3. The technical specification, scope of work for which tender Document is invited
are furnished in tender Document
4. The quantity mentioned in the tender Document is only indicative and not final.
Payment will be done only for the actual quantity executed.
5. Cost of Comprehensive Maintenance during Guarantee and warrantee period
and Insurance of system for 5 years is required to be included in the quoted
6. The Empanelled Agency shall be responsible for overall project management,
system integration and testing to complete all criteria for successful functioning
of the Grid connected Solar PV plant, but not limited to the functions laid down
in this documents.
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
SPECIAL CONDITIONS OF CONTRACT
1.0 GeneralParticulars
This part of the Bid Document relates to certain specific/special terms and conditions particular to
the Contract. The provisions herein are to be read and understood in conjunction with the relevant
provisions elsewhere in the Instructions to Bidders (ITB), the General Conditions of Contract (GCC)
and Erection Conditions of Contract (ECC). The intent of provisions herein are specific to this
contract and are, in general, supplementary to related provisions under ITB, GCC and ECC.
However, in certain provisions which are contrary to those in ITB, GCC and ECC, the provisions in
these Special Conditions of Contract will prevail.
2.2 The above cited requirements are only indicative. The owner reserves the right to requisition any
other relevant information and also reserves the right to reject the Bid proposal of any Bidder, if
in the Owner’s opinion the Qualification data is incomplete and Bidder is not qualified to perform
the Contract satisfactorily.
3.0 Bidding Costs
All costs/expenses in the preparation and submission of the Bid (including any post Bid
discussions/presentations) shall be fully borne by the Bidder. Owner will not be responsible/liable
for these costs irrespective of the course and conclusion of this Bidding.
B. BID DOCUMENTS
4.0 Details of Documents
4.1 The following Bid documents apart from Invitation to Bid detail the material and equipment
specifications/characteristics, the bidding procedures and the terms & conditions of contract:
a. Instructions to Bidders (ITB-Part I)
b. General Conditions of Contract (GCC-Part I)
c. Erection Conditions of Contract (ECC-Part I)
d. Special Conditions of Contract (SCC-Part I)
e. Technical Specifications (TSP-Part IIA)
f. Technical Data Sheets (TDS-Part IIB)
5.0 Knowing the Bid Documents
5.1 Every intending Bidder is to examine and understand all instructions, forms, terms, conditions and
specifications in the Bid Documents and fully know himself all the conditions and contents therein,
which may in any manner, affect the scope & content of work and the costs thereof. Submission
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
of a Bid not substantially responsive to the Bid Document in all respects and/or failure to furnish
all information required by the Bid Document may entail rejection of the Bid at the Bidder’s risk.
6.0 Clarifications on Bid Documents
6.1 In case an intending Bidder finds any discrepancy or omission in the documents and specifications
or is in doubt as to the true meaning of any part, he shall make a request, in writing not later than
the date of pre Bid discussion, to the owner in triplicate. The owner will issue explanations,
interpretations and clarifications as deemed fit in writing as a response to this request. On receipt
of such interpretations/clarifications, the Bidder may submit his Bid within the date and time
stipulated in the Bid invitation, All such explanations, interpretations and clarifications from the
Owner shall be deemed as part of Bid Documents and shall invariably accompany the Bidder’s
6.2 Any verbal/telephonic clarifications and information given by the Owner or his employee (s) or
his representative(s) will not in anyway be binding on the Owner.
7.0 Amendment of bidding document:
7.1 At any time prior to the deadline for submission of Bids the Owner may, for any reason, whether
at his own initiative or in response to a clarification requested by the intending Bidder, modify the
Bidding Document with amendment(s).
7.2 The amendment will be notified in writing or Fax /web site to all intending Bidders who have
received the Bidding Document at the address contained in the letter of request for issue of
bidding document from the Bidders. Owner will bear no responsibility or liability arising out of
non-receipt of the same in time or otherwise.
7.3 In order to afford prospective bidders reasonable time in which to take the amendment into
account in preparing their bids, the Owner may, at his discretion, extend the deadline for the
submission of bids.
7.4 Such amendments, clarifications etc. shall be binding on bidders and will be given due
consideration by the Bidders while they submit their bids and shall invariably enclose such
documents as a part of the bid.
C. PREPARATION OF BIDS
8.0 Language of Bid:
8.1 The Bid prepared by the Bidder and all correspondence and documents relating to the Bid,
exchanged by the Bidder and the Owner, shall be written in the English language, provided that
any printed literature furnished by the Bidder may be written in another language so long as
accompanied by an English translation of its pertinent passages. Failure to comply with this may
disqualify a bid. For purposes of interpretation of the bid, the English translation shall govern.
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
Bidders have to make the Bid in the formats furnished with this Document. Verbatim without
adding any printed/typewritten text of their own.
9.0 Local Conditions:
9.1 It will be imperative on each Bidder to fully inform himself of all local conditions and factors, which
may have any effect on the execution of the Contract covered under these documents and
specifications. The Owner shall not entertain any request for clarifications from the bidders,
regarding such local conditions.
9.2 It must be understood and agreed that such factors have properly been investigated and
considered while submitting the proposals. No claim for financial adjustment to the Contract
awarded under these specifications and documents will be entertained by the owner. Neither any
change in the time schedule of the Contract nor any financial adjustments arising thereof shall be
permitted by the Owner, which are based on the lack of such clear information or its effect on the
cost of the works to the Bidder.
10.0 Documents comprising the Bid:
etc. furnished in the Bidding Documents, indicating, for the services to be rendered, a brief
description of services, quantity and price.
10.2 The Bidder shall also submit documentary evidence to establish that the Bidder meets the
Qualification Requirements as detailed in Clause 2.0 above and Special Conditions of Contract
(including Clause 11 of I TB).
10.3 All Tender Documents/ formats are to be returned completed and filled in all respects and signed
by the Company Authorized Signatory wherever specified.
10.3 The Bid Guarantee shall be furnished in a separate cover in accordance with clause specific ITB.
11.0 Scope of the proposal
11.1 The Scope of the proposal shall be on the basis of a single Bidder’s responsibility, completely
covering all the equipment erection and other installation services specified under the
accompanying Technical Specifications. It will include among others as specified therein the
a) Pre-assembly, if any, erection, testing and commissioning of all the equipments.
b) Reliability tests and performance and guarantee tests on completion of commissioning.
11.2 As specified in the Special Conditions of Contract, no deviation whatsoever to certain conditions
of the bidding documents permitted by the Owner and therefore, the Bidders are advised that
while making Bid Proposals and quoting prices these conditions may appropriately be taken into
consideration. Bidders are required to furnish a certificate in this regard as per the format
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
provided in Special Conditions of Contract in a separate sealed envelope containing Bid security,
which shall accompany the Technical Bid. Any Bid not accompanied by such certificate shall be
rejected by the Owner and shall not be opened.
11.3 Bids not covering the above cited entire scope of works may be treated as incomplete and hence
11.4 The Bidder shall complete all the schedules & annexure in the Bid Proposal Sheets, Technical Data
Sheets and specified elsewhere. The Qualifying Data should be filled in the required schedule of
Bid Proposal Sheets.
12.0 Bid Price:
12.1 The Bidder shall indicate percentage above/below of total bid price indicated in the appropriate
furnish under the contract. The % above/below indicated shall be inclusive of all taxes and duties
applicable exclusive GST applicable on required inputs and services.
12.2 The Bidder shall specifically note that the Tenders are invited on percentage rate
12.3 If the Supplier/Contractor has opted for the Composition scheme of GST, the same must be
clearly specified with valid Declaration & Certificate from Department. In the event of
withdrawal/cessation of the Supplier from Composition scheme during the tenure of the
contract, the rate (i.e. price) mentioned in the price bid shall be final and any additional GST will
have to be borne by the tenderer himself. In no case additional amount towards GST or
otherwise will be paid / reimbursed to supplier/contractor. Further Statutory Variation clause
will not be applicable in case of Supplier / Contractor has opted for Composition Scheme under
Also, please mention separate applicable HSN / SAC Code and rate of GST and Cess as applicable
for each item of Goods/Service. If not specifically mentioned, then COMPANY will have the
option to take the prices as exclusive of taxes and duties at maximum higher slab rates for the
evaluation of the tenders.
The offered prices to be indicated in online mode of tender in the format given (i.e. Schedule-
B). The price bid submitted in physical mode shall not be considered.
Every bidder shall inform their GSTIN No. of the registered place(s) wherefrom the bidder intends
to supply the goods / services, meaning thereby the bidder has to supply the goods / services
from the relevant declared / registered place of supply only.
3.0 Price Basis:
13.1 The Price shall be quoted on firm basis.
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
13.2 The Price quoted by the bidder shall remain fixed during the bidder's performance of the contract
and shall not be subject to variation on any account saving for change in quantity. A bid submitted
with an adjustable price quotation shall be treated as non-responsive and rejected.
14.0 Taxes and Duties:
14.1 As regards the income Tax, surcharge on income tax and any other corporate tax, including service
tax at prevailing rate the owner shall not bear any tax liability whatsoever. The bidder shall be
liable and responsible for payment of such taxes as attracted under the provisions of the law.
14.2 Notwithstanding the tax liabilities as per the sub-clause14.1 above the owner shall have the right
to make deduction at source from the amounts payable to the contractor in respect of Income
Tax (on the cost of items of supply included in the works contract) as may be mandatory in terms
of the law. The owner shall not bear any liability in this regard but shall issue necessary certificate
in respect of such deduction made.
14.3 In case any tax or duty is newly introduced by the Government applicable for this contract with
effect from the next day of the date submission of the bid and if the contractor is required to pay
additional tax or duty, then the owner shall reimburse the contractor the additional tax or duty so
paid by the contractor against submission by the contractor of documentary evidence to the
satisfaction of the owner. This provision will not be applicable to transaction between the contractor
and his sub-contractors. Besides the said statutory variation, no other statutory variation shall be
payable by the owner.
14.4 The owner’s liability for Goods & Service Tax(GST) under the contract shall be limited to those
indicated by the Bidder in the Bid Proposal Sheets, subject to the statutory variations and
variations as per Clause No. 14.3.
If the cost to the Contractor during the performance of the ‘Contract’ shall be increased or
reduced by reasons of the making, passing or promulgation of any law after the date of submission
of bid or by any order, regulation or bye-law having the force of law the amount of such increase
or reduction shall be added to or deducted from the “Contract Price” as the case may be for direct
transactions between contactor & owner, and not for bought out items. It is the Bidders
responsibility to furnish details of taxes, duties, levies etc. applicable as on the date of submission
14.5 No claim for any increase towards the statutory variation regarding enhancement of existing tax
or duty or introduction of a new tax or duty applicable shall be entertained by the Owner during
the extended period of contract, if any, provided the extension of the contract is required by
causes attributable to the contractor.
14.6 The provision of statutory variation regarding enhancement of existing tax or duty or introduction
of a new tax or duty will be applicable only to the direct transaction between the contractor and
14.7 in addition, the conditions detailed under Special Conditions of Contract shall apply.
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
14.4 The validity of tender is 180 days from the date of opening of technical bid.
15.0 Time Schedule:
15.1 The basic consideration and the essence of the contract shall be strict adherence to the time
schedule for performing the specified works.
15.2 The Owner’s requirements of completion schedule for the Works are mentioned in the
accompanying Special Conditions of Contract.
15.3 The completion schedule as stated in the special conditions of contract shall be one of the major
factor in consideration of the bids.
16.0 Insurance:
The Bidder’s insurance liabilities pertaining to the scope of Works are detailed out in Clauses titled
Insurance, in General Terms and Conditions of Contract and in Erection Conditions of this Part-I.
Bidder’s attention is specifically invited to these clauses. Bid price shall include all the costs in
fulfilling all the insurance liabilities under the Contract.
17.0 Erection Tools and Tackles:
The Bidder under a separate schedule, in his proposal shall include a list of all-special equipment
tools & tackles etc. which he proposes to bring to site for the purpose of erection, handling, testing
and commissioning including performance and guarantee tests of the equipment. If any such
equipment is listed anywhere else in the proposal and not specially mentioned in the above
schedule, it shall be deemed to have been included in the Bidder’s proposed scope of supply.
18.0 Bid Security/EMD:
18.1: a) All the Bidders will be required to pay Tender Fees with applicable GST and
EMD as mentioned in the Tender document either in Cash (up to Rs. 10,000/- only) at
the office address specified in the tender document or by RTGS/ NET/online
i.) (c) Payment by Cheque/Coop Bank Guarantee/ Company Guarantee is not
(d) Validity Period: - The offer should be valid for a minimum period of 180 days from
the date of opening of Technical bid.
18.2 The bid security is required to protect the owner against the risk of Bidder’s conduct, which would
warrant the guarantee forfeiture, pursuant to relevant paras elsewhere The bid guarantee shall
be made payable to the Owner without any condition whatsoever.
18.3 The Owner will reject any bid not secured in accordance with Para 20.1 above, as non-responsive.
No exemptions are made in the furnishing of the security.
18.4 Unsuccessful Bidder’s bid security/EMD will be returned/refunded on finalization of tender or
three months from the date of submission of tender whichever is later.
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
18.5 The successful bidders, Bid Security will be discharged upon, furnishing the contract performance
18.6 The bid guarantee may be forfeited.
a) If a Bidder withdraws its bid during the period of bid validity specified by the bidder on
b) If a bidder refuses to accept the contract or fails to commence the works (including
supplies within thirty days of letter of award of contract)
21.0 1. All Nationalized Banks.
22.0 (B) Guarantees issued by following Banks will be accepted as SD /EMD for the period up to
March, 2026 Or the issuance of new Government Resolution on the same subject whichever is
earlier. The validity cut – off date in GR is with respect to date of issue of Bank Guarantee is
irrespective of date of termination of Bank Guarantee.
1. Axis Bank 2. AU Small Finance Bank
3. Bandhan Bank 4. BNP Paribas
5. City Union Bank 6. CSB Bank.
7. DBS Bank India Limited 8. DCB Bank
9. Equitas Small Finance Bank 10. Federal bank
11. HDFC Bank 12. HSBC Bank
13. ICICI Bank 14. IndusInd Bank
15. Karnataka Bank 16. Karur Vysya Bank
17. Kotak Mahindra Bank 18. South Indian Bank
19. Standard Chartered Bank 20. Tamilnadu Mercantile Bank
21. Utkarsh Small Finance Bank
22. The Kalupur Commercial Co-Operative Bank Ltd. 23. Ahmedabad Mercantile Co-Operative Bank Ltd.
24. Nutan Nagrik Sahakari Bank Ltd. 25. Rajkot Nagrik Sahakari Bank Ltd.
26. Saraswat Co-Operative Bank 27. SVC Co-Operative Bank Ltd.
28. The Gujarat State Co-Operative Bank 29. The Mehsana Urban Co-Operative Bank Ltd.
30. The Surat District Co-Operative Bank 31. The Surat Peoples Co-Operative Bank
32. Saurashtra Gramin Bank
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
19.0 Brand Names:
19.1 The specific reference in these specifications and documents to any material/equipment by brand
name makes or catalogue number shall be construed as establishing standards of quality and
performance and not as limiting competition. However, Bidders may offer other similar
material/equipment provided they meet the specified standard, design and performance
requirements. The Bidder shall furnish adequate technical information about such alternative
material equipment to enable the Owner to determine its acceptability. The Owner shall be the
sole judge on the acceptability or otherwise of such alternatively material/equipment.
19.2 The bidder shall note that standards for workmanship material and equipment, and reference to
brand name of catalogue numbers designed by the Owner in its Technical Specifications are
intended to be descriptive only and not restrictive. The Bidder may substitute alternative
standards, brand name and/or catalogue numbers in its bid, provided that it demonstrates to the
Owner’s satisfaction that the substitutions are substantially equivalent or superior to those
designed in the Technical Specification.
No Hard/Physical copy of technical Bid/Qualifying requirement documents and
Price/Commercial bid required in physical submission. Technical Bid and Price bid must be considering
from N-Code/Online only.
22.0 Signature of Bids:
22.1 The bid must contain the name, residence and place of business of the person or persons making
the bid and must be signed and sealed by the Bidder with his usual signature. The names of all
persons signing should also be typed or printed below the signature.
22.2 Bid by a partnership must be furnished with full names of all partners and be signed with the
partnership name; followed by the signature(s) and designation(s) or the authorized partner(s) or
other authorized representative(s).
22.3 Bids by Corporation/Company must be signed with the legal name of the Corporation/Company
by the President/Managing Director or by the Secretary or other person or persons authorized to
bid on behalf of such Corporation/Company in the matter.
22.4 A bid by a person who affixes to his signature the word ‘President’, ‘Managing Director’,
‘Secretary’, ‘Agent’ or other designation without disclosing his Principal will be rejected.
22.5 If it is found that two or more persons who are connected with one another either financially or
as a principal and agent have bid under different names without disclosing their connection then
such bids will be liable for rejection. Satisfactory evidence of authority of the person signing on
behalf of the Bidder shall be furnished with the bid.
22.6 The Bidder’s name stated on the proposal shall be the exact legal name of the firm.
22.7 Bids not conforming to the above requirements of signing may be disqualified and EMD forfeited.
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
24.0 Deadline for submission of bids:
24.1 The Bidders have the option of sending the bid by roistered post or submitting the bid in person.
Bids submitted by telex/telegram will not be accepted. No request from any Bidder to the Owner
to collect the proposals from airlines, cargo agent etc. shall be entertained by the Owner.
24.2 Bids must be received by the Owner at the address specified under Para 23.3, not later than the
time & date mentioned in the Invitation to Bid.
24.3 The Owner may, at its discretion, extend this deadline for the submission of bids by amending the
Bidding Document in which case all rights and obligations on the Owner and Bidders previously
subject to the deadline will thereafter be subject to the deadline as extended.
25.1 Any bid received by the Owner after the time and date fixed or extended for submission of bids
prescribed by the Owner, will be rejected and not considered for evaluation.
26.0 Modification and withdrawal of bids:
26.1 The Bidder may modify or withdraw its bid after the bid’s submission provided that written notice
of the modification or withdrawal is received by the Owner prior to the deadline prescribed for
submission of bids.
26.2 The Bidder’s modification or withdrawal notice shall be prepared, sealed, marked and dispatched
in accordance with the provisions of clause 23.0. The envelope should clearly indicate whether
the modification is for the Technical bid or the Price bid. No bid modifications notice by
Telex/Grams/Fax shall be entertained by the Owner.
26.3 No bid shall be modified in any manner, whatsoever subsequent to the deadline for submission
26.4 No bid may be withdrawn in the interval between the deadline for submission of bids and the
expiration of the period of bid validity specified by the Bidder on the Bid Form.
Withdrawal/modification of a bid during this interval may result in the Bidder’s forfeiture of its
27.0 Information required with the proposal:
27.1 The bids must clearly indicate the name of the manufacturer, the type and/or model of each
principal item of equipment proposed to be furnished and erected. The bid should also contain
drawings and descriptive materials indicating general dimensions, materials from which the parts are
manufactured, principles of operation, the extent of pre-assembly involved, major construction
equipment proposed to be deployed, method of erection and the proposed erection organizational
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
27.2 The above information shall be provided by the Bidder in the form of separate sheets, drawings,
catalogues, etc.
27.3 Any bid not containing sufficient descriptive material to describe accurately the equipment proposed
may be treated as incomplete and hence rejected. Such descriptive materials and drawings submitted
by the Bidder will be retained by the Owner. Any major departure from these drawings and
descriptive material submitted will not be permitted during the execution of the Contract without
specific written permission of the Owner.
27.4 Oral statements made by the Bidder at any time regarding quality, quantity or arrangement of the
equipment or any other matter will not be considered.
27.5 Standard catalogue pages and other documents of the Bidder may be used in the bid to provide
additional information and data as deemed necessary by the Bidder.
27.6 The Bidder, along with his Proposal, shall submit a list of recommended erection equipment and
materials which will be required for the purpose of erection of equipment and materials supplied
under the Contract.
27.7 In case the ‘Proposal’ information contradicts specification requirements, the specification
requirements will govern, unless otherwise brought out clearly in the technical commercial
deviation schedule.
E. BID OPENING AND EVALUATION
Technical and Price bid will be open ‘online’ only through n-code Only.
28.0 Purpose of evaluation of bids:
29.1 The Bids received/accepted/opened will be evaluated by the Owner to ascertain the technical
responsiveness of the bid for the complete scope of the proposal, as covered under these specifications
and documents. All technically responsive bids shall then be examined to determine the LOWEST
EVALUATED COMMERCIALLY AND TECHNICALLY RESPONSIVE BIDS.
29.0. Policy for bids under consideration:
29.1 Bids shall be deemed to be under consideration immediately after opening of Technical Bid and until
such time official intimation of award/rejection is made by the Owner to the Bidders. While the Bids are
under consideration, Bidders and/or their representatives and other interested parties are advised to
refrain from contacting by any means, the owner and/or his employee’s representatives on the matters
related to Bids under consideration.
29.2 Clarification of bids:
To assist in the examination evaluation and comparison of Bids the owner may on his own ask the
Bidder for a clarification of its bid. The request for clarification and the response shall be in writing
and no change in the price or substance of the bid shall be sought, offered or permitted.
30.0 Preliminary Examination:
30.1 The Owner will examine the bids to determine whether they are complete, whether any
computational errors have been made, whether required sureties have been furnished, whether
the documents have been properly signed, and whether the bids are generally in order.
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
31.2 Arithmetical errors will be rectified on the following basis:
If there is a discrepancy between the unit price and the total price that is obtained by multiplying
the unit price and quantity, the unit price shall prevail and the total price shall be corrected. If
there is a discrepancy between the total bid amount and the sum of total costs, the latter shall
prevail and the total bid amount will be corrected accordingly. If there is a discrepancy between
words and figures, the amount advantageous to the Owner will prevail. If the Bidder does not
accept the correction of the errors as above, his Bid will be rejected and the amount of Bid Security
consistent with each other. In the case of any inconsistency in the prices furnished in the specified
prices schedules to be identified in Bid Form for this purpose, the Owner shall be entitled to
consider the highest price for the purpose of evaluation and for the purpose of award of Contract
use the lowest of the prices in these schedules.
31.3 Prior to the detailed evaluation, the Owner will determine the substantial responsiveness of each
bid to the Bidding Document. For purpose of these Clauses, a substantially responsive bid is one,
which conforms to all the terms and conditions of the Bidding Document without material
deviations. A material deviation is one which affects in any way the prices, quality, quantity or
delivery period of the equipment, completion of works or which limits in any way the
responsibilities or liabilities of the Bidder of any right of the Owner as required in these
specifications and documents. The Owner’s determination of a bid’s responsiveness shall be
based on the contents of the bid itself without recourse to extrinsic evidence.
31.4 A bid determined as not substantially responsive will be rejected by the Owner and may not
subsequently be made responsive by the Bidder by correction of non-conformity.
31.5 The Owner may waive any minor informality or non-conformity or irregularity in a bid which does
not constitute a material deviation, provided such waiver does not prejudice or affect the relative
ranking of any Bidder.
31.0 Evaluation of Price Bids:
32.1 Definitions and Meanings:
For the purpose of the evaluation and comparison of bids, the following meanings and definition
a) ‘Bid Price’ shall mean the price quoted by each Bidder in his proposal for the complete scope
d) ‘Evaluated Bid Price’ shall be summation of ‘Bid Price’, ‘Differential Price’ and ‘Cost
Compensation for Deviations.’
33.0 Calculation of differential Price & Cost Compensation for Deviations.
The Differential Price to be added to the Bid Price of each bid during evaluation and comparison
shall be derived as under:
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
Differential Price (DP)=n1F1+n2F2…..+nnFn, where F1, F2…..Fn are the various factors in Indian
Rupees per unit of parameter differential or deficiency in the equipment and services offered as
stipulated in these specifications: n1, n2…nn are the respective parameter differential or
deficiency in the corresponding units to be determined from the Bidder’s proposal. The above
factors and corresponding units of parameter differential are derived from the Technical
Specifications, Data sheets and/or Special Conditions of Contract.
Deviations from the Bidding Documents in so far as practicable will be converted to a Rupee value
(D) and from the Bidding Document while evaluating the bids. In determining the Rupee value of
the deviations the Owner will use parameters consistent with those specified in the specifications
and documents and or other information as necessary and available to the Owner.
33.1 Comparison of Bids
The bids shall be compared on the basis of lump sum prices (i.e., for erection services to be
rendered as quoted by the Bidder) for the entire scope of the proposal as defined in the Bidding
For comparison purposes all the evaluated bid prices shall be in Indian Rupees as under:
W = Total Comparison Price
Q = Bid Price quoted by the bidder in Indian Rupees (Value Of erection cost including other
components if any.)
DP = Different price in Indian Rupees calculated as above
D = Cost compensation for deviations calculated as above.
All evaluated bid prices of all the bidders shall be compared among themselves to determine the lowest
evaluated bid and, as a result of this comparison, the lowest bid will be selected for the award of the
F. AWARD OF CONTRACT
34.0 Award Criteria
34.1 The owner will award the contract to the successful Bidder, whose bid has been determined to
be substantially responsive and has been determined as the lowest evaluated bid, providing
further that the Bidder is determined to be qualified to perform the contract satisfactorily. The
Owner shall be the sole judge in this regard.
34.2 Further, the Owner reserves the right to award separate contracts to two or more parties in line
with the terms and conditions specified in the accompanying Technical Specifications.
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
35.0 Owner’s right to accept any bid and to reject any or all bids:
35.1 The Owner reserves the right to accept or reject any bid, and to annual the bidding process and
reject all bids at time prior to award of contract, any without thereby incurring any liability to the
affected Bidder or Bidders or any obligation to inform the affected Bidder or Bidders of the
grounds for the Owner’s action.
36.0 Notification of award:
36.1 Prior to the expiration of the period of bid validity and extended validity period, if any, the Owner
will notify the successful Bidder in writing by registered letter or cable or telex or FAX, to be
confirmed in writing by reAIStered letter, that its bid has been accepted.
36.2 The notification of award will constitute the formation of the Contract.
37.0 Signing of contract:
37.1 At the same time as the Owner notifies the successful Bidder that his bid has been accepted, the
Owner will send the Bidder the detailed of Award, incorporating all agreements between the
37.2 Within 15 days of receipt of the detailed of Award, the successful bidder shall sign the same with
date and return it to the Owner.
37.3 The Bidder will prepare the Contract Agreement as per the Performa prescribed and the same will
be signed within 15 (Fifteen) days of notification of Award.
38.0 Contract Security deposit:
38.1 As a contract Security deposit, the successful bidder, to whom the work is awarded, shall be
required to furnish a SD in form of Bank guarantee/DD from a Public Sector Indian
bank/Scheduled, Commercial Bank in the form to be furnished. The SD amount shall be equal to
5 percent (5%) of the Contract price and it shall guarantee the faithful performance of the
Contract in accordance with the terms and conditions specified in these documents and
specifications. the SD shall be valid up to 90 days after the end of Work Completion Period.
Note : Performance Guarantee for 5 years –CMC :
You have to Submit 20% of the order value against the equivalent amount of performance bank
guarantee/ Demand draft valid for a period of 5 years from the date of commissioning of the
system. (date of meter Installation).
38.2 The Performance Guarantee shall cover additionally the following guarantees to the
a) The successful Bidder guarantees the successful and satisfactory operation of the equipment
furnished and erected under the Contract, as per the specifications and documents.
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
b) The successful Bidder further guarantees that the equipment provided by him/his sub-vendors
and installed by him shall be free from all defects in design, material and workmanship and
shall upon written notice from the Owner fully remedy free of expenses to the Owner such
defects as developed under the normal use of the said equipment within the period of
guarantee specified in the relevant clause of the General Terms and Conditions in the Part-
I/Special Conditions of Contract.
38.3 The Contract Performance Guarantee is intended to secure the performance of the entire
contract. However, it is not to be construed as limiting the damages under clause entitled
“Equipment Performance Guarantee” in Technical Specifications, Part-II and damages stipulated
in other clauses in the Bid documents.
38.4 The performance guarantee will be discharged without any interest at the end of guarantee
period, unless otherwise specified in Special Conditions of Contract.
GENERAL TERMS & CONDITIONS OF CONTRACT
A. INTRODUCTION
1.0 DEFINITION OF TERMS
1.1 The ‘Contract’ means the agreement entered into between the Owner and the Contractor as per
the Contract Agreement signed by the parties, including all attachments and appendices thereto
and all documents incorporated by reference therein.
1.2 ‘Owner’ shall mean the Superintending Engineer (TR.) Palanpur or any of its subsidiaries and shall
include its legal representatives, successors and assigns.
1.3 ‘Contractor’ shall mean the Bidder whose bid is accepted by the Owner for the award of the Works
and shall include such successful Bidder’s legal representatives, successors and permitted assigns.
1.4 ‘Engineer’ shall mean the officer appointed in writing by the Owner to act as Engineer from time
to time for the purpose of the Contract.
1.5 The terms ‘Equipment’, ‘Stores’ and ‘Materials’ shall mean and include equipment, stores and
materials to be provided by the Contractor under the Contract.
1.6 ‘Works’ shall mean and include the furnishing of equipment, labour and services, as per the
Specifications and complete erection, testing and putting into satisfactory operation including all
transportation, handling, unloading and storage at the Site as defined in the Contract.
1.7 ‘Specifications’ shall mean the Specifications and Bidding Document forming a part of the Contract
and such other schedules and drawings as may be mutually agreed upon.
1.8 Site’ shall mean and include the land and other places on, into or through which the works and
the related facilities are to be erected or installed and any adjacent land, paths, street or
reservoir which may be allocated or used by the Owner or Contractor in the performance of the
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
1.9 The term ‘Contract Price’ shall mean the lump-sum price quoted by the Contractor in his bid with
additions and/or deletions as may be agreed and incorporated in the Letter of Award and the
contract agreement for the entire scope of the works.
1.12 The term ‘Erection Portion’ of the Contract price shall mean the value of field activities of the
works including erection, testing and putting into satisfactory operation including successful
completion of performance and guarantee tests to be performed at Site by the Contractor
including cost of insurances.
1.13 Site Engineer ‘Inspector’ shall mean the owner’s Engineers or any person nominated by the time
to inspect the equipment; stores or Works under the Contract and/or the duly authorized
representative of the Owner.
1.14 ‘Notice of Award of Contract’/’Letter of Award’/’Telex of Award’ shall mean the official notice
issued by the Owner notifying the Contractor that his bid has been accepted.
1.16 ‘Order’ shall mean the official letter issued by the Owner informing the acceptance of the bid.
1.17 ‘Date of Contract’ shall mean the date on which letter of commencement of work issued by the
respective sub division deputy engineer.
1.18 ‘Month’ shall mean the calendar month. ‘Day’ or ‘Days’ unless herein otherwise expressly defined
shall mean calendar day or days of 24 hours each.
A ‘Week’ shall mean continuous period of seven (7) days.
1.19 Writing’ shall include any manuscript, type written or printed statement, under or over signature
and/or seal as the case may be.
1.20 When the words ‘Approved’, ‘Subject to Approval’, ‘Satisfactory’, ‘Equal to’, ‘Proper’, ‘Requested’,
‘As Directed’, ‘Where Directed’, ‘When Directed’, ‘Determined by’, ‘Accepted’, ‘Permitted’, or
words and phrases of like importance are used the approval, judgment, direction etc. is
understood to be a function of the Owner/Engineer.
1.21 Test on completion shall mean such tests as prescribed in the Contract to be performed by the
Contractor before the work is taken over by the Owner.
1.22 ‘Performance and Guarantee Tests’, shall mean all operational checks and tests required to
determine and demonstrate capacity, efficiency, and operating characteristics as specified in the
Contract Documents.
1.23 The term ‘Final Acceptance’/‘Taking Over’ shall mean the Owner’s written acceptance of the
Works performed under the Contract, after successful commissioning/completion of
Performance and Guarantee Tests, as specified in the accompanying Technical Specifications or
otherwise agreed in the Contract.
1.25 ‘Latent Defects’ shall mean such defects caused by faulty designs, material or work-man- ship
which cannot be detected during inspection, testing etc, based on the technology available for
carrying out such tests.
1.26 ‘Codes’ shall mean the following including the latest amendments and/or replacements, if any :
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
a) Indian Electricity Act, 1905 and Rules and Regulations made there under.
b) Electricity Act 2003 and Rules & Regulations made there under.
c) Indian Factory Act, 1948 and Rules and Regulations made there under.
d) Indian Explosives Act, 1884 and Rules and Regulations made there under.
e) Indian Petroleum Act, 1934 and Rules and Regulations made there under.
f) A.S.M.E. Test Codes.
g) A.I.E.E. Test Codes.
h) American Society of Materials Testing Codes.
i) Standards of the Indian Standards Institution.
j) Other Internationally approved standards and/or rules and regulations touching the subject
matter of the Contract.
1.28 Words imparting the singular only shall also include the plural and vice –versa where the context
1.29 Words imparting ‘Person’ shall include firms, companies, corporations and associations or bodies
of individuals, whether incorporated or not.
2.0 APPLICATION
These General Conditions shall apply to the extent that they are not super ceded by provisions in
other parts of the Contract.
5.0 CONTRACT DOCUMENTS
5.1 The term Contract Documents shall mean and include the following which shall be deemed to
form an integral part of the Contract:
a) Invitation to Bid including letter forwarding the Bidding Documents, Instructions to Bidders,
General Terms and Conditions of Contract, the Special Conditions of Contract. and all other
documents included under Part-I, Part-II and Part-III .
b) Specifications of the erection of the equipments and other technical services to be provided
under the Contract as brought out in the accompanying Technical Specifications.
c) Contractor’s Bid Proposal and the documents attached there to including the letters of
clarifications thereto between the Contractor and the Owner prior to the Award of Contract
except to the extent of repugnancy.
d) Letter of Award and any agreed variations of the conditions of the documents and special
terms and conditions of Contract, if any.
5.2 In the event of any conflict between the above mentioned documents the matter shall be referred
to the Engineer whose decision shall be considered as final and binding upon the parties.
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
6.0 USE OF CONTRACT DOCUMENTS AND INFORMATION
6.1 The Contractor shall not, without the Owner’s prior written consent, disclose the Contract, or any
provision thereof, or any specification, plan, drawing, pattern, sample or information furnished
by or on behalf of the Owner in connection therewith, to any person other than a person
employed by the Contractor in the performance of the Contract. Disclosure to any such employed
person shall be made in confidence and shall extend only so far as may be necessary for the
purpose of such performance.
6.2 The Contractor shall not, without the Owner’s prior written consent, make use of any document
or information enumerated in various Contract documents except for the purpose of performing
6.3 The Contractor shall not communicate or us in advertising, publicity, sales releases or in any other
medium, photographs or other reproduction of the Works under this Contract, or descriptions of
the site, dimensions, quantity, quality or other information, concerning the works unless prior
written permission has been obtained from the Owner.
6.4 Any document, other than the Contract itself, enumerated in various Contract documents shall
remain the property of the Owner and shall be returned (in all copies) to the Owner on completion
of the Contractor’s performance under the Contract if so required by the Owner.
7.0 CONSTRUCTION OF THE CONTRACT
7.1 Notwithstanding anything stated elsewhere in the bid documents, the Contract to be entered into
will be treated as a single Contract. Award shall be placed on the successful Bidder as follows:
For providing services like inland transportation, insurance for delivery at site, unloading, storage,
handling at site, installation, testing and commissioning including performance testing in respect
of all the equipment material equipment/materials given by the owner after observing standard
store procedures for transport from owner’s stores, insurance, unloading storage handling at site
installation testing & commissioning.
7.2 In case erection Contract, or where the Owner hands over his equipment to the Contractor for
executing, then the Contractor shall at the time of taking delivery of the equipment/dispatch
documents be required to execute an Indemnity Bond in favor of the Owner in the form
acceptable to the SE (TR) Palanpur for keeping the equipment in safe custody and to utilize the
same exclusively for the purpose of the said Contract. Samples of Performa for the Indemnity
Bond will be furnished during award of Contract.
7.3 The Contract shall in all respects be construed and governed according to Indian Laws.
7.4 It is clearly understood that the total consideration for the Contract(s) has been broken up into
various components only for the convenience of payment under the Contract(s) and for the
measurement of deviations or modifications under the Contract(s).
8.0 JURISDICTION OF CONTRACT
8.1 The laws applicable to the Contract shall be the laws in force in India. The Courts of Palanpur shall
have exclusive jurisdiction in all matters arising under this Contract.
9.0 EXECUTION OF CONTRACT:
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
9.1 The Owner, after the issue of the Letter of Award to the Contractor, will send one copy of the final
agreement to the Contractor for his scrutiny and approval.
9.2 The Agreement, unless otherwise agreed to, shall be signed within 30 days of the acceptance of
the Letter of Award, at the office the Owner at Palanpur on a date and time to be mutually agreed.
The Contractor shall provide for signing of the Contract, Performance Guarantee, appropriate
power of attorney and other requisite materials. In case the Contract is to be signed beyond the
stipulated time, the Bid Guarantee submitted with the Proposal will have to be extended
9.3 The Agreement will be signed in copies to be specified and the Contractor shall be provided with
one signed original and the rest will be retained by the Owner.
9.4 Subsequent to signing of the Contract, the Contractor at his own cost shall provide the Owner
with copies of agreement within fifteen (15) days after the signing of the Contractor.
10.0 ENFORCEMENT OF TERMS
10.1 The failure of either party to enforce at any time any of the provisions of this Contract or any rights
in respect thereto or to exercise any option therein provided, shall in no way be construed to be a
waiver of such provisions, rights or options or in anyway to affect the validity of the Contract. The
exercise by either party of any of its rights herein shall not preclude or prejudice either party from
exercising the same or any other right it may have under the Contract.
11.0 COMPLETION OF CONTRACT
The time limit for completion of entire work is 03 Months from the date of issue of work order.
The time allowed for completion the work is as specified in the sub-order placed by concern
division of GETCO from the date of the commencement of the work, failing which the penalty ½%
per week as applicable or part thereof on delayed portion of work and / or supply value subject
to ceiling of 10% of the total contract value as applicable will be imposed.
14.0 PENALTY FOR DELAY
The time limit allowed for carrying out the work as entered in the tender shall strictly observed
by the contractor and shall be reckoned from the date on which the order to commerce the work
is given to the contractor .The work shall throughout the stipulated period of contract the
proceeds with due diligence (time being deemed to be essence of contract ) and for delay, the
contract shall pay compensation ,an amount equal to half percent per one week for the delayed
portion of work or such smaller amount as per the decision of the competent authority of the
GETCO as applicable.
However, the total amount of compensation to be paid by the contractor, under the provision of
However, the total amount of compensation to be paid by the contractor, under the provision of
the clauses shall not exceed 10 percent of the amount of contract value ad decided by the
competent authority of the GETCO. The penalty will be invariably deducted from the bills of the
contract and no refund will be given unless the competent authorities approves the reduction the
reason the delay attributable to GETCO as well as to party will be brought out clearly while putting
the proposal for waiver reduction in penalty
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
In event of failure of the Contractor to pay the amount of Penalty as demanded the Owner shall
be entitled to deduct the amount of Penalty for delay from the amounts payable to the
Contractors under any bills raised under this contract of any other amount payable under any
other contract with the GUVNL and its Subsidiary Companies i.e. GETCO, GUVNL, GSECL,
MGVCL, DGVCL, PGVCL, UGVCL. It is permissible for the Owner to adjust the amount of Penalty
of delay against any Bank Guarantee furnished by the Contractor under this contract or any other
contract with GUVNL and / or its subsidiary companies
16.0 TAXES, PERMITS & LICENCES
The Contractor shall be liable and pay all non-Indian taxes, duties, levies lawfully assessed against
the Owner or the Contractor in pursuance of the Contract. In addition, the Contractor shall be
responsible for payment of all Indian duties, levies and taxes lawfully assessed against the
Contractor for his personal income & property only.
18.0 DEFENCE OF SUITS
If any action in court is brought against the Owner or Engineer or an officer or agent of the Owner,
for the failure, omission or neglect on the part of the Contractor to perform any acts, matters,
covenants or things under the Contract, or for damage or injury caused by the alleged omission
or negligence on the part of the Contractor, his agents, representatives or his Sub-Contractors, or
in connection with any claim based on lawful demands of Sub-Contractors, workmen, suppliers
or employees, the Contractor shall in all such cases indemnify and keep the Owner, and the
Engineer and/or his representative, harmless from all losses, damages, expenses or decrees
arising of such action.
20.0 LIMITATION OF LIABILITIES
The final payment by the Owner in pursuance of the Contract shall mean the release of the
Contractor from all his liabilities under the Contract. Such final payment shall be made only at
the end of the Guarantee/Warranty period or after finalization of material account and final bill
and till such time as the Contractual liabilities and responsibilities of the Contractor, shall prevail.
All other payments made under the Contract shall be treated as on-account payments.
21.0 ENGINEER’S DECISION
21.1 In respect of all matters which are left to the decision of the Engineer including the granting or
with-holding of the certificates, the Engineer shall, if required to do so by the Contractor, give in
writing a decision thereon.
21.2 If, in the opinion of the Contractor, a decision made by the Engineer is not in accordance with the
meaning and intent of the Contract, the Contractor may file with the Engineer, within fifteen (15)
days after receipt of the decision, a written objection to the decision.
Failure to file an objection within the allotted time will be considered as an acceptance of the
Engineer’s decision and the decision shall become final and binding.
21.3 The Engineer’s decision and the filing of the written objection thereto shall be a condition
precedent to the right to request arbitration. It is the intent of the Agreement that there shall be
no delay in the execution of the works and the decision of the Engineer as rendered shall be
promptly observed.
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
22.0 POWER TO VARY OR OMIT WORK
22.1 No alterations, amendments, omissions, suspensions or variations of the Works (hereinafter
referred to as ‘variation’) under the Contract as detailed in the Contract Documents, shall be made
by the Contractor except as directed in writing by the Engineer, but the Engineer shall have full
powers subject to the provisions hereinafter contained, from time to time during the execution
of the Contract, by notice in writing to instruct the Contractor to make such variation without
prejudice to the Contract. The Contractor shall carry out such variation and be bound by the same
conditions as far as applicable as though the said variations occurred in the Contract Documents.
If any suggested variations would, in the opinion of the Contractor, if carried out, prevent him
from fulfilling any of his obligations or guarantees under the Contract, he shall notify the Engineer
thereof in writing and the Engineer shall decide forthwith whether or not, the same shall be
carried out and if the Engineer confirms his instructions, the Contractor’s obligations and
guarantees shall be modified to such an extent as may be mutually agreed. Any agreed difference
in cost occasioned by any such variation shall be added to or deducted from the Contract Price as
the case may be.
22.2 In the event of Engineer requiring any variation, a reasonable and proper notice shall be given to
the Contractor to enable him to work his arrangement accordingly, and in cases where goods or
materials are already prepared or any design, drawings or pattern made or work done as per the
contract requires to be altered, a reasonable and agreed sum in respect thereof shall be paid to
the Contractor.
22.3 In any case in which the Contractor has received instructions from the Engineer as to the
requirement of carrying out the alterations or additional or substituted work which either then or
later on, will in the opinion of the Contractor, involve a claim for additional payment, the
Contractor shall immediately and in no case later than thirty (30) days, after receipt of the
instructions aforesaid and before carrying out the instructions, advise the Engineer to that effect.
But the Engineer shall not become liable for payment of any charges in respect of any such
variations, unless the instructions for the performance of the same shall be confirmed in writing
by the Engineer.
22.4 If any variation in the Works results in reduction of Contract Price, the parties shall agree, in
writing, so to the extent of any change in the price, before the Contractor proceeds with the
22.5 In all the above cases, in the event of a disagreement as to the reasonableness of the said sum,
the decision of the Engineer shall prevail.
22.6 Notwithstanding anything stated above in this clause, the Engineer shall have the full power to
instruct the Contractor, in writing, during the execution of the Contract to vary the quantities of
the items or groups of items in accordance with the provisions of clause entitled ‘Change of
Quantity’ in section GCC of this Volume-I. The Contractor shall carry out such variations and be
bound by the same conditions as though the said variations occurred in the Contract Documents.
However, the Contract Price shall be adjusted at the rates and the prices provided for the original
quantities in the Contract.
24.0 CHANGE OF QUANTITY
24.1 During the execution of the Contract, the Owner reserves the right to increase or decrease the
quantities of items under the Contract but without any change in unit price or other terms &
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
conditions. Such variations unless otherwise specified in the accompanying Special Conditions of
Contract and/or Technical Specifications, shall not be subjected to any limitation for the individual
items but the total variations in all such items under the Contract shall be limited to a percentage
of the Contract price as specified in the Special Conditions of Contract.
24.2 The Contract price shall accordingly be adjusted based on the unit rates available in the Contract
for the change in quantities as above. The base unit rates, as identified in the Contract shall
however remain constant during the currency of the Contract, except as provided for in Clause
33.0 below. In case the unit rates are not available for the change in quantity, the same shall be
subjected to mutual agreement.
26.0 COOPERATION WITH OTHER CONTRACTORS AND CONSULTING ENGINEERS
The Contractor shall agree to cooperate with the Owner’s other Contractors and Consulting
Engineers and freely exchange with them such technical information as is necessary to obtain the
most efficient and economical design and to avoid unnecessary duplication of efforts. The
Engineer shall be provided with three copies of all correspondence addressed by the Contractor
to other Contractors and Consulting Engineers of the Owner in respect of such exchange of
technical information, wherever needed.
27.0 NO WAIVER OF RIGHTS
Neither the inspection by the Owner or the Engineer or any of their officials, employees, or agents
nor any order by the Owner or the Engineer for payment of money or any payment for or
acceptance of, the whole or any part of the Works by the Owner or the Engineer, nor any
extension of time, nor any possession taken by the Engineer shall operate as a waiver of any
provision of the Contract, or of any power herein reserved to the Owner or any right to damages
herein provided nor shall any waiver of any breach in the Contract be held to be a waiver of any
other or subsequent breach.
28.0 CERTIFICATE NOT TO AFFECT RIGHT OF OWNER AND LIABILITY OF THE CONTRACTOR.
No interim payment certificate of the Engineer, nor any sum paid on account by the Owner, nor
any extension of time for execution of the Works granted by the Engineer shall affect or prejudice
the rights of the Owner against the Contractor or relieve the Contractor of his obligation for the
due performance of the Contract, or be interpreted as approval of the Works done or of the
equipment furnished and no certificate shall create liability for the Owner to pay for alterations,
amendments, variations or additional works not ordered, in writing , by the Engineer or discharge
the liability of the Contractor for the payment of damages whether due, ascertained, or certified
or not or any sum against the payment of which he is bound to indemnify the Owner, nor shall
any such certificate nor the acceptance by him of any sum paid on account or otherwise affect or
prejudice the rights of the Owner against the Contractor.
29.0 PROGRESS REPORTS
During the various stages of the work in pursuance of the Contract, the Contractor shall at his own
cost submit periodic progress reports as may be reasonably required by the Engineer with such
materials as, charts, net-works, photographs, test certificates, etc. Such progress reports shall be
in the form and size as may be required by the Engineer.
30.0 TAKING OVER
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
Upon successful completion of all the tests to be performed at Site on equipment furnished and
erected by the Contractor, the Engineer shall issue to the Contractor a Taking Over Certificate as
a proof of the final acceptance of the equipment. Such certificate shall not unreasonably be
withheld nor will the Engineer delay the issuance thereof on account of minor omissions or
defects which do not affect the commercial operation and/or cause any serious risk to the
equipment. Such certificate shall not relieve the Contractor of any of his obligations which
otherwise survive, by the terms and conditions of the Contract after issue of such certificate.
32.1 The payment to the Contractor for the performance of the works under the Contract will be made
by the Owner as per the guidelines and conditions specified herein. All payments made during the
Contract shall be on account payments only. The final payment will be made on completion of all
Works and on fulfilment by the Contractor of all his liabilities under the Contract.
32.2 Currency of Payment
All payments under the Contract shall be in Indian Rupees only.
Payment terms will be as prescribed in the special conditions of contract and on fulfilment of
conditions specified thereof.
34.3 Mode of Payment
34.4 Payment made by GETCO through RTGS only directly to Owner’s Bank or directly to the Contractor
Bank account as per the payment schedule.
34.5 The payment of test charges, if any, payment, taxes and duties (whenever admissible) inland
transportation (including port handling), insurance and the erection portion of the Works shall be
made direct to the Contractor by the Owner.
34.6 All payments under the Contract shall be made as stipulated in the Special Conditions of Contract
after signing the Contract Agreement. The payments linked with the dispatch of materials shall
only be made after production of all dispatch documents as specified in the relevant Contract
conditions which will interalia include the Material Inspection Clearance Certificate issued by the
Progressive payments linked with erection shall only be made after the issue of certificates by the
Engineer, one for the quantum of work completed and the other for the successful completion of
quality check points involved in the quantum of work billed.
35.0 DEDUCTIONS FROM CONTRACT PRICE
All costs, damages or expenses that the Owner may have paid, for which under the Contract the
Contractor is liable, or any other retention award will be claimed by the Owner. The Owner to the
Contractor shall bill all such claims regularly as and when they fall due. Such bills shall be
supported by appropriate and certified vouchers or explanations, to enable the Contractor to
properly identify such claims. Such claims shall be paid by the Contractor within thirty (30) days
of the receipt of the corresponding bills and if not paid by the Contractor within the said period,
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
the Owner may then deduct the amount, from any monies due or becoming due by him to the
Contractor under the Contract or may be recovered by sections of Law or otherwise.
D. RISK DISTRIBUTION
37.1 The Contractor at his cost shall arrange, secure and maintain all insurance as may be pertinent to
the Works and obligatory in terms of law to protect his interest and interests of the Owner against
all perils detailed herein. The form and the limit of such insurance as defined herein together
with the under-writer in each case shall be acceptable to the Owner. However, irrespective of
such acceptance, the responsibility to maintain adequate insurance coverage at all time during
the period of Contract shall be of Contractor alone. The Contractor’s failure in this regard shall
not relieve him of any of his contractual responsibilities and obligations. The insurance covers to
be taken by the Contractor shall be in the joint name of the Owner and the Contractor. The
Contractor shall, however, be authorized to deal directly with Insurance Company or Companies
and shall be responsible in regard to maintenance of all insurance covers. Further the insurance
should be in freely convertible currency.
37.2 Any loss or damage to the equipment during handling, transportation, storage, erection, putting
into satisfactory operation and all activities to be performed till the successful completion of
commissioning of the equipment shall be to the account of the Contractor. The Contractor shall
be responsible for preference of all claims and make good the damages or loss by way of repairs
and/or replacement of the equipment, damaged or lost. The transfer of title shall not in any way
relieve the Contractor of the above responsibilities during the period of Contract. The Contractor
shall provide the Owner with copy of all insurance policies and documents taken out by him in
pursuance of the Contract. Such copies of documents shall be submitted to the Owner
immediately after such insurance coverage. The Contractor shall also inform the Owner in writing
at least sixty (60) days in advance regarding the expiry/cancellation and/or change in any of such
documents and ensure revalidation, renewal etc., as may be necessary well in time.
37.3 The perils required to be covered under the insurance shall include, but not be limited to fire and
allied risks, miscellaneous accidents (erection risks) workman compensation risks, loss or damage
in transit, theft, pilferage, riot and strikes and malicious damages, civil commotion, weather
conditions, accidents of all kinds, etc. The scope of such insurance shall be adequate to cover the
replacement/reinstatement cost of the equipment for all risks up to and including delivery of
goods and other costs till the equipment is delivered at Site. The insurance policies to be taken
should be on replacement value basis and/or incorporating escalation clause. Notwithstanding
the extent of insurance cover and the amount of claim available from the underwriters, the
Contractor shall be liable to make good the full replacement/rectification value of all
equipment/materials and to ensure their availability as per project requirements.
37.4 All costs on account of insurance liabilities covered under the Contract will be on Contractor’s
account and will be included in Contract Price, However, the Owner may from time to time, during
the pendency of the Contract, ask the Contractor in writing to limit the insurance coverage, risks
and in such a case, the parties to the Contract will agree for a mutual settlement, for reduction in
Contract price to the extent of reduced premia amount. The Contractor, while arranging the
insurance shall ensure to obtain all discounts on premia, which may be available for higher volume
or for reason of financing arrangement of the project.
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
37.5 The clause entitled ‘Insurance’ under the section ECC of this Volume-I, covers the additional
insurance requirements for the portion of the works to be performed at the Site.
37.6 Special Conditions of Contract details out the various insurance liabilities.
38.0 LIABILITY FOR ACCIDENTS AND DAMAGES
Under the Contract, the Contractor shall be responsible for loss or damage to the plant until the
successful completion of commissioning as defined else where in the Bid document.
39.0 DELAYS BY OWNER OR HIS AUTHORISED AGENTS
39.1 In case the Contractor’s performance is delayed due to any act of omission on the part of the
Owner or his authorized agents, then the Contractor shall be given due extension of time for the
completion of the Works, to the extent such omission on the part of the Owner has caused delay
in the Contractor’s performance of the Contract.
Regarding reasonableness or otherwise of the extension of time, the decision of the Engineer shall
39.2 In addition, the Contractor shall be entitled to claim demonstrable and reasonable compensation
if such delays have resulted in any increase in cost. The Owner shall examine the justification for
such a request for claim and if satisfied, the extent of compensation shall be mutually agreed
depending upon the circumstances at the time of such an occurrence.
41.0 FORCE MAJEURE
41.1 Force major is herein defined as any cause which is beyond the control of the Contractor or the
Owner as the case may be, which they could not foresee or with a reasonable amount of diligence
could not have foreseen and which substantially affects the performance of the Contract, such as:
a. Natural phenomena, including but not limited to floods, droughts, earthquakes and
b. Acts of any Government, domestic or foreign, including but not limited to war, declared or
undeclared, priorities, guarantees, and embargoes.
Provided either party shall within fifteen (15) days from the occurrence of such a cause notify the
other in writing of such causes.
41.2 The Contractor or the Owner shall not be liable for delays in performing his obligations resulting
from any force major cause as referred to and/or defined above
The date of completion will, subject to hereinafter provided, be extended by a reasonable time
even though such cause may occur after Contractor’s performance of obligation has been delayed
due to other causes.
42.0 SUSPENSION OF WORK
42.1 The Owner reserves the right to suspend and reinstate execution of the whole or any part of the
Works without invalidating the provisions of the Contract. Orders for suspension or
reinstatement of the Works will be issued by the Engineer to the Contractor in writing. The time
for completion of the works will be extended for a period equal to duration of the suspension.
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
42.2 Any necessary and demonstrable cost incurred by the Contractor as a result of such suspension
of the works will be paid by the Owner, provided such costs are substantiated to the satisfaction
of the Engineer. The Owner shall not be responsible for any liabilities if suspension or delay is due
to some default on the part of the Contractor or his Sub-Contractor.
43.0 CONTRACTOR`S DE FAULT
43.1 If the Contractor shall neglect to execute the works with due diligence and expedition or shall
refuse or neglect to comply with any reasonable order given to him, in writing by the Engineer in
connection with the works or shall contravene the provisions of the Contract, the Owner may give
notice in writing to the Contractor to make good the failure, neglect or contravention complained
of. Should the Contractor fail to comply with the notice within thirty (30) days from the date of
serving the notice, then and in such case the Owner shall be at liberty to employ other workmen
and forthwith execute such part of the works as the Contractor may have neglected to do or if the
Owner shall think fit, without prejudice to any other right he may have under the Contract to take
the work wholly or in part out of the Contractor’s hands and re-contract with any other person or
persons to complete the works or any part thereof and in that event the Owner shall have free
use of all Contractor’s equipment that may have been at the time on the Site in connection with
the works without being responsible to the Contractor for fair wear and tear thereof and to the
exclusion of any right of the Contractor over the same, and the Owner shall be entitled to retain
and apply any balance which may otherwise be due on the Contract by him to the Contractor, or
such part thereof as may be necessary, to the payment of the cost of executing the said part of
the Works or of completing the Works as the case may be. If the cost of completing of works or
executing part thereof as aforesaid shall exceed the balance due to the Contractor shall pay such
excess. Such payment of excess amount shall be independent of the liquidated damages for delay
which the Contractor shall have to pay if the completion of works is delayed.
43.2 In addition, such action by the Owner as aforesaid shall not relieve the Contractor of his liability
to pay liquidated damages for delay in completion of Works as defined in Clause 14.0 of this
43.3 Such action by the Owner as aforesaid the termination of the Contract under this clause shall not
entitle the Contractor to reduce the value of the Contract Performance Guarantee nor the time
thereof. The Contract Performance Guarantee shall be valid for the full value and for the full
period of the Contract including guarantee period.
44.0 TERMINATION OF CONTRACT ON OWNER`S INITIATIVE
44.1 The Owner reserves the right to terminate the Contract either in part or in full due to reasons
other than those mentioned under clause entitled ‘Contractor’s Default’. The Owner shall in such
an event give fifteen (15) days notice in writing to the Contractor of his decision to do so.
44.2 The Contractor upon receipt of such notice shall discontinue the work on the date and to the
extent specified in the notice, make all reasonable efforts to obtain cancellation of all orders and
Contracts to the extent they are related to the work terminated and terms satisfactory to the
Owner, stop all further sub-contracting or purchasing activity related to the work terminated, and
assist Owner in maintenance, protection, and disposition of the works acquired under the
Contract by the Owner.
In the event of such a termination the Contractor shall be paid compensation, equitable and
reasonable, dictated by the circumstances prevalent at the time of termination.
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
44.3 If the Contractor is an individual or a proprietary concern and the individual or the proprietor dies
and if the Contractor is a partnership concern and one of the partners dies then unless the Owner
is satisfied that the legal representatives of the individual Contractor or of the proprietor of the
propriety concern and in the case of partnership, the surviving partners, are capable of carrying
out and completing the Contract the Owner shall be entitled to cancel the Contract as to its
incomplete part without being in any way liable to payment of any compensation to the estate
of deceased Contractor and/or to the surviving partners of the Contractor’s firm on account of
the cancellation of the Contract. The decision of the Owner that the legal representatives of the
deceased Contractor or surviving partners of the Contractor’s firm cannot carry out and complete
the Contract shall be final and binding on the parties. In the event of such cancellation the Owner
shall not hold the estate of the deceased Contractor and/or the surviving partners of the estate
of the deceased Contractor and/or the surviving partners of the Contractor’s firm liable to
damages for not completing the Contract.
45.0 FRUSTRATION OF CONTRACT
45.1 In the event of frustration of the Contract because of supervening impossibility in terms of Section
56 of the Indian Contract Act, parties shall be absolved of their responsibility to perform the
balance portion of the Contract, subject to provisions contained in sub-clause 45.3 below.
45.2 In the event of non-availability or suspension of funds for any reasons, whatsoever (except for
reason of willful or flagrant breach by the Owner) and/or Contractor then the works under the
Contract shall be suspended.
Furthermore, if the Owner is unable to make satisfactory alternative arrangements for financing
to the Contractor in accordance with the terms of the Contract within three months of the event,
the parties hereto shall be relieved from carrying out further obligations under the Contract
treating it as frustration of the Contract.
45.3 In the event referred to in sub-clauses 45.1 & 45.2 above the parties shall mutually discuss to
arrive at reasonable settlement on all issues including amounts due to either party for the work
already done on quantum merit_ basis, which shall be determined by mutual agreement between
46.0 GRAFTS AND COMMISSIONS ETC.
Any graft, commission, gift or advantage given, promised or offered by or on behalf of the
Contractor or his partner(s), agent(s), officer(s), director(s), employee(s) or servant(s) or any one
on his or their behalf in relation to the obtaining or to the execution of this or any other Contract
with the Owner, shall in addition to any criminal liability which it may incur, subject the Contractor
to the cancellation of this and all other Contracts and also to payment of any loss or damage to
the Owner resulting from any cancellation. The Owner shall then be entitled to deduct the
amount so payable from any monies otherwise due to Contractor under the Contract.
RESOLUTION OF DISPUTES
47.0 SETTLEMENT OF DISPUTES
47.1 Any dispute(s) or difference(s) arising out of or in connection with the Contract shall, to the extent
possible, be settled amicably between the parties.
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
47.2 If any dispute or difference of any kind, whatsoever, shall arise between the Owner and the
Contractor, arising out of the Contract for the performance of the Works whether during the
progress of the Works or after its completion or whether before or after the termination,
abandonment or breach of the Contract, it shall, in the first place, be referred to and settled by
the Engineer, who, within a period of thirty (30) days after being requested by either party to do
so, shall give written notice of his decision to the Owner and the Contractor.
47.3 Save as hereinafter provided, such decision in respect of every matters so referred shall be final
and binding upon the parties until the completion of the Works and shall forthwith be given effect
to by the Contractor who shall proceed with the Works with all due diligence, whether he or the
Owner requires arbitration as hereinafter provided or not.
47.4 If after the Engineer has given written notice of his decision to the parties, no claim to arbitration
has been communicated to him by either party within thirty (30) days from the receipt of such
notice, the said decision shall become final and binding on the parties.
47.5 In the event of the Engineer failing to notify his decision as aforesaid within thirty (30) days after
being requested as aforesaid, or in the event of either the Owner or the Contractor being
dissatisfied with any such decision, or within thirty (30) days after the expiry of the first mentioned
period of thirty days, as the case may be, either party may require that the matters in dispute be
referred to arbitration as hereinafter provided.
48.0 ARBITRATION
48.1 All disputes or differences in respect of which the decision, if any, of the Engineer has not become
final or binding as aforesaid shall be settled by arbitration in the manner hereinafter provided.
48.1.1 The arbitration shall be conducted by three arbitrators, one each to be nominated by the
Contractor and the Owner and the third to be appointed as an umpire by both the arbitrators in
accordance with the Indian Arbitration Act. If either of the parties fails to appoint its arbitrator
within sixty (60) days after receipt of a notice from the other party invoking the Arbitration clause,
the arbitrator appointed by the party invoking the arbitration clause shall become the sole
arbitrator to conduct the arbitration.
48.1.2 The arbitration shall be conducted in accordance with the provisions of the Indian Arbitration Act,
1940 or any statutory modification thereof. The venue of arbitration shall be Palanpur.
48.2 The decision of the majority of the arbitrators shall be final and binding upon the parties.
The arbitrators may, from time to time with the consent of all the parties enlarge the time for
making the award. In the event of any of the aforesaid arbitrators dying, neglecting, resigning or
being unable to act for any reason, it will be lawful for the party concerned to nominate another
arbitrator in place of the outgoing arbitrator.
48.3 The arbitrator shall have full powers to review and/or revise any decision, opinion, direction,
certification or valuation of the Engineer in accordance with the Contract, and neither party shall
be limited in the proceedings before such arbitrators to the evidence or arguments put before the
Engineer for the purpose of obtaining the said decision.
48.4 No decision given by the Engineer in accordance with the foregoing provisions shall disqualify him
as being called as a witness or giving evidence before the arbitrators on any matter whatsoever
relevant to the dispute or difference referred to the arbitrators as aforesaid.
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
48.5 During settlement of disputes and arbitration proceedings, both parties shall be obliged to carry
out their respective obligations under the Contract.
49.0 RECONCILIATION OF ACCOUNTS
The Contractor shall prepare and submit every one month, a statement covering payments
claimed and the payments received vis-à-vis the works executed, for reconciliation of accounts
with the Owner. The Contractor shall also prepare and submit a detailed account of Owner Issue
materials received and utilized by him for reconciliation purpose in a format to be discussed &
finalized with the Owner before the award of Contract.
• As per the Welfare Cess Act, the welfare cess @ 1% is applicable on supply and erection items for
supply, erection, testing & commissioning of substation, transmission lines, EPC/Turnkey projects
and civil works.
• Contractor shall get r registering under Welfare Cess Act before commencement of work. Office of
the Factory Inspector is authorized at present as a registering authority.
• GETCO shall pay the welfare cess by way of reimbursing to contractors on production of
documentary evidence of payment.
• The contracts for which supply or part supply of material are in the scope of GETCO, then
contractors shall deposit welfare cess on estimated cost of supplied items to GETCO on progressive
basis of utilization. As this part of welfare cess is on GETCO account, the same shall be reimbursed
to the contractor on receipt of request letter along with documentary evidence of payment. For
calculation of welfare cess on supply part, valuation as per MR shall be taken and informed to the
contractor for payment. This will be over and above the A/T value.
The modality of payment/ reimbursement of welfare cess will be as under.
• On receipt of A/T, the contractor / bidder will get them registered under Welfare Cess Act and
submit the documentary evidence to the concern office.
• Before release of payment of first R.A. Bill, the contractor has to submit the documentary
evidence of registration. Only thereafter, the bill will be processed for payment.
• Before release of payment of subsequent R.A. Bills, the contractor has to submit the documentary
evidence of payment of welfare cess of previous R.A. Bill.
• Before release of payment of final bill, the contractor has to submit documentary evidence of
payment of welfare cess of previous R.A. Bill as well as of this final bill.
• If the R.A. Bill happens to be first and final bill, then before release of payment, contractor has to
submit documentary evidence of registration under Welfare Cess Act and evidence of payment
of welfare cess.
• The welfare cess shall be reimbursed to the contractor on submission of copy of documentary
evidence of payment by observing due formalities.
Note: welfare tax shall be reimbursed on production of proof of such payments made by the contractor
to the appropriate department.
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
1. SCOPE OF WORK: The work is to be carried out on 'Turn Key Basis' which includes survey, design,
supply of SPV systems with all accessories and equipment, metering, installation, testing, commissioning
and maintenance services for 5 years, of the GEDA's identified sites with free replacement warranty on
spare parts against manufacturing defects for five years. It also includes obtaining permission of concern
DISCOM and Chief Electrical Inspector (CEI) approvals. i.e.
a) Survey of identified sites/ prospective beneficiaries of GEDA
b) Preparation of Detailed Project Report (DPR) of the proposed Proposal of SPV Power Plant.
c) Registration of the Project on GEDA online portal with necessary fees, Obtaining No objection
certificate, net metering connectivity agreements from concerned DISCOM for grid connectivity and
CEI's approval and payment of CEI Inspection Chagres, Connectivity charges, Meter charges, Meter
testing and SMC box charges etc EXCEPT charges for Strengthening of the DISCOM Network, if required.
d) The work covers Design, supply, installation, commissioning and comprehensive maintenance for FIVE
years, including grid connectivity charges, meter charges etc.
e) Design, supply, civil work, erection, testing and commissioning of SPV grid connected Power Plant as
per schedule given in the work order.
f) Installation of solar meter and bi-directional meters along with second line of protection in the system
such as SPD etc.
g) Installation of Remote Monitoring facility along with necessary dongle etc. for the period of 5 years.
h) The scope of the work covers cleaning and washing of the Photovoltaic Modules regularly (two times
in a month) to ensure annual capacity utilization factor of 17 % during the five years CMC.
GENERAL INFORMATION
1.1 The following shall supplement the conditions already contained in other parts of these
specifications & document and shall govern the portion of the work of this Contract to be
performed at Site.
1.2 The Contractor upon signing of the Contract shall, nominate a responsible officer as his
representative at Site suitably designated for the purpose of overall responsibility and
coordination of the works to be performed at Site. Such person shall function from the Site office
of the Contractor during the pendency of Contract.
2.0 REGULATION OF LOCAL AUTHORITIES AND STATUTES
2.1 The Contractor shall comply with all the rules and regulations of local authorities during the
performance of his field activities. He shall also comply with the Minimum Wages Act, 1948 and
the Payment of Wages Act (both of the Government of India) and the rules made there under in
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
respect of any employee or workman employed or engaged by him or his Sub-Contractor. He shall
abide by labour laws and others as specified in the special conditions of contract.
2.2 All registration and statutory inspection fees, if any, in respect of his work pursuant to this
Contract shall be to the account of the Contractor. Should any such inspection or registration need
to be re-arranged due to the fault of the Contractor or his Sub Contractor, the additional fees to
such inspection and/or registration also shall be borne by the Contractor.
3.0 OWNER’S LIEN ON EQUIPMENT
The Owner shall have lien on all equipment brought to the Site for the purpose of erection, testing
and commissioning of the equipment to be supplied & erected under the Contract. The Owner
shall continue to hold the lien on all such equipment throughout the period of Contract. No
material brought to the Site shall be removed from the Site by the Contractor and/or his Sub-
Contractors without the prior written approval of the Engineer.
4.0 ACCESS TO SITE AND WORKS ON SITE
4.1 Suitable access to and possession of the Site shall be afforded to the Contractor by the Owner in
reasonable time.
4.2 The works so far as it is carried out on the Owner’s premises, shall be carried out at such time as
the Owner may approve and the Owner shall give the Contractor reasonable facilities for carrying
4.3 In the execution of the works, no person other than the Contractor or his duly appointed
representative, Sub- Contractor and workmen, shall be allowed to do work on the Site, except by
the special permission, in writing of the Engineer or his representative.
5.0 CONTRACTOR’S SITE ESTABLISHMENT
The Contractor shall at all times keep posted an authorized representative for the purpose of the
Contract. Any written order or instruction of the Engineer or his duly authorized representative,
shall be communicated to the said authorized resident representative of the Contractor and the
representative shall be available at a stated address for this purpose.
6.0 CO-OPERATION WITH OTHER CONTRACTORS
6.1 The Contractor shall co-operate with all other Contractors or tradesmen of the Owner, who may
be performing other works on behalf of the Owner and the workmen who may be employed by
the Owner and doing work in the vicinity of the Works under the Contract. The Contractor shall
also so arrange to perform his work as to minimize, to the maximum extent possible, interference
with the work of other Contractors and their workmen. Any injury or damage that may be
sustained by the employees of the other Contractors and the Owner, due to the Contractor’s work
shall promptly be made good at the Contractor’s own expense.
7.0 DISCIPLINE OF WORKMEN
The Contractor shall adhere to the disciplinary procedure set by the Engineer in respect of his
employees and workmen at Site. The Engineer shall be at liberty to object to the presence of any
representative or employee of the Contractor at the Site, if in the opinion of the Engineer such
employee has misconduct himself or is incompetent or negligent or otherwise undesirable and
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
then the Contractor shall remove such a person objected to and provide in his place a competent
8.0 CONTRACTOR’S FIELD OPERATION
8.1 The Contractor shall keep the Engineer informed in advance regarding his field activity plans and
schedules for carrying-out each part of the works. Any review of such plan or schedule or method
of work by the Engineer shall not relieve the Contractor of any of his responsibilities towards the
field activities. Such reviews shall also not be considered as an assumption of any risk or liability
by the Engineer or the Owner or any of his representatives and no claim of the Contractor will be
entertained because of the failure or inefficiency of any such plan or schedule or method of work
reviewed. The Contractor shall be solely responsible for the safety, adequacy and efficiency of
plant and equipment and his erection methods.
8.2 The Contractor shall have the complete responsibility for the conditions of the Work-site including
the safety of all persons employed by him or his Sub–Contractor and all the properties under his
custody during the performance of the work. This requirement shall apply continuously till the
completion of the Contract and shall not be limited to normal working hours.
9.0 PROGRESS REPORT
9.1 The Contractor shall furnish three (3) copies each to the Engineer of progress including if any,
photographs of the work done at Site.
9.2 The monthly progress report detailing-out the progress achieved on all erection activities shall
highlight comparison to the schedules. The report shall also indicate the reasons for the variance
between the scheduled and actual progress and the action proposed for corrective measures,
wherever necessary.
10.0 MAN-POWER REPORT
10.1 The Contractor shall submit to the Engineer, on the first day of every month, a man hours schedule
for the month, detailing the man hours scheduled for the month, skill-wise and area-wise.
11.0 PROTECTION OF WORK
The Contractor shall have total responsibility for protecting his works till it is finally taken over by
the Engineer. No claim will be entertained by the Owner or by the Engineer for any damage or
loss to the Contractor’s works and the Contractor shall be responsible for complete restoration of
the damaged works to original conditions to comply with the specification and drawings.
12.0 EMPLOYMENT OF LABOUR
12.1 The Contractor will be expected to employ on the work only his regular skilled employees with
experience of his particular work. No person below the age of eighteen years shall be employed.
12.2 All traveling expenses including provisions of necessary transport to and from Site, lodging,
allowances and other payments to the Contractor’s employees shall be the sole responsibility of
the Contractor.
12.3 In case the Owner becomes liable to pay any wages or dues to Labour or any Government agency
under any of the provisions of the Minimum Wages Act, Workmen Compensation Act, Contract
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
Labour Regulation Abolition Act or any other law due to act of omission of the Contractor, the
Owner may make such payment and shall recover the same from the Contractor’s bills.
13.0 FACILITIES TO BE PROVIDED BY THE CONTRACTOR
13.1 Tools, tackles and scaffoldings
The Contractor shall provide all the construction equipment’s; tools, tackles and scaffoldings
required for pre-assembly, erection, of the Breaker, Bus-bar Gantry etc, covered under the
Contract. He shall submit a list of all such materials to the Engineer before the commencement of
work at Site. These tools and tackles shall not be removed from the Site without the written
permission of the Engineer.
13.3 The Contractor shall provide necessary first-aid facilities for all his employees, representatives and
workmen working at the Site. Enough number of Contractor’s personals shall be trained in
administering first-aid.
13.4 Cleanliness
13.4.1 The Contractor shall be responsible for keeping the entire area allotted to him clean and free from
rubbish, debris etc. during the period of Contract. The Contractor shall employ enough number
of personnel to keep the work area clean. Materials and stores shall be so arranged to permit easy
cleaning of the area. In areas where equipment might drip oil and cause damage to the floor
surface, a suitable protective cover of a flame resistant, oil proof sheet shall be provided to
protect the floor from such damage.
14.0 LINES AND GRADES
All the works shall be performed to the lines, grades and elevations indicated on the drawings.
The Contractor shall be responsible to locate and lay-out the works. Basic horizontal and vertical
control points will be established and marked by the Engineer at site at suitable points. These
points shall be used as datum for the works under the Contract. The Contractor shall inform the
Engineer well in advance of the times and places at which he wishes to do work in the area allotted
to him so that suitable datum points may be established and checked by the Engineer to enable
the Contractor to proceed with his works. Any work done without being properly located may be
removed and/or dismantled by the Engineer at Contractor’s expense.
15.0 FIRE PROTECTION
15.1 The work procedures that are to be used during the erection shall be those, which minimize fire
hazards to the extent practicable. Combustible materials, combustible waste and rubbish shall be
collected and removed from the Site at least once each day. Fuels, oils and volatile or inflammable
materials shall be stored away from the construction and equipment and materials storage areas.
15.2 All the Contractor’s supervisory personnel and select number of workers shall be trained for fire
fighting. Enough of such trained personnel must be available at the Site during the entire period
of the Contract.
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
The Contractor shall have total responsibility for all equipment and materials in his
custody/stores, loose, semi-assembled and/or erected by him at Site. The Contractor shall make
suitable security arrangements ensure the protection of all materials, equipment and works from
theft, fire, pilferage and any other damages and loss.
17.0 PRE-COMMISSIONING TRIALS AND INITIAL OPERATIONS
The pre-commissioning trials and initial operations of the equipment erected by the Contractor
shall be carried out in presence of contractor and is deemed considered as part of the work
completion. If it is anticipated that the above test may prolong for a long time, the Contractor’s
workmen required for the above test shall always be present at Site during such tests and trials.
18.0 MATERIALS HANDLING AND STORAGE
18.1 All the equipment furnished under the Contract and arriving at Site shall be promptly received,
unloaded, transported and stored in the storage spaces by the Contractor.
18.2 Contractor shall be responsible for examining all the shipment and notify the Engineer
immediately of any damages, storage, discrepancy etc, for the purpose of Engineer’s information
only. The Contractor shall submit to the Engineer every week a report detailing all the receipts
during the week. However, the Contractor shall be solely responsible for any shortages or
damages in transit, handling and / or in storage and erection of the equipment at Site. Any
demurrage, wharf age and other such charges claimed by the transporters, railways etc, shall be
to the account of the Contractor.
18.3 The Contractor shall maintain an accurate and exhaustive record detailing out the list of all
equipment materials received by him for the purpose of erection and keep such record open for
the inspection of the Engineer in-charge.
18.4 All equipment shall be handled very carefully to prevent any damage or loss. The equipment
stored shall be properly protected to prevent damage either to the equipment or to the floor
where they are stored. The equipment from the store shall be moved to the actual location at the
appropriate time so as to avoid damage of such equipment at Site.
18.5 All electrical panels, control gears, motors and such other devices shall be properly dried by
heating before they are installed and energized. Motor bearings, slip ring, commutators and other
exposed parts shall be protected against moisture ingress and corrosion during storage and
periodically inspected.
18.6 All the electrical equipment such as motors, generators, etc. shall be tested for insulation
resistance at least once in three months from the date of receipt till the date of commissioning
and a record of such measured insulation values maintained by the Contractor. Such records shall
be opened for inspection by the Engineer.
18.7 The consumable and other supplies likely to deteriorate due to storage must be thoroughly
protected and stored in a suitable manner to prevent damage or deterioration in quality by
18.8 All the materials stored in the open or dusty location must be covered with suitable weatherproof
and flame proof covering material wherever applicable.
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
18.9 If the materials belonging to the Contractor are stored in areas other than those earmarked for
him, the Engineer will have the right to get it moved to the area earmarked for the Contractor at
the Contractor’s cost.
18.10 The Contractor shall be responsible for making suitable indoor storage facilities to store all
equipment, which require indoor storage. Normally, all the electrical equipment such as motors,
control gears, generators, exciters and consumables like electrodes, lubricants etc. shall be stored
in the closed storage space. The Engineer, in addition, may direct the Contractor to move certain
other materials, which in his opinion will require indoor storage, to indoor storage areas, which
the Contractor shall strictly comply with.
19.0 CONSTRUCTION MANAGEMENT
19.1 The field activities of the Contractors working at Site, will be coordinated by the Engineer and the
Engineer’s decision shall be final in resolving any disputes or conflicts between the Contractor and
other Contractors and the tradesmen of the Owner regarding scheduling and coordination of
work. Such decision by the Engineer shall not be a cause for extra compensation or extension of
time for the Contractor.
19.2 The Engineer shall hold weekly meetings of the Contractor at Site, at a time and place to be
designated by the Engineer. The Contractor shall attend such meetings and take notes of
discussions during the meeting and the decision of the Engineer and shall strictly adhere to those
decisions in performing his works. In addition to the above weekly meeting, the Engineer may
call for other meetings either with individual Contractors or with selected number of Contractors
and in such a case the Contractors if called, will also attend such meetings.
19.3 Time is the essence of the Contract and the Contractor shall be responsible for performance of
his works in accordance with the specified construction schedule. If at any time, the Contractor
is falling behind the schedule, he shall take necessary action to make good for such delays by
increasing his work force or by working overtime or otherwise accelerate the progress of the work
to comply with the schedule and shall communicate such actions in writing to the Engineer,
satisfying that his action will compensate for the delay. The Contractor shall not be allowed any
extra compensation for such action.
19.4 The Engineer shall, however, not be responsible for provision of additional labour and/or materials
or supply or any other services to the Contractor except for the coordination work between
various Contractors if any at site.
20.0 FIELD OFFICE RECORDS
The Contractor shall maintain up to date copies of all drawings, specifications and other Contract
Documents and any other supplementary data complete with all the latest revisions thereto. The
Contractor shall also maintain in addition the continuous record of all changes to the above
Contract Documents, drawings, specifications, and supplementary data, etc. effected at the field
and on completion of his total assignment under the Contract shall incorporate all such changes
on the drawings and other Engineering data to indicate as installed conditions of the equipment
furnished and erected under the Contract. Such drawings and Engineering data shall be submitted
to the Engineer in required number of copies.
21.0 CONTRACTOR’S MATERIALS BROUGHT TO SITE
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
21.1 The Contractor shall bring to Site all equipment, components, parts, materials, including
construction equipment, tools and tackles for the purpose of the works under intimation to the
Engineer. All such goods shall, from the time of their being brought vest in the Owner, but may
be used for the purpose of the works only and shall not on any account be removed or taken away
by the Contractor without the written permission of the Engineer. The Contractor shall
nevertheless be solely liable and responsible for any loss or destruction thereof and damage
21.2 The Owner shall have a lien on such goods for any sum or sums which may at any time be due or
owing to him by the Contractor, under, in respect of or by reasons of the Contract. After giving a
fifteen (15) days notice in writing of his intention to do so, the Owner shall be at liberty to sell and
dispose off any such goods, in such manner as he shall think fit and to apply the proceeds in or
towards the satisfaction of such sum or sums due as aforesaid.
21.3 After the completion of the Works, the Contractor shall remove from the Site under the direction
of the Engineer the materials such as construction equipment, erection tools and tackles,
scaffolding etc. with the written permission of the Engineer.
22.0 PROTECTION OF PROPERTY AND CONTRACTOR’S LIABILITY
22.1 The Contractor shall be responsible for any damage resulting from his operations. He shall also
be responsible for protection of all persons including members of public and employees of the
Owner and the employees of other Contractors and Sub-Contractors and all public and private
. 23.2 Workmen’s Compensation Insurance
This insurance shall protect the Contractor against all claims applicable under the Workmen’s
Compensation Act, 1948 (Government of India). This policy shall also cover the Contractor against
claims for injury, disability, disease or death of his or his Sub-Contractor’s employee, which for
any reason are not covered under the Workmen’s Compensation Act, 1948. The liabilities shall
not be less than:
Workmen’s : As per statutory
Compensation Provisions
Employee’s : As per statutory
Liability Provisions
23.3 Comprehensive General Liability Insurance
The insurance shall protect the Contractor against all claims arising from injuries, disabilities,
disease or death of members of public or damage to property of others, due to any act of omission
on the part of the Contractor, his agents, his employees, his representatives and Sub-Contractors
or from riots, strikes and civil commotion.
23.4 The hazards to be covered will pertain to all the works and areas where the Contractor, his Sub-
Contractors, his agents and his employees have to perform work pursuant to the Contract.
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
23.5 The above are only illustrative list of insurance covers normally required and it will be the
responsibility of the Contractors to maintain all necessary insurance coverage to the extent both
in time and amount to take care of all his liabilities either direct or indirect, in pursuance of the
24.0 UNFAVOURABLE WORKING CONDITIONS
The Contractor shall confine all his field operations to those works, which can be performed
without subjecting the equipment and materials to adverse effects during inclement weather
conditions, like monsoon, storms etc. and during other unfavourable construction conditions. No
field activities shall be performed by the Contractor under conditions, which might adversely
affect the quality and efficiency thereof, unless special precautions or measures are taken by the
Contractor in a proper and satisfactory manner in the performance of such Works and with the
concurrence of the Engineer. Such unfavourable construction conditions will in no way relieve the
Contractor of his responsibility to perform the Works as per the schedule.
25.0 PROTECTION OF MONUMENTS AND REFERENCE POINTS
The Contractor shall ensure that any finds such as relic, antiquity, coins, fossils, etc. which he may
come across during the course of performance of his Works either during excavation or
elsewhere, are properly protected and handed over to the Engineer. Similarly, the Contractor
shall ensure that the bench marks, reference points, etc, which are marked either with the help
of Engineer or by the Engineer shall not be disturbed in any way during the performance of his
Works. If any work is to be performed which disturbs such reference the same shall be done only
after these are transferred to other suitable locations under the direction of the Engineer. The
Contractor shall provide all necessary materials and assistance for such relocation of reference
27.0 WORK & SAFETY REGULATIONS
27.1 The Contractor shall ensure proper safety of all the workmen, materials, plant and equipment
belonging to him or to others, working at the Site. The Contractor shall also be responsible for
provision of all safety notices and safety equipment required both by the relevant legislation’s
and the Engineer, as he may deem necessary.
27.4 All equipment used in construction and erection by Contractor shall meet Indian/International
Standards and where such standards do not exist, the Contractor shall ensure these to be
absolutely safe. All equipment shall be strictly operated and maintained by the Contractor in
accordance with manufacturer’s Operation Manual and safety instructions and as per
Guidelines/rules of in this regard.
27.5 Periodical examinations and all tests for all lifting/hoisting equipment & tackles shall be carried-
out in accordance with the relevant provisions of Factories Act 1948, Indian Electricity Act
and associated Laws/Rules in force from time to time. A register of such examinations and tests
shall be properly maintained by the Contractor and will be promptly produced as and when
desired by the Engineer or by the person authorized by him.
27.6 The Contractor shall provide suitable safety equipment of prescribed standard to all employees
and workmen according to the need.
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
27.8 The Contractor shall provide safe working conditions to all workmen and employees at the Site
including safe means of access, railings, stairs, ladders, scaffoldings etc. The scaffoldings shall be
erected under the control and supervision of an experienced and competent person. For erection,
good and standard quality of material only shall be used by the Contractor.
27.9 The Contractor shall not interfere or disturb electric fuses, wiring and other electrical equipment
belonging to the Owner or other Contractors under any circumstances, whatsoever, unless
expressly permitted in writing by to handle such fuses, wiring or electrical equipment
27.10 Before the Contractor connects any electrical appliances to any plug or socket belonging to the
other Contractor or Owner, he shall:
a. Satisfy the Engineer that the appliance is in good working condition;
b. Inform the Engineer of the maximum current rating, voltage and phases of the appliances;
c. Obtain permission of the Engineer detailing the sockets to which the appliances may be
27.11 The Engineer will not grant permission to connect until he is satisfied that;
a. The appliance is in good condition and is fitted with suitable plug;
b. The appliance is fitted with a suitable cable having two earth conductors, one of which
shall be an earthed metal sheath surrounding the cores.
27.12 No electric cable in use by the Contractor/Owner will be disturbed without prior permission. No
weight of any description will be imposed on any cable and no ladder or similar equipment will
rest against or attached to it.
27.13 No repair work shall be carried out on any live equipment. The equipment must be declared safe
by the Engineer and a permit to work shall be issued by the Engineer before any repair work is
carried out by the Contractor. While working on electric lines/equipment, whether live or dead,
suitable type and sufficient quantity of tools will have to he provided by the Contractor to
electricians/workmen/officers.
27.14 In case any accident occurs during the construction/ erection or other associated activities
undertaken by the Contractor thereby causing any minor or major or fatal injury to his employees
due to any reason, whatsoever, it shall be the responsibility of the Contractor to promptly inform
the same to the Engineer in prescribed form and also to all the authorities envisaged under the
applicable laws.
27.15 The Engineer shall have the right at his sole discretion to stop the work, if in his opinion the work
is being carried out in such a way that it may cause accidents and endanger the safety of the
persons and/or property, and/or equipment. In such cases, the Contractor shall be informed in
writing about the nature of hazards and possible injury/accident and he shall comply to remove
shortcomings promptly. The Contractor after stopping the specific work can, if felt necessary,
appeal against the order of stoppage of work to the Engineer within 3 days of such stoppage of
work and decision of the Engineer in this respect shall be conclusive and binding on the
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
27.16 The Contractor shall not be entitled for any damages/compensation for stoppage of work due to
safety reasons as provided in Para 31.18 above and the period of such stoppage of work will not
be taken as an extension of time for completion of work and will not be the ground for waiver of
levy of liquidated damages.
27.17 It is mandatory for the Contractor to observe during the execution of the works, requirements of
Safety Rules which would generally include but not limited to following
a) Each employee shall be provided with initial indoctrination regarding safety by the Contractor,
so as to enable him to conduct his work in a safe manner.
b) No employee shall be given a new assignment of work unfamiliar to him without proper
introduction as to the hazards incident thereto, both to himself and his fellow employees.
c) Employees must not leave naked fires unattended. Smoking shall not be permitted around fire
prone areas and adequate firefighting equipment shall be provided at crucial location.
d) There shall be a suitable arrangement at every work site for rendering prompt and sufficient
first aid to the injured.
j) Requirements of ventilation in underwater working to licensed and experienced divers, use
of gum boots for working in slushy or in inundated conditions are essential requirements to
27.18 The Contractor shall follow and comply with all Safety Rules, relevant provisions of applicable laws
pertaining to the safety of workmen, employees, plant and equipment as may be prescribed from
time to time without any demur, protest or contest or reservations. In case of any discrepancy
between statutory requirement and Safety Rules referred above, the latter shall be binding on
the Contractor unless the statutory provisions are more stringent.
a. Fatal injury or accident Rs. 1,00,000/- : These are applicable for death
Causing death per person
b. Major injuries or accident causing Rs. 20,000/- : injury to any person, whosoever.
25% or more permanent disablement per person
to Workmen or employees
Permanent disablement shall have same meaning as indicated in Workmen’s Compensation Act. The
compensation mentioned above shall be in addition to the compensation payable to the
workmen/employees under the relevant provisions of the Workmen’s Compensation Act and
rules framed there under or any other applicable laws as applicable from time to time. In case the
Owner is made to pay such compensation then the Contractor is liable to reimburse the Owner
such amount in addition to the compensation indicated above.
28.0 CODE REQUIREMENTS
The erection requirements and procedures to be followed during the installation of the
equipment shall be in accordance with the relevant Codes and accepted good engineering
practice, the Engineer’s drawings and other applicable Indian recognized codes and laws and
regulation of the Government of India.
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
TENDER SPECIFICATION NO: - PTC/CM-1/N-46/2026
Sub.: Tender for Survey, Design, Supply, Installation, Testing, Commissioning and Comprehensive
Maintenance for 5 years of Distributed Grid-connected Solar PV plants at various under
Dhanera AM Divisions under Palanpur Circle. (PHASE - II)
In connection with above subject, I / we confirm the following:
I/ we, the undersigned, have read and understand the Tender Specification No._____________ For
Tender for Survey, Design, Supply, Installation, Testing, Commissioning and Comprehensive
Maintenance for 5 years of Distributed Grid-connected Solar PV plants at various 66kv Sub-stations
under Dhanera AM Divisions under Palanpur Circle
complete with the entire Tender Terms and Conditions.
a. The price in the bid is firm prices in line with Tender Specifications and shall stand valid till
completion of the Contract, if awarded.
b. I/We declare that our bid is strictly in line with Tender Specifications and there is no deviation.
Further, I / we also agree that additional conditions / deviations, if any found in bid, the offer shall
be out rightly rejected without assigning any reason thereof.
Signature of Authorized representative
of Company / Agency
CONFIRMATION OF DETAILS OF BIDDER
Bidders are required to furnish following information specifying YES / NO
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
1) Whether the Bid is on percentage basis as called for. Yes / No
2) Whether rebate furnished is in percentage basis as called for. Yes / No
3) Whether the Bid is submitted by RPAD. Yes / No
4) Whether all pages of Bid Specifications are sealed and signed by Yes / No
5) a) Whether the Bidder is reAIStered with for erection Yes / No
b) In case of “Yes”, please furnish following details:
i) ReAIStration Letter No. & date.
ii) Class of ReAIStration
c) Whether Bidder is having PF Code No. Yes / No
6) a) Whether EMD paid. ( BG/RTGS/NEFT/Online ) Yes / No
b) In case “Yes”, furnish details
7) Whether following documents as specified are submitted.
a) Human Resources detail. Yes / No
b) Availability of tools, equipments etc. Yes / No
c) Details of orders executed / on hand Yes / No
d) Financial capability. Yes / No
e) Experience as specified. Yes / No
f) Latest Income-tax certificate Yes / No
g) Company's Articles Of Association Yes / No
h) Details Of Partners / Directors Yes / No
i) B.R./P.A. Authorizing Person Yes / No
j) Power of Attorney of Consortium Members Yes / No.
Signature of Authorized Representative of
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
WORK & SAFETY REGULATIONS
1. The contractor shall ensure proper safety of all the workmen, materials, equipment & plant &
belonging to him or to GETCO or to others, working at the site. The contractor shall also be
responsible for provision of all safety notices and safety equipment required both by the
relevant leAISlations and Engineer, as he may deem necessary.
2. Contractor has to provide ISI marked ELCB / MCB having sufficient capacity of standard make at
point of supply.
3. All equipment used in construction and erection by contractor shall meet Indian/International
Standards and where such standards do not exist, the contractor shall ensure these to be
absolutely safe. All equipment shall be strictly operated and maintained by the contractor in
accordance with manufacturer’s operation manual and safety instructions and as per guidelines/
rules of GETCO in this regard.
4. Periodical examinations and all tests for all lifting/ hoisting equipment & tackles shall be carried
– out in accordance with the relevant provisions of Factories Act 1948, Indian Electricity Act
1910 and associated Laws/Rules in force from time to time. A register of such examinations and
tests shall be property maintained by the contractor and will be promptly produces as and when
desired by Engineer or by the person authorized.
5. The contractor shall provide suitable safety equipment of prescribed standard to all employees
and workmen according to the need.
6. The contractor shall provide safe working conditions to all workmen and employees at the site
including safe means of access, railings, stairs, ladders, scaffoldings etc. the scaffoldings shall be
erected under the control and supervision of an experienced and competent person. The
contractor only shall use good and standard quality of material.
7. The contractor shall not interfere or disturb electric fuses, wiring and other electrical equipment
belonging to the owner / other contractors under any circumstances, whatsoever, unless
expressly permitted in writing to handle such fuses, wiring or electrical equipment.
8. Before the contractor connects any electrical appliances to any plug or socket belonging to the
other contractor or owner, he shall:
a. Satisfy the Engineer that the appliance is in good working condition;
b. Inform the Engineer of the max. current rating & voltage of the appliances;
c. Obtain permission of the Engineer detailing the sockets to which the appliances may be
9. The Engineer will not grant permission to connect until he is satisfied that;
a. The appliance is in good condition and is fitted with suitable plug
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
b. The appliance is fitted with a suitable cable having two earth conductors, ones of which
shall be an earthed metal sheath surrounding the cores.
10. No electric cable in use by the contractor/ Owner will be disturbed without prior permission. No
weight of any description will be imposed on any cable and no ladder or similar equipment will
rest against or attached to it.
11. No repair work shall be carried out on any live equipment. The equipment must be declared safe
by the Engineer and a permit to work shall be issued by the Engineer before any repair work is
carried out by the contractor. While working on electric lines/ equipment, whether live or dead,
suitable type and sufficiently quantity of tools will have to he provided by the contractor to
electricians/ workmen/ officers.
12. In case any accident occurs during the construction/ erection or other associated activities
undertaken by the contractor thereby causing any minor or major fatal injury to his employees
due to any reason, whatsoever, it shall be the responsibility of the contractor provide medical
facility / treatment & to promptly inform the same to the Engineer in prescribed form and to
also to all the authorities envisaged under the applicable laws.
13. The Engineer shall have the right at his sole discretion to stop the work, if in his opinion the
work is being carried out in such a way that it may cause accidents and endanger the safety of
the persons and/or property and/or equipment. In such cases, the contractor shall be informed
in writing about the nature of hazards and possible injury/ accident and he shall comply to
remove shortcomings promptly. The contractor after stopping the specific work can, if felt
necessary, appeal against the order of stoppage of work to the Engineer within 3 days of such
stoppage of work and decision of the Engineer in this respect shall be conclusive and binding on
the contractor.
14. The contractor shall not be entitled for any damages/ compensation for stoppage of work due
to safety reasons and the period of such stoppage of work will not be taken as an extension of
time for completion of work and will not be the ground for waiver of levy of liquidated damages.
15. it is mandatory for the contractor to observe during the execution of the works, requirements of
safety rules which would generally include but not limited to following;
a. Each employee shall be provided with initial indoctrination regarding safety by the
contractor, so as to enable him to conduct his work in a safe manner.
b. No employee shall be given a new assignment of work unfamiliar to him without proper
introduction as to the hazards incident thereto, both himself & his fellow employees.
c. Employee must not leave naked fires unattended, smoking shall not be permitted
around fire prone areas and adequate firefighting equipment shall be provided at crucial
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
d. There shall be a suitable arrangement at every work site for rendering prompt and
sufficient first aid to the injured.
e. Requirements of ventilation in underwater working to licensed and experienced divers, use of
gumboots for working in slushy or in inundated conditions are essential requirements to be
16. The contractor shall follow and comply with all GETCO safety Rules, relevant provisions of
applicable laws pertaining to the safety of workmen, employees, plant and equipment as may
be prescribed from time to time without any demur, protest or contest or reservations. In case
of any discrepancy between statutory requirement and GETCO safety rules referred above the
latter shall be binding on the contractor unless the statutory provisions are more stringent.
a. Fatal injury or accident Rs. 1,00,000/- per These are
Causing death person for death/ applicable
b. Major injuries or accident causing Rs. 20,000/- injury to any
25% or more permanent disablement per person person,
To workmen or employees
Permanent disablement shall have same meaning as indicated in workmen’s compensation Act.
The compensation mentioned above shall be in addition to the compensation payable to the
workmen/ employees under the relevant provisions of the laws as applicable from time to time.
In case the owner is made to pay such compensation then the contractor is liable to reimburse
the owner such amount in addition to the compensation indicated above.
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
Gujarat Energy Transmission Corporation Ltd.
TENDERER’S EXPERIENCE
A List of Similar jobs executed by the Contractor &Name with address of a Person whom reference can
be made, by the Corporation, if required necessary.
[Tenderers shall submit the information in the Format detailed here under]
Sr. Descriptio Value Constructi Actual Date Clien Persons Principal
No Of Work Constructio Of to Features
of Work Period n
Executed Completion whom
Contract for the
Contractor’s Representative legible signature: ______________________
Seal of the company
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
Gujarat Energy Transmission Corporation Ltd.
WORKS TENDERED / IN HAND
Details of other Works, tendered for & in hand , as on the date of the Submission of this tender
[Tenderers shall submit the information in the
Format detailed here under]
Sr. Name of Work in hand Work Tender for Remarks
Tender Cost of Anticipated Estimated Date Stipulated
Cost Remaining Date of Cost Date or
work Completion on
Contractor’s Representative legible signature: ______________________
Seal of the company Date & place: _______________________________________________
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
Gujarat Energy Transmission Corporation Ltd.
TENDERER’S DETAILS OF PERSONNEL
The List of Technical Personnel intended to be placed at the Work by the Contractor.
[Tenderers shall submit in the Format detailed here under]
Sr. Description Name Qualification Professional Remarks
Contractor’s Representative legible signature: ______________________
Seal of the company
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
Gujarat Energy Transmission Corporation Ltd.
TENDERER’S DETAILS OF MACHINERY
The List of Technical Personnel intended to be placed at the Work by the Contractor.
[Tenderer shall submit in the Format detailed here under.
Sr. Description & Capacity Numbers Make Remarks
Contractor’s Representative legible signature: ______________________
Seal of the company
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
Gujarat Energy Transmission Corporation Ltd.
PERFORMA, SHOWING THE DETAILS OF SITE VISIT DONE BY AGENCY BEFORE QUOTING THE TENDER.
[Tenderers shall submit in the Format detailed here under]
Sr. Name of Name of Qualification Designation / Remarks.
firm post holding in
representative of
firm who has visited
Contractor’s Representative legible signature: ______________________
Seal of the company
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
Gujarat Energy Transmission Corporation Ltd.
Qualification Requirement.
Contractor must fill up below details & should place at the top of the Technical Bid.
Sr No: List of Documents
1 Registration Class – with valid up to
3 Partnership deed/Proprietor (Notarized
4 Power of Attorney (Notarized copy)
5 Bl. Sheet / P&L A/C, Statement of last three
6 Latest Solvency certificate. Rs. Lacs issued by Bank, branch dtd.
GST Registration No.
9 Experience certificate – form 3A of last
years (minimum value of similar work done
should be equal to or more than 50% of
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
Qualification Requirement. Contractor must fill up above details
1. PRICES: [FIRM ONLY]
(Please Specify YES / NO.)
2. PENALTY TERMS AGREED
(Please Specify YES / NO.)
3. SECURITY TERMS AGREED:
(Please Specify YES / NO.)
4. TERMS AGREED:
(Please Specify YES / NO.)
5. VALIDITY Of the offer for 180 DAYS From the date of opening
of the Technical Bid: AGREED:
(Please Specify YES / NO.)
6. PAYMENT TERMS AGREED:
(Please Specify YES / NO.)
7. MOBILE NOS., TELEPHONE NOS. & FAX NO:
8. Authorized person of the firm :
9. Name of the proprietor, partners, directors [as the case may
be], along with address, telephone, fax no. etc.
Signature of Tenderer Company’s Round Seal
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
Placing Vendors/Contractors for Purchase/Works in a Stop deal/Banned for business dealing /
1.1. Stop deal / banned for business dealing / blacklist means debarment of parties from participating
in the tendering process.
1.1.1. Firm will mean Bidder / Licensor / Tendered / Consultant / Vendor /
1.1.2. Reasons for Putting a Firm on Stop deal / banned for business dealing /
Blacklisting is to protect the GUVNL and its subsidiary Companies from dealing with an
undesirable firm.
1.2. The list of indicative reasons for placing the firm in a Stop deal / banned for business dealing /
Blacklist are as under.
A Firm will be placed in a Stop deal / banned for business dealing / blacklist, if the Firm-
1.2.1. Has submitted fake, false or forged documents / certificates,
1.2.2. Has revised / withdrawn price bid after opening of Techno – commercial bid, until and
unless it is sought for,
1.2.3. Has tampered with the stipulated tendering procedure.
1.2.3. Has refused to accept letter of Acceptance / purchase Order / Work Order
after the same is issued by the Company within the validity period and as per agreed terms
and conditions,
1.2.5. Has committed breach of contract or has failed to perform a contract or has abandoned the
1.2.6. Has failed to provide suitable expertise for the work as per per-scheduled Program.
1.2.7. Has failed to submit all the necessary tests reports / documents within time schedule / as
per company’s time limit, as mentioned in the LOI, if the letter of Acceptance (LOA) is placed
subject to submission of type reports / documents to the firm.
1.2.8. Has indulged in construction and erection of defective works.
1.2.9. Has supplied inferior quality / defective materials and refused to replace with stipulated
time frame, as specified by the company,
1.2.10. Has substituted materials in lieu of materials supplied by the company or has not returned
or has short returned or has unauthorisely disposed of materials / documents / drawings / tools
or plants or equipment supplied by the Company,
1.2.11. Has involved in malpractices such as bribery, corruption, fraud, canvassing and pilferage,
1.2.12. Has unauthorisely obtained official company information or copies of documents, in
relation the tender / Contract.
1.2.13. Has failed to follow the stipulated mode of communication, if specified by the endering
authority / purchaser.
1.2.14. Has parted with, leaked or provided confidential / proprietary information of the Company
given to the firm only for its use (in discharge of its obligation against an order) to any
third party without prior consent of the Company,
1.2.15. Any other ground for which in opinion of the company makes it undesirable to deal with
1.2.16. In case the State Government directs the Company to place a firm in stop dealing / banned
for business dealing / banned for business dealing / blacklisting.
1.3. Every bidder should at the time of submission of bid, give a declaration that bidder and / or
proprietor / partner / Director of the firm has not been placed on stop dealing / banned for
business dealing / blacklisting by GUVNL and It’s any subsidiary Companies as per ANNEXURE-VIII
(as per attached format).
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
(On the letter head of the firm/company)
(UNDERTAKING IN REGARD TO STOP DEAL / BANNED FOR BUSINESS DEALING/ BLACK LIST THEREOF)
Sub: Undertaking in regard to Stop Deal/ Banned for Business dealing/ Black List thereof
Ref: Tender Notice No
All bidders will have to furnish the following undertaking dully filled in, signed and stamped for each
quoted item of the tender along with the Technical Bid.
proprietor / any partner / any directors of the firm are not stop deal and / or banned for business
dealing and / or black listed by GUVNL and / or their any subsidiary company viz. GSECL / GETCO /
DGVCL / MGVCL / UGVCL / PGVCL.
Seal of the Firm Signature of
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
BIDDER’S DETAILS OF PERSONNEL
(ALL DETAILS MUST BE FILLED BY CONTRACTOR)
3 Firm Type (Proprietary/ Partnership)
4 Contact Person Name and Designation
5 Qualification
6 Professional Experience
9 P.F Registration No.
10 Contract Details
Note: All the correspondence, queries etc., will be asked on above E-Mail only.
Bidder is responsible to check and operation of e-mail ID.
Sign & Signature of Bidder
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
(Format for Guarantee Card)
FORMAT FOR GUARANTEE CARD TO BE SUPPLIED WITH EACH GRID CONNECTED SOLAR PV
1 Name & Address of the Empanelled Agency
2 Name & Address of DISCOM
3 Name & Address of BENEFICIARY
3 Date of Commissioning of the system
4 Details of PV Module (s) supplied in the System Make (Name
of the EOI applicant):
Model Serial No(s)
Wattage of the PV Module (s) under STC Guarantee valid up
5 Details of PCU/Electronics & other BOS items:
System Make (Name of the EOI applicant) Model
Serial No(s) Guarantee valid up to
6 Designation & Address of the person to be Contacted for
claiming Guarantee obligations
7 Local Service Centre Address:
The grid tied solar system is warranted for its performance for a period of five years and the Empanelled
Agency/Supplier (undersigned) undertakes to replace the components which do not perform as per specifications,
due to manufacturing defect, at no cost to the beneficiary as per EOI Conditions.
(Signature) (SEAL)
Name & Designation, Name & Address of the Agency
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
(During the guarantee period GETCO reserves the right to cross check the performance of the systems with the
minimum performance levels specified in the EOI Document specifications).
QUARTERLY MAINTENANCE & SERVICING REPORT
1. DETAILS OF SOLAR PHOTOVOLTAIC SYSTEM INSTALLED
1. Supplied by :
2. Date of installation :
3. Servicing period : From to
2. USER PROFILE
1. Name and address of User:
3. TECHNICAL DETAILS
1. Module Capacity, make and serial numbers :
2. Inverter Capacity, make and serial no.
4. CHECK OF THE PRODUCT
1. Correct inclination and orientation of SPV panel :
2. Cleaning of dust from SPV panel :
3. Interconnection of modules, charge controller etc.:
4. Fuse of charge controller:
5. Working of inverter
5. DIFFICULTIES IN OPERATION/ PROBLEM FACED BY USER:
6. DIAGNOSIS DETAILS/ REPAIR ACTION:
7. DATE ON WHICH SYSTEM WAS LAST ATTENDED:
8. IT IS MANDATORY TO SUBMIT INSTALLATION WISE QUARTERLY ENERGY GENERATION DATA
TO RESPECTIVE GETCO OFFICE.
User Name & Signature Technician’s Name & Signature
Date: (with rubber stamp)
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
Project completion Report for individual Grid connected Solar PV plant
Preform-A (by the installer)
Sr. Component Observation
1 Sanction No & Date
2 Category: Nodal Agency / Channel partner Name and Complete
In case of Nodal Agency,Name and Complete Address of
Site / Location
Longitude/ Latitude Type
4 Solar PV Array Capacity:
4.1 Make of Modules Whether imported or indigenous?
IEC certificate :
Whether RFID tag is pasted or not?
If so, tag is inside or outside. If not, the reason?
5 Support Structures/
5.1 Indigenous or imported
5.2 Tracking System/ Fix (No tracking)
5.3 Seasonal Tilt Angle adjustment
6 Grid-Tie inverter details
Motor Pump set Capacity (h. p.)
(Beneficiary’s)
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
7 Electronics / controls
7.1 MPPT provided or not? If yes, provide details
7.2 Details of Inverter
8 Monitoring Mechanism for the installed
Technical Person Trained to maintain the system
Name of the person with Mobile no.
Date of Commissioning
(Enclose test certificate of System as per MNRE requirement)
10 Copy of invoice and details of loan if taken from any bank
It is to certify that all the components / sub systems and materials including junction
boxes, cables, distribution boards, switches, circuit breakers used in the system are as per
GETCO requirement.
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
Sr.No. Component Observation
Name of MGVCL Office With consumer Name
1 Consumer No, Contraced Load
Location with GPS Lat &Long
Whether training was provided by installer for
operation and maintenance
Whether the following documents were provided
4 I-V curves of all modules
Inverter manual
Guarantee card for system
5 Date of handing over of the system
Total project cost:
Preform -B (By the customer i.e. GETCO )
It is to certify that all information given above is true and correct to best of my knowledge
(User signature and stamp)
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
Proforma -C Inspection report (by The Engineer In Charge)
Sr. No. Component Observation
1 Site / Location with Complete
Capacity of system
Installed (kWp)
Whether the system was installed in shadow free area
or not? If not mention the details
3 Any inter module shading exists or not
Whether the modules contains information about
company name, serial no and year manufacturing
RIFD pasted inside or outside
Electronics / controls
4 Whether the information given in
part A is same or found any deviation
6 Structures:- tracking / fix
7 Cables Make and size
8 User Feed Back
9 Any Specific problem
1. Signature of inspecting Officer and date
List of enclosures:
1. Copy of invoice billed to user
2. List of serial no. of modules installed in the system
3. Test certificates of the components
4. Statement of expenditure
5. Original Colour photographs
Signature of the bidder
Seal of the Firm
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
CONTRACT AGREEMENT
(To be submitting after Awarding of Contract) (Non judicial stamp paper of Rs. 300/-)
This agreement is made at , on the day of
_in the Christian year………………..…..………
(here in after referred to as “THE CONTRACTOR” which expression shall unless excluded by
or repugnant to context include its successors or permitted assigns) of the one part and the
Gujarat Energy Transmission Corporation Limited, having their registered Office at Vidyut
Bhavan, Race Course, Vadodara ( hereinafter c a l l e d “ Corporation” w h i c h
e x p r e s s i o n s h a l l u n l e s s excluded by or repugnant to the context include its
successors or assigns) of the other part. “WHEREAS” the aforesaid Corporation has
accepted the tender of the aforesaid contractors for work Tender for Survey, Design,
Supply, Installation, Testing, Commissioning and Comprehensive Maintenance for 5 years
of Distributed Grid-connected Solar PV plants at various under
Dhanera AM Divisions under Palanpur Circle. (PHASE - II)
Corporation’s Order No. ………………………………………………………………………………………………..
…………………………………………………..……….._hereinafter called “The works” and more
particularly described enumerated or referred to in the specification, terms and conditions
prescribed in the order letter, covering letter arid other letters and schedule of
price which for the purpose of identification have been signed by
Contractors and by SE Circle Office, Palanpur on behalf of the Corporation, a list where of is
made out in the schedule hereunder written and all of which said documents are deemed
to form part of this contract and included in the expression ‘The Works” wherever herein
used, upon the terms and subject to the conditions hereinafter mentioned. AND WHEREAS
THE GETCO has accepted the tender of the contractor for the work
of Tender for Survey, Design, Supply, Installation, Testing, Commissioning and Comprehensive
Maintenance for 5 years of Distributed Grid-connected Solar PV plants at various under
Dhanera AM Divisions under Palanpur Circle. (PHASE - II)
of Gujarat State for the sum of Rs……………………………………..……..…….
upon the terms and subject to the conditions herein mentioned.
NOW THIS AGREEMENT WITNESSES AND IT IS HEREBY AGREED AND DECLARED THAT:
1. The contractors shall do and perform all works and things in this contract
mentioned and described or which are implied therein or there from respectively or are
reasonably necessary for the completion of the works as mentioned and at the times, in
the manner and subject to the terms conditions and stipulations contained in this
contract, and in consideration of the due provision, executions, construction and
completion of the works agreed to by the contractors as aforesaid, the Corporation
doth hereby covenant with the contractor to pay all the sums of money as and when
they become due and payable to the contractors under the provisions of the contract.
Such payment to be made at such times and in such manner as is provided by the
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
2. The conditions and covenants stipulated hereinbefore in this contract, are subject
to and without prejudice to the rights of the Corporation to enforce penalty for delays
and / or any other rights whatsoever including the right to reject and cancel on default
or breach by the contractors of the conditions and the covenants as stipulated in the
general conditions, specifications, forms, or tender schedule,
drawing, etc. attached with Corporation’s Order
3. The contracts value, extent of wo r ks / supply, completion / delivery dates,
specifications and other relevant matters may be altered by mutual agreement and if
so altered shall not be deemed or construed to mean or apply to affect or alter other
terms and conditions of the contract and the general conditions and the contract so
altered or revised shall be and shall always be deemed to have been subject to and
without prejudice to said stipulation.
In witness where of the parties here to have set their hands and seals this day and month
year first above written.
Signed, Sealed and Delivered by
for and on behalf of M/s.
In the presence of, signature with names and
Signed, Sealed and Delivered by
for and on behalf of Gujarat Energy Transmission Corporation Limited,
In the presence of, signature with names and
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
SAFETY CUM INDEMNITY BOND
(On Non-Judicial Stamp paper of value not less than Rs. 300.00)
KNOW ALL MEN BY THESE PRESENTS that we,
INDEMNITY BOND Executed on this ……………………….Day of
…………………………………………………………….. I/We Having registered Office
“THECONTRACTOR” which expression shall mean and includes my /our heirs, executors,
administrators and legal representatives, successors and permitted assigns) do hereby
binds myself/ourselves and also our company/firms after having the power to bind by this
promise and undertaking in favour of the Gujarat Energy Transmission Corporation Limited
(GETCO), Vadodara a State Transmission Utility under The Electricity Act, 2003 having its
registered office at Sardar Patel Vidyut Bhavan, Race course, Vadodara.( hereinafter called
as GETCO, which expression shall mean and include its legal representative, administrators
assigns) has agreed under the terms and conditions of the
e between M/s GETCO, Palanpur and
Tender for Survey, Design, Supply, Installation, Testing, Commissioning and Comprehensive
Maintenance for 5 years of Distributed Grid-connected Solar PV plants at various under
Dhanera AM Divisions under Palanpur Circle. (PHASE - II)
value of Rs. ……………………………………………………………………………………………………..interalia on
production of Safety Cum Indemnity Bond.
We do hereby undertake and agree to Indemnify and keep Indemnified GETCO from time to
time to the extent of Rs………………………Rupees…………………………………………………………only
against any losses or damages, costs, charges and expenses caused to or suffered by
reason of the CONTRACTOR while Project, R&M, O&M work including work carried out
by outsourcing agency, failing to take proper care or not complying the guidelines given
hereunder as per Annexure-A and instructions which may be given from time to time during
the continuance of the contract and we further undertake to unconditionally pay the
amount claimed by the GETCO on demand and without demur to the extent aforesaid.
Whereas the CONTRACTOR has/have been awarded to execute the job/works
under order no………………………………………,datd for issued by the GETCO after
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
having observing necessary formalities, the details of which is described in the order
no……………………………………………………………………………….dated…………………..and whereas the
said job/works will be /likely to be done in places covered under Employees’ State
Insurance Act,1948 (ESI) and /or the Workmen C o m p e n s a t i o n A c t ,1923 a n d / or
other laws relating t o t h e L a b o u r Management and Welfare Act. (Respective
And whereas according to the condition of the Contract the CONTRACTOR is under obligation
to execute this Safety cum Indemnity Bond before the commencement of actual execution
Now the indenture witnesses that I/We the CONTRACTOR do hereby undertake to follow
the guidelines as per Annexure-A prepared by the GETCO.
Further we the CONTRACTOR agree that the GETCO shall be sole judge of and as to whether
there has been any breach of the guidelines as per Annexure-A of this bond and as to the
extent of the loss, damages, costs, charges and expenses caused to or suffered by the
We the CONTRACTOR further agree that our liability under this bond shall not be
discharged because of the change in the constitution of the GETCO or for the extension
of the time limit or for any other reason.
We the CONTRACTOR further agrees to the given terms and conditions
a. That t h e CONTRACTOR u n d e r t a k e s / undertake to indemnity a n d keep harmless
the GETCO from all claims, actions, proceedings and risk, damage danger to any person
whether belonging or not belonging to the. CONTRACTOR.
b. That the CONTRACTOR shall keep harmless the GETCO from all claims,
compensation, damages any proceedings in respect of any of its employee /
workmen under the Workmen Compensation Act or any other laws for the time being in
c. That, if during the course of execution of work as stated in the contract order
mentioned hereinabove issued by the OBLIGEE, it is found that the CONTRACTOR has not
complied with guidelines as per Annexure-A or terms and conditions / formalities within
the meaning of Employees’ State Insurance Act,1948 (ESI) or Workmen Compensation
Act 1923 or any other laws relating to the Labour Welfare for the time being in force,
and also has not observed the safety norms in accordance with the law prevailing at
the place of work/job to the satisfaction of the GETCO, the GETCO shall have the right to
stop the execution of work/job and the period of such stoppage shall not be taken into
account for the calculation of the total period of completion of work for which the
CONTRACTOR is responsible to complete the work/job and it will be deemed that
discontinuance was due to default of the CONTRACTOR .
d.That, if any time, due to exigency, GETCO as the Principle Employer, becomes
liable to pay any such compensation mentioned hereinabove, whether on failure of the
CONTRACTOR or for any other reason, the GETCO shall have the right to recover the said
amount from any amount receivable by GETCO or any bank guarantee deposited or anything
payable whether in connection with this contract or other contract by the CONTRACTOR to
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
e. That the CONTRACTOR is/are aware and accept that for the persistent or repeated
violation of any guidelines as per Annexure-A and terms and conditions mentioned in this
Safety cum Indemnity Bond, GETCO shall have right to terminate the contract of work issued
to the CONTRACTOR.
f. In case if any safety related fatal Electrical / Mechanical accident occurred to any
employee of agency or outsider due to negligence or non-compliance of GETCO safety norms
then in addition to the compensation and liability as per statutory requirement, contractor
/ agency is hereby agreed to pay the penalty amount as given below:
Sr. No Amount of Contract in Rs. Penalty amount
1 Up to _1 Lac Rs.5, 000/-
2 Above1 Lac to _ 10 Lacs Rs.40, 000/-
4 100 Lacs 1.0 % of contract value
g.I/We the CONTRACTOR hereby confirm that in case of any dispute/difference for settlement
of claims under this Safety Cum Indemnity bond the courts in Gujarat State wherever
job/work is performed or as per GETCO norms shall have the jurisdiction to decide the rights
& liabilities of the parties while adjudicating the matter of claims under this Safety Cum
Indemnity Bond.
h. This Safety cum Indemnity Bond shall continue and hold good until it is released
b y the G E T C O i n Writing o n t h e C o n t r a c t o r ’ s a p p l i c a t i o n a f t e r t h e Contractor
has discharged all his obligations under the order mentioned hereinabove and submitted a
“NO DEMAND CERTIFICATE” from the GETCO under the said order. The Safety cum Indemnity
Bond shall be valid for a CONTRACT PERIOD and renewable thereof (Claim Period).
i. This Safety cum Indemnity Bond and the guidelines as per Annexure-A herein
contained are in addition to and not by way of limitation or substitution for any other
guarantee, indemnities Hereto before given to the GETCO by the CONTRACTOR and this
indemnity does not Revoke or limit such indemnities or guarantees. IN WITNESS WHEREOF
the Parties hereto have executed this indenture the day the year First hereinabove written.
(Signature with seal of The CONTRACTOR)
In the presence of:
Signature & Seal of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE OFFICE, PALANPUR –
Tender No: PTC/CM1/N-46/2026
NAME OF WORK: - Tender for Survey, Design, Supply, Installation, Testing,
Commissioning and Comprehensive Maintenance for 5 years of
Distributed Grid-connected Solar PV plants at various under
Dhanera AM Divisions under Palanpur Circle. (PHASE - II)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender SRT Dhanera Phase I I.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].