Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.2 LAccepted-AOC | ₹1.2 L | 1 | Accepted-AOC Lowest bid |
| 2 | 2₹1.3 L+₹8,072.34 (6.79%)Rejected-AOC | ₹1.3 L+₹8,072.34 (6.79%) | 2 | Rejected-AOC Highest bid |
| 3 | 3₹1.3 L+₹9,828.23 (8.27%)Rejected-AOC | ₹1.3 L+₹9,828.23 (8.27%) | 3 | Rejected-AOC Highest bid |
| 4 | 4₹1.3 L+₹14,670 (12.3%)Rejected-AOC | ₹1.3 L+₹14,670 (12.3%) | 4 | Rejected-AOC Highest bid |
Tender Value
₹1.5 L
EMD Value
₹3,809
Closing Date
25 Oct 2023, 6:00 pmClosed
Assistant Executive Engineer
Minor Irrigation Sub Division, Mini Civil Station, IInd Floor, Aranmula
GENERAL-Annual Maintenance of civil works 2023-24-Annual Maintenance of Iykkad LI - General Civil Work
2023_Irrig_614304_1
IRR/IA/TR/3845/2023_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
180 days
Aranmula
Please see the tender documents
7 documents required · 7 mandatory
₹555
Yes
₹3,809
Yes
29 Nov 2023
18 Oct 2023
28 Oct 2023
18 Oct 2023
25 Oct 2023
18 Oct 2023
Amount
Iykkad LI
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
13.7.2:12 mm cement plaster finished with a floating coat of neat cement of mix:1:4 ( 1 cement : 4 fine sand)
13.39.2:Colour washing such as green, blue or buff to give an even shade:New work (two or more coats) with a base coat of whiting
14.54.1:Painting with synthetic enamel paint of approved brand and manufacture of required colour to an give even shade:One or more coats on old work
14.5.1:Renewing glass panes, with putty and nails wherever necessary including racking out the old putty :Float glass panes of thickness 4 mm
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing
15.40.1:Dismantling precast concrete or stone slabs in walls, partition walls etc. including stacking within 50 metres lead:Thickness upto 40 mm
SABU K.S.
NANDU T M
MURALEEDHARAN M R
Bidder Name
SABU K.S.
P R PURUSHOTHAMAN NAIR
MURALEEDHARAN M R
NANDU T M
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_919468.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .