| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹59.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical | - | Rejected-Technical L6 | |
| 3 | Rejected-Technical | - | Rejected-Technical L4 | |
| 4 | Rejected-Technical | - | Rejected-Technical L5 | |
| 5 | Rejected-Technical | - | Rejected-Technical L3 |
| Sl No | Description | Qty | Unit | VISHNU J R L2 | D S PRADEESHKUMAR L6 | Hi Elect Enterprises L4 | SIJENDRA INNOTECH SOLUTIONS L1 | SUBASH S L3 | JINESH S L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Appendix 1 | |||||||||
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 1.61 | cum | 3,479.49 ₹5,601.98 | 4,205 ₹6,770.05 | 3,000 ₹4,830 Lowest | 3,284 ₹5,287.24 | 3,753.49 ₹6,043.12 | 4,110.07 ₹6,617.21 |
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 3.15 | cum | 2,018.24 ₹6,353.42 | 2,440 ₹7,681.12 | 1,750 ₹5,509 Lowest | 1,905 ₹5,996.94 | 2,177.17 ₹6,853.73 | 2,384 ₹7,504.83 |
| 1.00 | 15.56:Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 338.38 | sqm | 53.54 ₹18,116.92 | 65 ₹21,994.77 | 50 ₹16,919.05 Lowest | 50 ₹16,919.05 Lowest | 57.76 ₹19,544.89 | 63.25 ₹21,402.6 |
| 1.00 | 15.28.1:Dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :G.S. Sheet | 92.52 | sqm | 161.59 ₹14,950.31 | 195 ₹18,041.4 | 140 ₹12,952.8 Lowest | 152 ₹14,063.04 | 174.31 ₹16,127.16 | 190.87 ₹17,659.29 |
| 1.00 | 10.1:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 3,064.77 | kilogram | 110.57 ₹3,38,871.51 | 135 ₹4,13,743.82 | 150 ₹4,59,715.35 | 104 ₹3,18,735.98 Lowest | 119.28 ₹3,65,565.65 | 130.61 ₹4,00,289.48 |
| 1.01 | 15.13.2:Taking out doors, windows and clerestory window shutters (steel or wood ) including stacking within 50 metres lead:Of area beyond 3 sq. metres | 2 | each | 185.08 ₹370.16 | 225 ₹450 | 160 ₹320 Lowest | 175 ₹350 | 199.65 ₹399.3 | 218.62 ₹437.24 |
| 1.01 | 10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 15.12 | kg | 133.05 ₹2,011.72 | 160 ₹2,419.2 | 150 ₹2,268 | 125 ₹1,890 Lowest | 143.53 ₹2,170.17 | 157.17 ₹2,376.41 |
| 1.01 | 50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 2,531.87 | kg | 218.83 ₹5,54,048.89 | 265 ₹6,70,945.29 | 300 ₹7,59,560.7 | 206 ₹5,21,565.01 Lowest | 236.06 ₹5,97,673 | 258.49 ₹6,54,462.82 |
| 1.01 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 3,590.14 | kg | 177.24 ₹6,36,317.12 | 215 ₹7,71,880.96 | 300 ₹10,77,043.2 | 167 ₹5,99,554.05 Lowest | 191.2 ₹6,86,435.53 | 209.36 ₹7,51,632.55 |
Tender Value
₹67.5 L
EMD Value
₹50,000
Closing Date
29 Jun 2026, 5:00 pmClosed
Executive Engineer
O/o the Executive Engineer, KLC Construction Division, TVPM.
GENERAL Health Club at Annex II Construction of a health club above the canteen building of Annex II of the Government Secretariat General Civil Work
2026_PWD_856756_1
PWD/BLDG/TR/14840/2025_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
150 days
Gov. Secretariat, TVPM
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
₹50,000
Yes
13 Aug 2026
19 Jun 2026
1 Jul 2026
19 Jun 2026
29 Jun 2026
19 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix 1 | |||||
| 1.001 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | - | cum | - | - |
| 1.002 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | - | cum | - | - |
| 1.003 | 15.56:Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 0.4 | sqm | - | - |
| 1.004 | 15.28.1:Dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :G.S. Sheet | 1 | sqm | - | - |
| 1.005 | 10.1:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 0.6 | kilogram | - | - |
| 1.006 | 15.13.2:Taking out doors, windows and clerestory window shutters (steel or wood ) including stacking within 50 metres lead:Of area beyond 3 sq. metres | - | each | - | - |
| 1.007 | 10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 1 | kg | - | - |
| 1.008 | 50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 0.6 | kg | - | - |
| 1.009 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 0.6 | kg | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
formoftender.pdf
Tender Documents • 1.53 MB
integritypact.pdf
Tender Documents • 0.52 MB
sbd.pdf
Tender Documents • 1.63 MB
nit.pdf
Tender Documents • 0.03 MB
license.pdf
Tender Documents • 0.29 MB
e-payment.pdf
Tender Documents • 0.17 MB
preliminaryagreement.pdf
Tender Documents • 0.54 MB
BOQ_1448114.xls
BOQ • 0.31 MB
affidavit.pdf
Tender Documents • 0.36 MB
gst.pdf
Tender Documents • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .