Loading…
Loading…
Tender Value
₹50.3 Cr
EMD Value
₹50.3 L
Closing Date
3 Oct 2026, 6:00 pm6d left
Executive Engineer, Salinity Control Division, Porbandar
Integrated Irrigation, Drainage and Water Infrastructure Modernization Project in Sorthi Ghed Area Phase-2 Package-2:- Deepening and Desilting of Rivers and Drains, Sub Package-1:- Excavation and Re-Sectioning of Various Rivers/Drains in Sorthi Ghed Porbandar District.
341659
06 of 2026-27
Open
Civil Works - Others
Works
Porbandar
17 documents required · 15 mandatory · 2 optional
₹18,000
Executive Engineer, Salinity Control Division, Porbandar
₹50.3 L
3 Sept 2026
3 Sept 2026
3 Sept 2026
3 Oct 2026
3 Sept 2026
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Bid Security (Bank Gurantee Blank Form).pdf
Tender Notice No. 06 of 2026-27.pdf
DTP Ph.2 package 2 sub package-1 corrected finaal online upload.pdf
BOQ sorathi ghed phase 2 package 2 sub package 1 without rate.pdf
Corrigendum-1 Sorthi Ghed Area Phase-2 Package-2 sub pack-1.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .