| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹66.6 LAccepted-AOC | ₹66.6 L | 1 | Accepted-AOC 1 |
| 2 | 2₹70.2 LRejected-AOC | ₹70.2 L | 2 | Rejected-AOC 2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical 3 |
| 4 | Rejected-Technical NEREVEETTIL HOUSE THRIKKAKARA P O KOCHI 682 021 | ERNAKULAM | KERALA | 682021 | - | - | Rejected-Technical 4 |
| Sl No | Description | Qty | Unit | N J THOMAS L4 | A.M.ABDUL SALAM L1 | KAREEM.K.P L2 | Biju K A L3 |
|---|---|---|---|---|---|---|---|
| 1.00Market building | |||||||
| 1.00 | 15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar | 3.73 | cum | 1,190 ₹4,433.94 | 900 ₹3,353.40 | 1,101.54 ₹4,104.34 | 1,128.48 ₹4,204.72 |
| 1.00 | 15.7.1:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In mud mortar | 18.48 | cum | 750 ₹13,860 | 650 ₹12,012 | 670.44 ₹12,389.73 | 686.84 ₹12,692.80 |
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 6.58 | cum | 3,630 ₹23,881.77 | 3,300 ₹21,710.70 | 3,378.14 ₹22,224.78 | 3,460.76 ₹22,768.34 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 151.18 | cum | 257 ₹38,854.03 | 250 ₹37,795.75 | 237.02 ₹35,833.39 | 242.82 ₹36,710.26 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 19.85 | cum | 7,500 ₹1.5 L | 7,500 ₹1.5 L | 7,298.26 ₹1.4 L | 7,476.75 ₹1.5 L |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 98.24 | sqm | 400 ₹39,296 | 320 ₹31,436.80 | 355.27 ₹34,901.72 | 363.96 ₹35,755.43 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 35.24 | cum | 10,050 ₹3.5 L | 9,800 ₹3.5 L | 9,649.67 ₹3.4 L | 9,885.67 ₹3.5 L |
| 1.01 | 50.6.2.1:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement :6 coarse sand) etc complete | 19.89 | cum | 9,870 ₹2.0 L | 6,700 ₹1.3 L | 6,284.65 ₹1.2 L | 6,438.35 ₹1.3 L |
| 1.01 | 4.11: Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4
(1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone
aggregate 20mm nominal size derived from natural sources). | 38.64 | sqm | 520 ₹20,092.80 | 500 ₹19,320 | 521.77 ₹20,161.19 | 534.53 ₹20,654.24 |
Tender Value
₹76.3 L
EMD Value
₹50,000
Closing Date
3 Oct 2025, 6:00 pmClosed
Assistant Executive Engineer
Office of the Assistant Executive Engineer, LIDEW Section, Kalamassery Municipality
SO 222/26-Renovation of Kalamassery Market
2025_LSGD_800520_18
LIDEW/AEE/ET/16/2026
Open Tender
Civil Works - Others
180 days
Kalamassery
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
25 Apr 2026
27 Sept 2025
6 Oct 2025
27 Sept 2025
3 Oct 2025
27 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1333205.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_1333205.xls
BOQ • 0.26 MB
sbd18.pdf
Tender Documents • 1.63 MB
Download all tender documents and submit your bid