Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.6 LAccepted-AOC | L1 | Accepted-AOC Agreement executed on 25-06-2026 | |
| 2 | L2₹9.6 L+₹1.1 L (12.3%)Rejected-AOC | L2 | Rejected-AOC Second Lowest |
| Sl No | Description | Qty | Unit | ABAS V I L1 | Basheer N K L2 |
|---|---|---|---|---|---|
| 1.00muncipal well madathikandam | |||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 110.38 | cum | 246.2 ₹27,175.06 Lowest | 276.5 ₹30,519.52 |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 71.53 | cum | 125.21 ₹8,956.65 Lowest | 140.5 ₹10,050.39 |
| 1.00 | 5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) derived from natural
sources derived from natural
sources: 3 graded stone aggregate 20 mm nominal size derived from natural
sources derived from natural
sources) | 27.5 | cum | 9,410.76 ₹2,58,805.31 Lowest | 10,566 ₹2,90,575.57 |
| 1.00 | 5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining | 98.91 | sqm | 295.26 ₹29,204.17 Lowest | 331.51 ₹32,789.65 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 2,200.08 | kilogram | 107.45 ₹2,36,398.6 Lowest | 120.63 ₹2,65,395.65 |
| 1.01 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 24 | hour | 330.21 ₹7,925.04 Lowest | 370.76 ₹8,898.24 |
| 1.01 | OD461970/2025-2026:DRY RUBBLE MASONRY- Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of departmental officers at site. | 4.24 | cum | 3,815.2 ₹16,172.63 Lowest | 4,285 ₹18,164.12 |
| 1.01 | 50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 51.15 | kg | 220.69 ₹11,288.51 Lowest | 248 ₹12,685.45 |
| 2.00Pump House | |||||
Tender Value
₹9.0 L
EMD Value
₹22,451
Closing Date
22 May 2026, 2:00 pmClosed
Assistant Engineer, Thodupuzha Municipality
Assistant Engineer,LID EW Thodupuzha Municipality
Madathikkandam Drinking water Project in ward 10-Madathikkandam Drinking water Project in ward 10
2026_LSGD_842782_3
01/AE/LIDEW/TDPA/M/2025-26
Open Tender
Civil Works - Water Works
Item Rate
180 days
Thodupuzha municipality
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,980
Yes
₹22,451
Yes
30 Jun 2026
15 May 2026
23 May 2026
15 May 2026
22 May 2026
15 May 2026
15 May 2026 - 22 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1muncipal well madathikandam | |||||
| 1.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 0.2 | cum | - | - |
| 1.002 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 0.2 | cum | - | - |
| 1.003 | 5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) derived from natural
sources derived from natural
sources: 3 graded stone aggregate 20 mm nominal size derived from natural
sources derived from natural
sources) | - | cum | - | - |
| 1.004 | 5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining | 1 | sqm | - | - |
| 1.005 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1 | kilogram | - | - |
| 1.006 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | - | hour | - | - |
| 1.007 | OD461970/2025-2026:DRY RUBBLE MASONRY- Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of departmental officers at site. | 1 | cum | - | - |
| 1.008 | 50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | - | kg | - | - |
| 2Pump House | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
BOQ_1438026.xls
BOQ • 0.32 MB
viewnit.pdf
Tender Documents • 0.12 MB
viewsbd.pdf
Tender Documents • 2.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .