Tender Value
₹82.9 L
EMD Value
₹82,931
Closing Date
2 Mar 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Chief Officer, Una Nagarpalika, Una
DAY TO DAY SWEEPING AND CLEANING WORK AND BEAUTIFICATION WORK UNDER SWACHH SAHER SUNDAR SAHER YOJANA IN UNA NAGARPALIKA AREA SWACHH SAHER SUNDAR SAHER YOJANA IN UNA NAGARPALIKA AREA, UNA,DIST.GIR-SOMNATH
278565
UNANP/BEAUTIFIATION/T10/R00
Open
Civil - All
Gir Somnath
3 documents required · 3 mandatory
₹2,400
Chief Officer, Una Nagarpalika, Una
₹82,931
20 Feb 2026
20 Feb 2026
20 Feb 2026
2 Mar 2026
20 Feb 2026
Name Of Work AMOUNT
DAY TO DAY SWEEPING AND CLEANING WORK AT
SCHEDULE-"B1" VARIOUS LOCATION OF UNA NAGARPALIKA AREA,
UNA NAGARPALIKA, DIST. GIR-SOMNATH.
PROPOSED BEAUTIFICATION WORK UNDER SWACHH
SCHEDULE-"B2" SAHER SUNDAR SAHER YOJANA IN UNA
NAGARPALIKA AREA, UNA, DIST. GIR-SOMNATH.
One percent of the Estimated cost of work put to tender shall be recovered from the
running bills of the contractor as testing charges, after deducting the cost of material
proposed in scheduled-A at basic rate. One percent labour cess will be deducted from
contractor’s bill.
I/ We am/are willing to carry out the work at _____________________% above / below
(should be writtern in figure and words)
below / above the estimated rates mentioned above amount of my / our tender works out as
Estimated amount put to tender :
Signature of contractor Chief Officer
UNA NAGARPALIKA
1) All the work shall be carried out as per MOST specification and specification
2) Rates quoted includes clearance of site (prior to commencement of work and
at its closed) in all respects and held gross for under all conditions, site
moisture weather etc.
3) In RCC item when there is change in grade of concrete mix or change in
consumption of cement as per actual mix design then the difference in
consumption of cement shall be deducted from the rate of original item
valued at the star rate as mentioned in tender. However no extra payment
shall be made for use of additional Quantity of cement as per actual concrete
mix design. Concrete mix design shall be done in GERI laboratory only.
4) The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 /
1657 N Dt. 26–01-73 with detail of specification and details of work and
amount involved at site without any payment as directed by the Engineer in
5) Testing of materials be as per statement attached with the Specifications,
the materials shall be tested in G.E.R.I. Bill for testing shall be paid by the
Executive Engineer and 1% of the (one percent) of amount put to tender
after shall be recovered from the running account bills of the works. (As per
G.R. (R&B) Deptt., No. TNC/1085/4/C dtd. 20.12.91.
6) The contractor shall quote even "NIL" if no reduction is proposed.
7) One precent of estimated cost put to tender for this work shall be recovered
from the contract payments as "LABOUR CESS". In terms of the Gujarat
Government Gazette Extra ordinary dated 12.12.04. Implementation of
building and other construction workers regulation of equipments and
conditions of service Act-1996)
8) Photographs of before work and after work will be submitted by the
contractor at the time of each bill submission.
Signature of contractor Chief Officer
UNA NAGARPALIKA
UNA NAGARPALIKA
DAY TO DAY SWEEPING AND CLEANING WORK AND BEAUTIFICATION WORK UNDER SWACHH SAHER SUNDAR
Name of Project
SAHER YOJANA IN UNA NAGARPALIKA AREA SWACHH SAHER SUNDAR SAHER YOJANA IN UNA NAGARPALIKA
AREA,UNA,DIST.GIR-SOMNATH.
Name of work : DAY TO DAY SWEEPING AND CLEANING WORK AT VARIOUS LOCATION OF UNA NAGARPALIKA AREA, UNA
NAGARPALIKA, DIST. GIR-SOMNATH.
Ite Quantities Item Descrption Estimated Rates Unit Total Amount
Ite Quantities Item Descrption Estimated Rates Unit Total Amount
m Estimated according to
No. but may be in in Words estimated
more or Figure quantities.
cleaning road and disposal proper place including all Rupees Four Hundred Ninety One
1A 632.67 labour and trasporation GVP Point 491.87 and Eighty Seven Paise Sqmt.
cleaning road and disposal proper place including all Rupees Four Hundred Ninety One
1B 3412.75 labour and trasporation Nirmal Path/iconic road 491.87 and Eighty Seven Paise Sqmt.
cleaning road and disposal proper place including all
labour and trasporation Garden Rupees Four Hundred Ninety One
1C 4376.96 491.87 and Eighty Seven Paise Sqmt.
cleaning road and disposal proper place including all
labour and trasporation PUBLIC TOILET ,ASP TOILET & Rupees Four Hundred Ninety One
1D 1664.40 URINAL 491.87 and Eighty Seven Paise Sqmt.
cleaning road and disposal proper place including all Rupees Four Hundred Ninety One
1E 730.00 labour and trasporation Comercial Area 491.87 and Eighty Seven Paise Sqmt.
cleaning road and disposal proper place including all Rupees Four Hundred Ninety One
1F 949.00 labour and trasporation Main Road-State Highway 491.87 and Eighty Seven Paise Sqmt.
One percent of the Estimated cost of work put to tender shall be recovered from the running bills of the contractor as testing charges,
after deducting the cost of material proposed in scheduled-A at basic rate. One percent labour cess will be deducted from contractor’s
I/ We am/are willing to carry out the work at _____________________% above / below _____________________________%
(should be writtern in figure and words)
below / above the estimated rates mentioned above amount of my / our tender works out as under :-
Estimated amount put to tender : Estimated amount put to tender :
Signature of contractor Chief Officer
UNA NAGARPALIKA
1) All the work shall be carried out as per MOST specification and specification on the division or as directed.
2) Rates quoted includes clearance of site (prior to commencement of work and at its closed) in all respects and held gross for under all
conditions, site moisture weather etc.
3) In RCC item when there is change in grade of concrete mix or change in consumption of cement as per actual mix design then the difference in
consumption of cement shall be deducted from the rate of original item valued at the star rate as mentioned in tender. However no extra
payment shall be made for use of additional Quantity of cement as per actual concrete mix design. Concrete mix design shall be done in GERI
laboratory only.
4) The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 / 1657 N Dt. 26–01-73 with detail of specification and details of
work and amount involved at site without any payment as directed by the Engineer in charge.
5) Testing of materials be as per statement attached with the Specifications, the materials shall be tested in G.E.R.I. Bill for testing shall be paid
by the Executive Engineer and 1% of the (one percent) of amount put to tender after shall be recovered from the running account bills of the
works. (As per G.R. (R&B) Deptt., No. TNC/1085/4/C dtd. 20.12.91.
6) The contractor shall quote even "NIL" if no reduction is proposed.
7) One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the
Gujarat Government Gazette Extra ordinary dated 12.12.04. Implementation of building and other construction workers regulation of
equipments and conditions of service Act-1996)
8) Photographs of before work and after work will be submitted by the contractor at the time of each bill submission.
Signature of contractor Chief Officer
UNA NAGARPALIKA
UNA NAGARPALIKA
Name of Project : DAY TO DAY SWEEPING AND CLEANING WORK AND BEAUTIFICATION WORK UNDER SWACHH SAHER
SUNDAR SAHER YOJANA IN UNA NAGARPALIKA AREA SWACHH SAHER SUNDAR SAHER YOJANA IN UNA
NAGARPALIKA AREA,UNA,DIST.GIR-SOMNATH.
Name of work : PROPOSED BEAUTIFICATION WORK UNDER SWACHH SAHER SUNDAR SAHER YOJANA IN UNA
NAGARPALIKA AREA, UNA, DIST. GIR-SOMNATH.
Item Quantities Item Descrption Estimated Rates Unit Total Amount
Item Quantities Item Descrption Estimated Rates Unit Total Amount
No. Estimated according to
but may be in Figure in Words estimated
more or less quantities.
1 drawing picture on existing wall including finishing
surface and all paint, colour and required material
and as per guide nagarpalika engineer (Related
swachchha bhrat mission, climate exchage and other
save water etc) (RA) Various Garden Rupees One Thousand Fifty and
666.00 1050.40 Forty Paise Sqmt.
2 Providing New Plantetion for Flower, Trees, Decorative
outdoor plants etc. incl. all labour charges, Transportation
charges and material charges (RA)TREE PLANTATION Rupees Five Hundred Eighty
125.00 RIVER & LAKE AREA 583.78 Three and Seventy Eight Paise No.
3 Providing and fixing Tree Guard of required pattern to
MS Angle frames with M.S. flats at required spacing's and
frame around with 16 SWG Jali, oil paint with all
types of tax, loading, unloading, transportation,
etc. complete and dimension shown in the details drawing
attached herewith. PLANTATION RIVER & LAKE AREA Rupees Two Thousand Nine and
125.00 2009.87 Eighty Six Paise Sqmt.
4 drawing picture on existing wall including finishing
surface and all paint, colour and required material
and as per guide nagarpalika engineer (Related
swachchha bhrat mission, climate exchage and other
save water etc) Fly-Over Beautification Rupees One Thousand Fifty and
200.00 1050.40 Forty Paise Sqmt.
5 drawing picture on existing wall including finishing
surface and all paint, colour and required material
and as per guide nagarpalika engineer (Related
swachchha bhrat mission, climate exchage and other
save water etc) Nr.Bus Station Rupees One Thousand Fifty and
22.50 1050.40 Forty Paise Sqmt.
6 Finishing wall with weather proof exterior emulsion
paint on wall surface (two coats) to give an required
shape even shade after thoroughly brushing the
surface to remove all dirt, and remains of loose
powdered materials.etc complete Light Poll (Round Rupees One Hundred Twenty
126.00 Pole) 120.26 and Twenty Six Paise No.
7 Providing and Fixing in Position Lion Face shape Decorative
Structure and fixing at Electrical Pole. Structural steel work
(Confirming to IS 4923- 1997) riveted, bolted or welded in
built-up for all type sections, in framed work, including
cutting, poisting, fixing in position and applying a priming
coat of approved steel primer all complete as per the
structural designs and directions of Engineer in charge.
(Sr. No. 20054, It.No. 11.23)Light Poll (Round Pole) Rupees One Hundred Thirty One
1350.00 131.83 and Eighty Two Paise Kg
8 Supplying and erecting LED indoor fittings with LEDs of
wattage 0.2 Watt to 0.5 Watt assembled on single MCPCB,
with housing used as a heat sink shall be made of thick
sheet Steel conforming to IS: 13/CRCA/aluminium
pressure die cast powder coated and high U.V. & corrosion
resistance with diffuser housed in aluminium casted body
with company mark/name 160V to 270V,Power Factor more
than 0.95, THD < 15 %,CCT 3000 K to 6500K, Luminaire
efficacy> 85 lumens/watt , LED driver efficiency > 85 %(
fitting required LM-79 & LM-80 Certificates)(NOTE: Below
description have shown ranges of Wattage capacity of LED
fittings.The Engineer incharge may select any wattage
capacity between the ranges shown.)(D) LED Strip Light (i)
Minimum 4.8W-120 LED per meter (2 wire, IP-65) with non
integral uitable Driver complete Cat-ll( R & B Electrical SOR Rupees Eighty Eight and Eighty
3000.00 ITEMNO.2-15-3(D) 88.88 Eight Paise Kg
9 Finishing wall with weather proof exterior emulsion
paint on wall surface (two coats) to give an required
shape even shade after thoroughly brushing the
surface to remove all dirt, and remains of loose Rupees One Hundred Twenty
1000.00 powdered materials.etc complete Public Toilet 120.26 and Twenty Six Paise No.
10 Finishing wall with weather proof exterior emulsion
paint on wall surface (two coats) to give an required
shape even shade after thoroughly brushing the
surface to remove all dirt, and remains of loose Rupees One Hundred Twenty
375.00 powdered materials.etc complete Railway Station 120.26 and Twenty Six Paise m2
11 Finishing wall with weather proof exterior emulsion
paint on wall surface (two coats) to give an required
shape even shade after thoroughly brushing the
surface to remove all dirt, and remains of loose
powdered materials.etc complete Wall Of Public places Rupees One Hundred Twenty
1447.00 120.26 and Twenty Six Paise No.
12 Providing & Erecting various type of following Twin Bins as
per standard manufacture and as per direction by
municipality Incl. cost of required size foundation
with cement concrete 1:2:4 (1: cement : 2 coarse sand :
4- 20mm nominal size crushed stone aggregate) with
curing etc. complete as per directed by Engineer-in-
charges. The work included all type of labour,
Installation Charges, Material charges, Transportation
Rupees Eight Thousand Nine
Charges & also including all types taxes &
Hundred Eighty Four and Ninety
Government charges Main City Road
50.00 8984.96 Six Paise Sqmt.
One percent of the Estimated cost of work put to tender shall be recovered from the running bills of the contractor as testing charges,
after deducting the cost of material proposed in scheduled-A at basic rate. One percent labour cess will be deducted from contractor’s
I/ We am/are willing to carry out the work at _____________________% above / below _____________________________%
(should be writtern in figure and words)
below / above the estimated rates mentioned above amount of my / our tender works out as under :-
Estimated amount put to tender : Estimated amount put to tender :
Signature of contractor Chief Officer
UNA NAGARPALIKA
1) All the work shall be carried out as per MOST specification and specification on the division or as directed.
2) Rates quoted includes clearance of site (prior to commencement of work and at its closed) in all respects and held gross for under all conditions,
site moisture weather etc.
3) In RCC item when there is change in grade of concrete mix or change in consumption of cement as per actual mix design then the difference in
consumption of cement shall be deducted from the rate of original item valued at the star rate as mentioned in tender. However no extra
payment shall be made for use of additional Quantity of cement as per actual concrete mix design. Concrete mix design shall be done in GERI
laboratory only.
4) The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 / 1657 N Dt. 26–01-73 with detail of specification and details of work
and amount involved at site without any payment as directed by the Engineer in charge.
5) Testing of materials be as per statement attached with the Specifications, the materials shall be tested in G.E.R.I. Bill for testing shall be paid
by the Executive Engineer and 1% of the (one percent) of amount put to tender after shall be recovered from the running account bills of the
works. (As per G.R. (R&B) Deptt., No. TNC/1085/4/C dtd. 20.12.91.
6) The contractor shall quote even "NIL" if no reduction is proposed.
7) One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS". In terms of the
Gujarat Government Gazette Extra ordinary dated 12.12.04. Implementation of building and other construction workers regulation of
equipments and conditions of service Act-1996)
8) Photographs of before work and after work will be submitted by the contractor at the time of each bill submission.
Signature of contractor Chief Officer
UNA NAGARPALIKA
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01 SBD.pdf
02 Mile Stone Dates and Tender Nivida.pdf
03 Schedule-B.pdf
04 Qualification Criteria.pdf
05 Material Testing Schedule.pdf
06 Specification Index.pdf
07 Details of Work.pdf
08 Paripatra.pdf
09. Vendor Civil work.pdf
10 BUILDING SPECIFICATIONS.pdf
12. CIVIL SPECIFICATIONS.pdf
11 ELECTRIC SPECIFICATION.pdf
13- MAKE LIST - Electrical .pdf
14-LED light Specification.pdf
15. Terms and Conditions.pdf
Download all tender documents and submit your bid