Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.4 LAccepted-Finance | ₹37.4 L | L1 | Accepted-Finance Admitted |
| 2 | L2₹40.7 L+₹3.4 L (9.02%)Accepted-Finance | ₹40.7 L+₹3.4 L (9.02%) | L2 | Accepted-Finance Admitted |
| 3 | L3₹41.1 L+₹3.7 L (10.0%)Accepted-Finance D NO 58 20 33 FLAT NO F 2 VAIKUNTAPARVATHI RESIDENCY APSEB COLONY BUTCHIRAJUPALEM VISAKHAPATNAM 530 027 | VISAKHAPATANAM | ANDHRA PRADESH | 530027 | ₹41.1 L+₹3.7 L (10.0%) | L3 | Accepted-Finance Admitted |
| 4 | L4₹41.4 L+₹4.1 L (10.9%)Accepted-Finance | ₹41.4 L+₹4.1 L (10.9%) | L4 | Accepted-Finance Admitted |
| 5 | L5₹41.6 L+₹4.2 L (11.3%)Accepted-Finance DOOR NO 10 89 BC COLONY PAPAYYARAJUPALEM SUJATHANAGAR VISAKHAPATNAM 530 051 | VISAKHAPATANAM | ANDHRA PRADESH | 530051 | ₹41.6 L+₹4.2 L (11.3%) | L5 | Accepted-Finance Admitted |
| Sl No | Description | Qty | Unit | M/s SIRI CONSTRUCTIONS L7 | venkata sai constructions L3 | pavan putra enterprises L9 | SRI THULASI TECH L6 | SRI BHAVANI ENTERPRISES L1 | Vara Enterprises L2 | SRI SAI RAM ENTERPRISES L4 | SAI SRINIVAS CONSTRUCTIONS L8 | M/s KAMADHENU ENGINEERING CONSTRUCTIONS L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| .01SCHEDULE 'A' PART-I: B/R WORKS | ||||||||||||
| 1.00 | Taking down chowkat with shutter (without taking off shutters from the frame) not exc 1.5 Sqm each complete all as specified and as directed. | 10 | Each | 376.25 ₹3,762.5 | 367.5 ₹3,675 | 385 ₹3,850 | 372.75 ₹3,727.5 | 350 ₹3,500 Lowest | 350 ₹3,500 Lowest | 350 ₹3,500 Lowest | 378 ₹3,780 | 400 ₹4,000 |
| 2.00 | Taking down chowkat with shutter (without taking off shutters from the frame) exc 1.5 Sqm but n exc 4.0 sqm each complete all as specified and as directed. | 10 | Each | 322.5 ₹3,225 | 315 ₹3,150 | 330 ₹3,300 | 319.5 ₹3,195 | 300 ₹3,000 Lowest | 360 ₹3,600 | 300 ₹3,000 Lowest | 324 ₹3,240 | 400 ₹4,000 |
| 3.00 | Taking down shutters of any description nexc 1 sqm complete all as specfied and as directed. | 10 | Each | 161.25 ₹1,612.5 | 157.5 ₹1,575 | 165 ₹1,650 | 159.75 ₹1,597.5 | 150 ₹1,500 Lowest | 160 ₹1,600 | 150 ₹1,500 Lowest | 162 ₹1,620 | 200 ₹2,000 |
| 4.00 | Taking down shutters of any description exc 1 sqm but nexc 2 sqm complete all as specfied and as directed. | 10 | Each | 161.25 ₹1,612.5 | 157.5 ₹1,575 | 165 ₹1,650 | 159.75 ₹1,597.5 | 150 ₹1,500 Lowest | 160 ₹1,600 | 150 ₹1,500 Lowest | 162 ₹1,620 | 220 ₹2,200 |
| 5.00 | M&L for second class hardwood plain, solid, straight chowkats and frames, wrought, framed rebated on the solid, rounded or chamfered, put together with glue pinned at joints, supplied and fixed complete all as specified and directed. | 0.5 | Cum | 1,07,500 ₹53,750 | 1,05,000 ₹52,500 | 1,10,000 ₹55,000 | 1,06,500 ₹53,250 | 1,00,000 ₹50,000 Lowest | 1,20,000 ₹60,000 | 1,00,000 ₹50,000 Lowest | 1,08,000 ₹54,000 | 1,04,000 ₹52,000 |
| 6.00 | M&L for 30 mm thick Flush shutters, solid core construction, with block board core and plywood face panels, commercial type on both sides complete all as specified and as directed. | 18 | Sqm | 2,795 ₹50,310 | 2,730 ₹49,140 | 2,860 ₹51,480 | 2,769 ₹49,842 | 2,600 ₹46,800 Lowest | 2,704 ₹48,672 | 2,600 ₹46,800 Lowest | 2,808 ₹50,544 | 3,000 ₹54,000 |
| 7.00 | M&L for 35 mm thick Plain framed, panelled shutter (two panel) with
lock rail and panel of 9 mm B.W.P. commercial ply or 12 mm veneered particle board with commercial veneering on both faces. The size of rail and stile as per IS : 1003 (Part I), kiln seasoned and chemically pressure treated complete all as specified and as directed | 18 | Sqm | 3,010 ₹54,180 | 2,940 ₹52,920 | 3,080 ₹55,440 | 2,982 ₹53,676 | 2,800 ₹50,400 Lowest | 2,912 ₹52,416 | 2,800 ₹50,400 Lowest | 3,024 ₹54,432 | 3,000 ₹54,000 |
| 8.00 | M&L for 30 mm thick second class hardwood Glazed and skeleton shutters, open rebated and prepared to receive glass, gauze, etc. (without sash bars), edges of framing plain, chamfered or rounded. fitted with cut and mitred beads for securing glass, etc.; sizes of me-mbers of shutters as specified in SSR Part I, Section 8, clause 8.24 (a); supplied and fitted to chowkats complete all as specified and as directed | 14.4 | Sqm | 3,010 ₹43,344 | 2,940 ₹42,336 | 3,080 ₹44,352 | 2,982 ₹42,940.8 | 2,800 ₹40,320 Lowest | 2,900 ₹41,760 | 3,200 ₹46,080 | 3,024 ₹43,545.6 | 3,000 ₹43,200 |
| 9.00 | M&L for taking down shutters of any description nexc 1.00 sqm adjusting and refixing in the same opening complete all as specified and as directed . | 10 | Sqm | 430 ₹4,300 | 420 ₹4,200 | 440 ₹4,400 | 426 ₹4,260 | 400 ₹4,000 Lowest | 416 ₹4,160 | 400 ₹4,000 Lowest | 432 ₹4,320 | 500 ₹5,000 |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
16 Jul 2026, 6:00 pmClosed
Garrison Engineer Naval Depot
Garrison Engineer Naval Depot Industrial Estate Post 104 Area Visakhapatnam 530007
COMPREHENSIVE MAINTENANCE OF BUILDING INCLUDING FLOORING PLUMBING FALSE CEILING JOINERY AND PAINTING AT DEGA VIHAR OF AGE BR II ND UNDER GE ND VISAKHAPATNAM
2026_MES_772057_1
8600/GEND/E8
Open Tender
Civil Works
Item Rate
180 days
Visakhapatnam
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE ND VISAKHAPATNAM
₹80,000
Yes
20 Aug 2026
16 Jun 2026
20 Jul 2026
16 Jun 2026
16 Jul 2026
2 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.01 | SCHEDULE 'A' PART-I: B/R WORKS | - | - | - | - |
| 1 | Taking down chowkat with shutter (without taking off shutters from the frame) not exc 1.5 Sqm each complete all as specified and as directed. | - | Each | 1.25 | - |
| 2Taking down chowkat with shutter (without taking off shutters from the frame) exc 1.5 Sqm but n exc 4.0 sqm each complete all as specified and as directed. | |||||
| 3 | Taking down shutters of any description nexc 1 sqm complete all as specfied and as directed. | - | Each | 100 | - |
| 4 | Taking down shutters of any description exc 1 sqm but nexc 2 sqm complete all as specfied and as directed. | - | Each | 53 | - |
| 5 | M&L for second class hardwood plain, solid, straight chowkats and frames, wrought, framed rebated on the solid, rounded or chamfered, put together with glue pinned at joints, supplied and fixed complete all as specified and directed. | - | Cum | 10 | - |
| 6 | M&L for 30 mm thick Flush shutters, solid core construction, with block board core and plywood face panels, commercial type on both sides complete all as specified and as directed. | - | Sqm | 11 | - |
| 7 | M&L for 35 mm thick Plain framed, panelled shutter (two panel) with
lock rail and panel of 9 mm B.W.P. commercial ply or 12 mm veneered particle board with commercial veneering on both faces. The size of rail and stile as per IS : 1003 (Part I), kiln seasoned and chemically pressure treated complete all as specified and as directed | - | Sqm | 1.25 | - |
| 8M&L for 30 mm thick second class hardwood Glazed and skeleton shutters, open rebated and prepared to receive glass, gauze, etc. (without sash bars), edges of framing plain, chamfered or rounded. fitted with cut and mitred beads for securing glass, etc.; sizes of me-mbers of shutters as specified in SSR Part I, Section 8, clause 8.24 (a); supplied and fitted to chowkats complete all as specified and as directed | |||||
| 9 | M&L for taking down shutters of any description nexc 1.00 sqm adjusting and refixing in the same opening complete all as specified and as directed . | - | Sqm | 100 | - |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
TENDER8600.pdf
Tender Documents • 4.09 MB
BOQ_865198.xls
BOQ • 0.42 MB
8600Dateamdt.pdf
PDF • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .