Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹57,000
Closing Date
31 Aug 2021, 6:55 pmClosed
Executive Engineer Mech. Irrig. Div. Baramulla
Mech. Irrig. Div. Baramulla
Repairs to 250 KVA HT/LT Distribution Transformers at Sagipora L.I.S of MISD Handwara.
2021_IFC_136250_16
eNIT 24 of 2021-22
Open Tender
Repair and Maintenance Works
Item Rate
3 days
Handwara
Please refer Tender documents.
5 documents required · 5 mandatory
₹50
Yes
Executive Engineer Mech. Irrig. Div. Baramulla
Exempted
Mech. Irrig. Div. Baramulla
11 Sept 2021
25 Aug 2021
1 Sept 2021
25 Aug 2021
31 Aug 2021
25 Aug 2021
28 Aug 2021
Amount
Isolating the transformer from HT side by means of dropping the link set, discarding the HT cable, disconnecting the LT Cable from bush rods lowering of transformer from bed, loading in Pvt. Vehicle by way of engaging a crane at site, carrying up to workshop unloading it for necessary repairs at workshop.
Opening the lid of transformer and draining the carbonized T-Oil discarding the LT/HT connections from LT/HT rods, taking out the assembly of tank. The job includes dismantling of core assembly and coils to thoroughly check the damages.
Providing and fitting of 08 No. fresh HT coils in appropriate size of aluminum wire as per sample. The job includes providing and fitting of insulating material like HT paper, lathered, cotton tape, sleeves, varnishing of the coil and heating in the heating chamber.
Providing and fitting of insulation material such as separators, core sheets, card boards Bakelite tubes sleeves nuts and bolts connecting bars etc.
Retaping of 01 no. LT leg by using superior class insulating material.
Providing and filling of fresh T-Oil for topping
Filtration and Dehydration of T-Oil.
Reassembling of transformer by way of fitment of HT coils, core after cleaning, clamping channels, nuts/bolts heat treatment of the assembled transformer, fitting top transformer lid and testing on no load at workshop. Loading of transformer in a private load carrier, carriage up to site, unloading and installation at site with the help of crane and testing on full load. The entire job shall be carried out through skilled labourers by using special tools and tackles including full load test at workshop.
Deduction cost of old scrap as 80% of weight of coil or as per actual.
M/S NEW BUHROO ELECTRICAL AND MECH ENGG WORKS
M/s SAJID ENGINEERING WORKS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .