Tender Value
₹24.1 Cr
EMD Value
₹48.3 L
Closing Date
24 Jul 2026, 12:00 pm
Supply, Erection, Testing and commissioning of 132 KV D/C line from Rafiganj/GSS (BSPTCL) to Ismailpur/TSS in connection with construction of multi-tracking project between Sonnagar-Pradhankhunta section and any other location under CEE/CON/S/MHX.
EL-C-S-MHX-ETEN-01-26-27
EL-C-S-MHX-ETEN-01-26-27
Open
18 Months
Aligarh, Uttar Pradesh
₹0
₹48.3 L
1 Jul 2026
1 Jul 2026
10 Jul 2026
Supply of AAAC Panther conductor (37/3.15mm) (make as per approved source of SBPTCL)
Supply of steel for super structure of Tower
Supply of double tension fitting with arching horn, line side Jumper cone
Supply of OPGW cable
Supply of 7/20 SWG earth wire / OPGW
Supply of Hardware set for OPGW cable inclusive all fittings & accessories except jointing box
Supply of Long Rod Polymer Insulator 90 KN of light weight with all accessories
Supply of hardware fittings for AAAC Panther conductor (E) Double Tension Fittings
Supply of tension fitting of 7/10 SWG earth wire Jumper cone
Supply of VD for ACSR Zebra conductor.
(d) Anti climbing device
Transportation of template for MT 2 + 6 - 18M tower each set at site from Rly store and back.
Excavation of wet soil
Setting of stub including fitting of templates
Earthing of Tower
Concreting (1:1.5:3) mixture including cost of cement
Erection of Tower including tack welding of nuts & bolts upto bottom cross arm.
"STRINGING of 132 KV D/C transmission line with 06 Phase ACSR Panther Conductor (without OPGW/ Eartwire) complete with all works including stringing of Conductor, Fitting of Hardwares, Hoisting of Insulators etc."
(d) Fitting of Anti climbing device
Welding (Tag & spot) of nuts & bolts up to the bottom cross arm from ground level
Making temporary structure/scaffolding arrangement 2 nos. for Road + 2 nos. of Rail.
"Cost Towards Crop Compensation & Tree Cutting &Compensation, PTCC Clearance, All Statuatory Clearances, NH/SH/Road Crossing or Any Other Crossing etc. (except Railway Crossing & Forest Clearances) required for successful commissioning of the complete line in all respect."
Detail and check survey including making of profile etc.
Expenses on account of idle labour charges
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Tenderdocument01-26-27.pdf Tender Document
ATTACHMENT
GCCACS11_11zon.pdf
ATTACHMENT
GCC_April-2022.pdf
ATTACHMENT
GCC2022UpdateduptoACS-7.pdf
ATTACHMENT
GCCACS8.pdf
ATTACHMENT
GCCACS9.pdf
ATTACHMENT
GCCACS10.pdf
ATTACHMENT
Tenderdocument01-26-27.pdf
ATTACHMENT