Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.3 CrAccepted-AOC 104 26 72 D CHANDRALOK COMPLEX BIRHANA ROAD KANPUR KANPUR UTTAR PRADESH 208001 | KANPUR NAGAR | UTTAR PRADESH | 208001 | L1 | Accepted-AOC Being Lowest | |
| 2 | L2₹43.0 Cr+₹35.8 L (0.84%)Rejected-Finance HOUSE NO 260 SECTOR 9 CHANDIGARH OFFICE ADDRESS SCO 151 152 TOP FLOOR MADHYA MARG SECTOR 8C CHANDIGARH | CHANDIGARH | CHANDIGARH | CHANDIGARH | 160009 | L2 | Rejected-Finance Being L2 Bidder | |
| 3 | L3₹46.9 Cr+₹4.3 Cr (9.97%)Rejected-Finance | L3 | Rejected-Finance Being L3 Bidder |
Tender Value
₹52.0 Cr
EMD Value
₹1.0 Cr
Closing Date
20 Mar 2024, 10:30 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer 1st Circle HPPWD Mandi
O/o Superintending Engineer 1st Circle HPPWD Mandi
Improvement, passing places, R/wall, B/wall, Missing Cross Drainage, Side Drain, Parapets, Crash Barrier, Pannel CC Pavement and Tarring and road signs etc. including five year routine maintenance of Package No. HP08561, HP08562, HP08563 and HP08564
2024_CEHP_132829_1
PW-SE-I-Tender-107-PMGSY-III B-I-2nd call/2023-24-21018-67 Dated 07-03-2024
National Competitive Bid
Civil Works - Roads
Percentage
730 days
In Karsog Division HPPWD
As per SBD/ tender document.
10 documents required · 10 mandatory
₹5,000
₹1.0 Cr
O/o CE (MZ) HPPWD Mandi/ SE 1st Circle HPPWD Mandi
4 Jun 2024
12 Mar 2024
20 Mar 2024
12 Mar 2024
20 Mar 2024
12 Mar 2024
12 Mar 2024 - 16 Mar 2024
18 Mar 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Up-gradation of Kheel to Bhagalu Road km 0/000 to 11/415 (Package No HP-08-561) | |||||
| 1.01 | Excavation in hilly area in all heights and depths and in all kind of soil by manual/mechanical means including saturated soil comprising of ordinary soil, soft rocks, hard rocks, chiselling/wedging out rock (where blasting is prohibited) and their intermediate classification of soil, setting out true to the required lines, grades, width cutting and trimming of side slopes to level as shown in the drawing and as directed by engineer-in-charge at site according to the MORD technical specification section 300 and 1600 and sorting out useful materials and stacking the same in all leads, lifts in acquired width of road and transportation of un-useful material for filling in road ways, camber, embankments for grade improvements and disposal of all surplus material to the approved dumping sites through all modes of transportation including head load or animal transport or mechanical means along with its levelling, fine dressing and carriage of machineries, materials, tools, equipments and safety measures and other incidentals necessary to complete the work by mechanical means and labour if required. Recovery of useful stones to the tune of 15898.20 cubic metre quantity ( fifteen thousand eight hundred ninety eight point two zero) cubic metres at the rate of 300/- (Rupees Three hundred) per cubic metre amounting to Rs.47,69,460/- only which shall be effected from the contractor's running bills on pro-rata basis as per actual quantity executed. Any loss to the public, private property during the course of execution shall be the absolute responsibility of the contractor, which shall have to be duly compensated by him in all cases. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | 71,775.17 | Per Cubic metre | 263.78 | ₹1,89,32,854.34 |
| 1.02 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with in all lifts and leads, transporting to site, spreading, grading by mechanical means to required slope and compacted with three wheel 80-100 (eighty - hundred) kN static roller to meet requirement complete as per MORD technical Specification section 300 and as per direction of Engineer-In-Charge including carriage of materials within all leads, lifts and other incidentals. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | 6,420.63 | Per cubic metre | 211.3 | ₹13,56,679.12 |
| 1.03 | Earth work in excavation for all type of road structure such as retaining walls, breast walls, culverts, drain and Parapets etcetra in all type of classification of soil comprising of ordinary soil, ordinary rock, hard rock chiselling /wedging out rocks (Where blasting is prohibited) as per drawings and M.O.R.D. technical specification section 300 and 1600 and as per direction of the Engineer- In–Charge including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal of materials upto any leads and lifts including dressing of sides, bottom and back filling in trenches with excavated suitable approved material to the original surface in layer not executing 150 mm (one hundred fifty millimetre) compacted thickness including shoring and strutting and pumping and bailing out water (surface and sub soil water ) upto any depth any quantam of water including cleaning of slush which may arise out during dewatering complete as per direction of Engineer-In-Charge. Including carriage of materials within all leads, lifts and other incidentals. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | 1,242.52 | Per Cubic metre | 413.6 | ₹5,13,906.27 |
| 1.04 | Back filling with granular material behind abutments, wing walls, return walls and retaining walls complete as per drawing and M.O.R.D. technical specifications section 1200 and 1600 and as per direction of Engineer – in- Charge including carriage of materials within all leads, lifts and other incidental . The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | 143.91 | Per Cubic metre | 1,049.8 | ₹1,51,076.72 |
| 1.05 | Stabilisation of in-situ soil or otherwise sub base/base course up to the required depth by cold in-situ recycling using cement and chemical additives/otherwise: Providing pulverizing, spreading, milling, and mixing of chemical additives at the appropriate rate as per job in mix design in accordance with IRC-SP-72- 2015, I RC-37-2012 & 2018 and IRC SP 89 (part-II) 2018. Cementitious additive @ rate of a minimum of 5 - 7% (five - seven percent) or as per approved job mix design and 100ml/cum (one hundred millilitre per cubic metre) Soil Stabilizer (additive) should be spread on the existing pavement using a mobile truck mounted containerized cement/additive spreader with microprocessor-controlled weighing and spreading system. The additive spreader shall have variable working width sufficient to cover whole pavement lane. The in-situ stabilization process shall be carried out by a mobile and self-propelled stabilizer/reclaimer of working width of 2.4 m and with minimum engine horsepower 440 (four hundred forty) kw with a variable working depth up to 50 cm (fifty centimetre) . The resultant stabilized mix then would be profiled to the required grade, level and thickness using motor grader and the mix would be compacted using 20 (twenty) tonne pad foot roller in combination with smooth wheel roller to achieve desired proctor density as per IRC 37-2012 & 2018 and complete in all respect and curing with water as required including all materials, labour and machinery etc. The entire insitu process would be carried out in single pass with milling and pulverising of damaged asphalt pavement/soil/aggregates/soi1-aggregate mixture to the desired depth and with simultaneous addition of additives and water with machine integrated spray bars fitted on the wheeled self-propelled and vibratory pad foot roller to achieve the desired proctor density in all respects. The tandem roller should be followed by Pneumatic Tyre Roller. The minimum unconfined compressive strength (UCS) of stabilized subbase/base should be 4.5 to 7 MPa after 7/28 days of curing as per IRC-SP-72-2015, IRC-37-2012 & 2018 Also durability aspects (wet-dry cycles) of stabilized subbase should be satisfied as per IRC 37-2012 & 2018 and IRC SP 89 (part II) 2018. The gradation mixes and materials should be as per IRC 37-2012 & 2018 and IRC SP 89 (part II) 2018. The train of equipment to be used are binder spreader- water Tanker - Additive Truck - Recycler - Padfoot Roller (20 Tonne) + Single Drum Compactor- Grader- Tandom Roller- Pneumatic Tyre Roller (20 Tonne). (HRT Stabilizer: 100ml per cubic meter) and as per the entire satisfaction and direction of Engineer – in- Charge including carriage of materials within all leads, lifts and other incidental. The rate includes octroi, royality, Malkana, toll tax or other taxes imposed by the Government but excluding GST. | 12,646.95 | Per Cubic metre | 2,895.6 | ₹3,66,20,508.42 |
| 1.06 | Providing and laying (SAMI LAYER) paving fabrics fiber glass grid inter layer composed of high strength glass filament yarns knitted into grid with tensile strength >50x50 kn/m, mass per unit area > 1400gm/m2 having inherent tack coat membranes in the material or its equivanlent laid over stabilized surface, including preparation of surface jointing, sticking or overlapping fabric etc. as part of highway pavement strengthening in layer as per technical specifications clause 708 of MORTH. as per direction of Engineer – in- Charge including carriage of materials within all leads, lifts and other incidental . The rate is including octroi, royality, Malkana, toll tax or other taxes imposed by the Government but excluding GST. | 48,875.55 | Per Square metre | 160.6 | ₹78,49,413.33 |
| 1.07 | Providing and applying primer coat with Bitumen emulsion (SS-I) on the prepared surface of granular base including cleaning of road surface with Hydraulic brooms and spraying primer at the rate 0.85 Kg. (Zero point eight five kilogram) per square metre using one part of bitumen emulsion SS-I and two parts of water mixed with Nano technology Tera prime emulsion @ 1% (One percent) of weight of emulsion by mechanical means as per M.O.R.D. technical specifications clause 502 as per the entire satisfaction and directions of Engineer – in- Charge including carriage of materials within all leads,lifts and other incidentals . The rate is including octroi, royality, Malkana, toll tax or any other taxes imposed by the Government but excluding GST. | 48,479.75 | Per Square metre | 26.4 | ₹12,79,865.4 |
| 1.08 | Providing and applying tack coat with Bitumen (VG-10) on the prepared granular surface treated with primer and spraying with bitumen VG-10 (viscosity grade ten) pressure distributor at the rate 0.500 Kg (Zero decimal five kilogram) per Square metre as per MORD technical specification section 500, and as per direction of Engineer-In-Charge, including carriage of materials within all leads, lifts and other incidentals. The rate is including octroi, royality, malkana toll tax and other taxes imposed by the Government but excluding GST. | 48,479.75 | Per Square metre | 36.8 | ₹17,84,054.8 |
| 1.09 | Providing and laying 30mm (thirty millimetre) compacted thickness bituminous concrete with 60-80 (sixty to eighty) TPH hot mix batch type plant with electronic control grading-II using crushed aggregate 13.2 mm (thirteen decimal two millimetre) nominal size of specified grading premixed with bituminous binder VG-10 (Viscosity grade-Ten) at the rate of 5.5% (five point five percent of mix weight or as per design mix with nono technology (Zycotherm) at the rate 0.1% (zero decimal one percent) weight of bitumen, using cement as filler with quantity not less than 2% (two percent) by weight of total aggregate or as per design mix transported to site, laid with sensor paver finisher hydraulic with sensor conrol to the required grade, level and alignment, over a previsiouly prepared surface and rolling complete with sommth three wheel roller 8-10 (eight to ten ) tonne capacity for initial break down rollng and vibratory roller 8-10 (eight to ten) tonne capacity or pneumatic tyre roller of 12-15 (twelve to fifteen) tonne with tyre pressure of atleast 0.56 MPa (Zero decimal five six) for intermediate rolling and finish rolling with 6-8 (six to eighty) tonne sommth wheeled tandom roller to achive the desire compaction as per MoRTH technical specification section 500 complete in all respect or as directed by the Engineer-In-Charge including carriage of material within all leads, lifts and other incidentals. The rate is including octroi, royality, Malkana, toll tax and any other taxes imposed by the Government but excluding GST. | 1,456.25 | Per Cubic metre | 10,762.9 | ₹1,56,73,473.13 |
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_208578.xls
BOQ • 0.64 MB
141744401.pdf
Tender Documents • 0.61 MB
141744404.html
Tender Documents • 0.03 MB
SBD_P3_FDR_KSG.pdf
Tender Documents • 2.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .