Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.7 LAccepted-Finance | L1 | Accepted-Finance Due to lowest bidder | |
| 2 | L2₹16.4 L+₹2.7 L (19.7%)Rejected-Finance GOVT ELECTRICAL CONTRACTOR C VILLAGE HAT PO BAJAURA TEHSIL BHUNTAR DISTRICT KULLU HP 175125 | KULLU | HIMACHAL PRADESH | 175125 | L2 | Rejected-Finance Due to higher bidder | |
| 3 | Rejected-Technical NO 1 HPPWD DIVISION DHARAMSHALA HIMACHAL PRADESH | - | Rejected-Technical Not Fulfill the tender criteria |
Tender Value
₹9.3 L
Closing Date
22 Sept 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Executive Engineer DMC
C/O Street from Vinay house towards Vijay house at lower Shyamnagar in Ward No. 10
2023_UDDHP_78628_20
5513-18 DMC
Open Tender
Civil Works
Item Rate
90 days
Dharamshala
Please refer tender document
9 documents required · 9 mandatory
₹0
Exempted
18 Nov 2023
8 Sept 2023
22 Sept 2023
8 Sept 2023
22 Sept 2023
8 Sept 2023
Amount
Earth work in excavation by mechanical means(Hydraulic excavator)/ manual means over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10sqm on plan) including getting out and disposal ofexcavated earth lead upto 50 m and lift upto 1.5 m, Ordinary rock as per drawing and H.P.P.W.D technical specifications all lead and lifts and carriage of material as directed by the Engineer-in-charge
Demolishing cement concrete manually/ bymechanical means including disposal of material within50 metres lead as per direction of Engineer - in - chargeNominal concrete 1:3:6 or richer mix (i/cequivalent design mix)as per drawing and H.P.P.W.D technical specifications all lead and lifts and carriage of material as directed by the Engineer-in-charge.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand) : 6 graded stone aggregate 20 mm nominal size) as per drawing and H.P.P.W.D technical specifications all lead and lifts and carriage of material as directed by the Engineer-in-charge
Steel reinforcement for R.C.C. work includingstraightening, cutting, bending, placing in position andbinding all complete above plinth levelThermo-Mechanically Treated bars of grade Fe-500D or more.as per drawing and H.P.P.W.D technical specifications all lead and lifts and carriage of material as directed by the Engineer-in-charge
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1.5:3 (1 Cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) as per drawing and H.P.P.W.D technical specifications all lead and lifts and carriage of material as directed by the Engineer-in-charge
Steel work welded in built up sections/ framed work,including cutting, hoisting, fixing in position and applyinga priming coat of approved steel primer using structuralsteel etc. as required. In gratings, frames, guard bar, ladder,railings, brackets, gates and similar worksas per drawing and H.P.P.W.D technical specifications all lead and lifts and carriage of material as directed by the Engineer-in-charge
Vinod Kumar
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .