Loading…
Loading…
Tender Value
₹1 L
EMD Value
₹2,000
Closing Date
15 Oct 2026, 4:00 pmClosed
EXECUTIVE ENGINEER REW RAJOURI
OFFFICE OF THE EXECUTIVE ENGINEER REW RAJOURI
REFRER TO BOQ
2026_RDPR_327698_1
e-NIT No. 113 REW Rajouri of 2026 Dated 06-10-2026
Open Tender
Civil Works
Percentage
RAJOURI
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
OFFFICE OF THE EXECUTIVE ENGINEER REW RAJOURI
₹2,000
10 Oct 2026
10 Oct 2026
16 Oct 2026
10 Oct 2026
15 Oct 2026
10 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in trench excavation by manual means in exceeding 10 sqm on plan, in AKS. | 3.39 | cum | 479.3 | ₹1,624.83 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 1.35 | cum | 218.4 | ₹294.84 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 0.56 | cum | 4,826.5 | ₹2,702.84 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone | 1.04 | cum | 4,774.3 | ₹4,965.27 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 0.65 | cum | 7,788.4 | ₹5,062.46 |
| 6 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement
and finishing with. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.11 | cum | 9,395.7 | ₹10,429.23 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.27 | cum | 9,821.9 | ₹12,473.81 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 5.57 | sqm | 286.35 | ₹1,594.97 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for: Columns, pillars, piers, abutments, posts and struts. | 10.4 | sqm | 742.55 | ₹7,722.52 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for: Lintel, beams, plinth beams, girders, bressumers and cantilevers. | 7.89 | sqm | 577.53 | ₹4,556.71 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.35 MB
BOQ_1108859.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .