Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹48.8 L
EMD Value
₹48,835
Closing Date
27 Nov 2026, 5:00 pm4d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Chief Executive Officer, Sarigam Clean Initiative, Sarigam
REPAIRING AND STRENGTHENING OF EXISTING AERATION TANK PLATFORMS AND SUPPLY, FABRICATION, INSTALLATION AND PAINTING OF MS PIPE RAILINGS AT CETP SARIGAM
367036
02 OF 2026-27
Open
Civil Works - Others
Works
Valsad
6 documents required · 6 mandatory
₹2,832
CHIEF EXECUTIVE OFFICER, SARIGAM CLEAN INITIATIVE
₹48,835
18 Nov 2026
18 Nov 2026
18 Nov 2026
27 Nov 2026
18 Nov 2026
180 days
NAME OF WORK: REPAIRING AND STRENGTHENING OF EXISTING
AERATION TANK PLATFORMS AND SUPPLY, FABRICATION,
INSTALLATION AND PAINTING OF MS PIPE RAILINGS AT CETP
TENDER REFERENCE E-SHORT TENDER NOTICE NO. 02 OF 2026-27
COMPLETION PERIOD 120 Days
TENDER ISSUE DATE 18.11.2026
BID OPENING DATE 02.12.2026 at 11:00 AM
TENDER INVITED BY
SARIGAM CLEAN INITIATIVE
CETP, GIDC Industrial Estate, Sarigam, Gujarat
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 1 of
Particulars Page Particulars Page
SECTION 1: NOTICE INVITING E- 5 ANNEXURE-E: NON-
TENDER (NIT) & BID SCHEDULE BLACKLISTING DECLARATION
SECTION 2: MEMORANDUM OF 8 ANNEXURE-F: SITE VISIT
WORK IN BRIEF CERTIFICATE
SECTION 3: INSTRUCTIONS TO 10 ANNEXURE-G: TECHNICAL
BIDDERS COMPLIANCE SHEET
SECTION 4: ELIGIBILITY CRITERIA & 13 ANNEXURE-H:
PRE-QUALIFICATION REQUIREMENTS ACKNOWLEDGEMENT OF
DRAWING ARRANGEMENT
SECTION 5: BID SUBMISSION 17 ANNEXURE-I: TENDER
REQUIREMENTS ACCEPTANCE / UNDERTAKING
SECTION 6: BID EVALUATION, 21 ANNEXURE-J: POWER OF
QUALIFICATION & ATTORNEY / AUTHORIZATION
DISQUALIFICATION
SECTION 7: GENERAL & SPECIAL 25 ANNEXURE-K: FINANCIAL BID /
SECTION 8: TECHNICAL 35 ANNEXURE-L: DOCUMENT
SPECIFICATIONS CHECKLIST
SECTION 9: SCOPE OF WORK
SECTION 10: SCHEDULE-B – BILL OF
QUANTITIES (BOQ)
SECTION 12: ANNEXURES & FORMS
ANNEXURE-A: BIDDER INFORMATION
ANNEXURE-B: DETAILS OF SIMILAR
WORK EXPERIENCE
ANNEXURE-C: FINANCIAL
ANNEXURE-D: BANK SOLVENCY
Note: Page numbers refer to the corresponding pages of this Tender Document.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 2 of
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 3 of
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 4 of
SECTION 1: SHORT NOTICE INVITING E-TENDER (NIT) & BID SCHEDULE
E-SHORT TENDER NOTICE NO. 02 OF 2026-27
Sarigam Clean Initiative (SCI), Sarigam, invites online bids through E-Tendering under Two Bid
System (Technical Bid and Financial Bid) from eligible and experienced contractors for the
following work:
1.1 Tender Details
Sr. Particulars Details
1 Tender Notice No. E-SHORT TENDER NOTICE NO. 02 OF 2026-27
2 Name of Work Repairing and Strengthening of Existing Aeration Tank
Platforms and Supply, Fabrication, Installation and
Painting of MS Pipe Railings at CETP Sarigam
3 Tender Inviting Authority Chief Executive Officer, Sarigam Clean Initiative
4 Employer Sarigam Clean Initiative (SCI)
5 Location of Work Common Effluent Treatment Plant (CETP), GIDC
Sarigam Industrial Estate, Taluka Umbergaon, District
Valsad, Gujarat –
6 Type of Tender Open E-Tender under Two Bid System
7 Tender Category Works
8 Nature of Contract Percentage Rate Contract (Overall Combined Work)
9 Estimated Quantity Railing: approx. 1,930 RM; Civil repair: as per Scope of
Work (for measurement only)
10 Contract Period 120 Days from the date of commencement of work
11 Estimated Tender Value ₹48,83,500/-
12 Earnest Money Deposit (EMD) ₹48,835/- (1% of Estimated Tender Value)
13 Tender Document Fee ₹2,832/- (₹2,400/- + 18% GST), Non-Refundable
14 Bid Validity 180 Days from the last date of submission of Bid
15 Performance Security Performance Bank Guarantee (PBG): 5.00% of the
Contract Value, to be furnished prior to
commencement of the Contract in the prescribed
16 Security Deposit Security Deposit (SD): 5.00% of the Contract Value,
comprising 2.50% Initial Security Deposit before
execution of the Agreement and 2.50% recovered
proportionately from Running Account Bills until the
total Security Deposit of 5.00% is achieved.
17 Mode of Submission Online submission through the prescribed E-Tender
18 E-Tender Portal www.nprocure.com
19 Completion Period 120 Days from the date of commencement of work
20 GST As applicable under prevailing statutory provisions
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 5 of
1.2 Tender Schedule
Sr. Activity Date & Time
1 Date of Publication / Availability of Tender 18.11.2026
2 Downloading of Tender Documents 18.11.2026 to 28.11.2026
3 Pre-Bid Meeting, if applicable N.A.
4 Last Date for Submission of Online Bid 28.11.2026
5 Last Date for Submission of Physical 30.11.2026 to 01.12.2026 (09:00
Documents, wherever required to 17:00 hrs)
6 Opening of Technical Bid 02.12.2026 at 11:00 hrs
7 Opening of Financial Bid To be intimated to technically
qualified bidders
1.3 Important Instructions
1. The bidder shall carefully examine the complete Tender Document, technical
specifications, BOQ and all annexures before submitting the Bid.
2. Site Visit is mandatory; the requirements and consequences are specified in Clause 3.3.
3. The bidder shall quote rates only in the prescribed Financial Bid / Schedule-B.
4. The quoted rates shall remain firm and shall include all costs necessary for complete and
satisfactory execution of the work, except GST where specifically indicated separately in
the Financial Bid.
5. SCI reserves the right to verify the credentials, experience, statutory documents,
financial information and other particulars submitted by any bidder.
6. Submission of false, forged, misleading or materially incorrect information or documents
shall render the Bid liable for rejection and may result in forfeiture of EMD and other
action as per the Tender Conditions.
7. SCI reserves the right to accept or reject any or all Bids, wholly or partly, or to cancel or
withdraw the Tender process, in whole or in part, at any stage, in accordance with
applicable procurement rules and the provisions of this Tender Document. Where
required under the applicable rules or internal delegation of powers, the reasons for such
rejection, cancellation or withdrawal shall be recorded by the Competent Authority. No
Bidder shall have any right to claim compensation, damages or costs solely on account
of rejection of its Bid or cancellation / withdrawal of the Tender process, subject to
applicable law.
8. The bidder shall regularly check the E-Tender Portal for any Corrigendum, Addendum,
Clarification or modification issued by SCI before submission of the Bid.
9. The successful bidder shall execute the required Agreement / Work Order and furnish
Performance Security within the period specified by SCI.
10. Compliance with Applicable Procurement Rules: This Tender shall be governed by and
implemented in accordance with the applicable provisions of the Gujarat State
Procurement Policy, 2024, applicable Government Resolutions, Circulars, financial and
procurement rules, and amendments thereto, to the extent applicable to Sarigam Clean
Initiative (SCI), together with the provisions of this Tender Document.
11. In case of any inconsistency between the provisions of this Tender Document and any
mandatory provision of applicable law, Government policy, Government Resolution or
statutory requirement, the latter shall prevail to the extent of such inconsistency.
12. Payee Name for Tender Fee and EMD:
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 6 of
The Demand Draft (DD) towards Tender Document Fee and Earnest Money Deposit
(EMD), wherever applicable, shall be drawn in favour of "CHIEF EXECUTIVE OFFICER,
SARIGAM CLEAN INITIATIVE", payable at Sarigam, from any Nationalized / Scheduled
Bank, as applicable under the Tender Conditions.
1.4 Tender Documents
The Tender Document shall comprise, but not be limited to, the following:
1. Notice Inviting E-Tender (NIT)
2. Instructions to Bidders
3. Eligibility and Pre-Qualification Requirements
4. Bid Submission Requirements
5. Bid Evaluation Criteria
6. General and Special Conditions of Contract
7. Technical Specifications
8. Scope of Work
9. Schedule-B / BOQ
11. Technical Compliance Sheet
12. Site Visit Certificate
13. Other Forms, Undertakings and Annexures issued as part of the Tender Document.
Chief Executive Officer
Sarigam Clean Initiative (SCI)
CETP Sarigam, GIDC Sarigam Industrial Estate
Taluka Umbergaon, District Valsad, Gujarat –
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 7 of
SECTION 2: MEMORANDUM OF WORK IN BRIEF
Sr. Particulars Description
1 Name of Work Repairing and Strengthening of Existing Aeration Tank
Platforms and Supply, Fabrication, Installation and Painting of
MS Pipe Railings at CETP Sarigam
2 Employer Sarigam Clean Initiative (SCI)
3 Project Location Common Effluent Treatment Plant (CETP), GIDC Sarigam
Industrial Estate, Taluka Umbergaon, District Valsad, Gujarat
4 Nature of Contract Percentage Rate Contract (Overall Combined Work)
5 Type of Bid Two Bid System comprising Technical Bid and Financial Bid
6 Estimated Quantity Railing: 1,930 RM; Civil repair: as per BOQ
7 Contract Period 120 Days from the date of commencement of work
8 Scope of Work Civil repair/rehabilitation of damaged RCC walkways,
platforms and associated structural portions, including
controlled breaking, reinforcement treatment, injection
grouting, waterproof plastering, formwork, reinforcement and
M30 concrete; and supply, fabrication, dismantling wherever
directed, installation, chemical anchoring, welding, surface
preparation, priming and epoxy painting of approximately
1,930 RM of B-Class MS pipe railing, all as per BOQ and SCI
9 Railing Material As per BOQ
10 Top Rail As per BOQ
11 Vertical Post As per BOQ
12 Mid Rail As per BOQ
13 Bottom Rail As per BOQ
14 Base Plate As per BOQ
15 Anchor Fastener As per BOQ
16 Elbow As per BOQ
17 Painting System One coat primer and two coats epoxy paint
18 Measurement Unit As applicable to the respective work components; for
measurement verification only
19 Basis of Payment Actual completed and accepted work comprising the
complete combined scope of Railing Work and Civil Repair
Work, applying the single accepted consolidated percentage
rate (Above / Below / At Par) to the measured work value.
20 Governing Tender Document, Technical Specifications, Scope of Work,
Documents BOQ, approved fabrication drawing and written instructions
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 8 of
2.1 Location-wise Estimated Quantity
The estimated railing quantity is distributed at the following locations:
Sr. No. Location Quantity (RM)
TOTAL 1,930.00 RM
The above quantities are estimated quantities for tendering purposes and may vary depending
upon actual site requirements. Payment shall be based on the actual quantity completed,
measured and accepted by SCI.
2.2 General Description of Work
The work shall include complete supply and execution of the railing system, including all
materials, fabrication, cutting, bending, fitting, welding, transportation, installation, chemical
anchoring, surface preparation, painting and other incidental works necessary for satisfactory
completion of the railing work.
The railing shall be fabricated and installed strictly in accordance with the drawings and
technical details issued / approved by SCI before fabrication.
The Contractor shall verify the actual site dimensions and conditions before fabrication. Any
discrepancy observed between the tender drawing and actual site condition shall be brought to
the notice of SCI before commencement of fabrication.
No fabrication shall be undertaken on the basis of assumed dimensions without verification and
approval where required.
2.3 Measurement and Payment
BOQ quantities are estimates only. Payment shall be based on actual completed, jointly
measured and accepted work at the accepted consolidated percentage rate, in
accordance with Sections 10 and
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 9 of
SECTION 3: INSTRUCTIONS TO BIDDERS
3.1 General Instructions to Bidders
1. The Bidder shall carefully read and examine the entire Tender Document, including the
Notice Inviting Tender (NIT), Memorandum of Work, Instructions to Bidders, Eligibility
Criteria, Scope of Work, Technical Specifications, Conditions of Contract, BOQ,
Drawings, Appendices, Forms and all Corrigenda, Addenda and Clarifications issued by
SCI before submitting the Bid.
2. Submission of a Bid shall be deemed to constitute the Bidder's unconditional
acceptance of all the terms, conditions, specifications and requirements contained in
the Tender Document.
3. The Bidder shall submit the Bid only through the prescribed E-Tender Portal in
accordance with the procedure specified in the Tender Document.
4. The Bid shall comprise all documents, certificates, declarations, forms and information
required under the Tender Document. Failure to submit any mandatory document may
render the Bid non-responsive and liable for rejection.
5. The Bidder shall quote rates strictly in the prescribed Financial Bid / Schedule-B. Rates
quoted elsewhere shall not be considered for evaluation.
6. All quoted rates shall remain firm and fixed during the Contract Period and shall include
all costs, charges, overheads, labour, materials, transportation, tools, tackles and other
expenses necessary for satisfactory completion of the work, except GST where
specifically provided separately in the Financial Bid.
7. Conditional, incomplete, alternative or qualified Bids, or Bids containing material
deviations from the Tender requirements, shall be liable for rejection.
8. The Bid shall be signed and submitted by a person duly authorized to act on behalf of the
Bidder. A valid Power of Attorney, Board Resolution or Authorization Letter, as
applicable, shall be submitted along with the Bid.
9. The Bidder shall possess and maintain all statutory registrations, licences, approvals and
certifications required under applicable laws for execution of the work.
10. The Bidder shall be solely responsible for verifying all Corrigenda, Addenda and
Clarifications uploaded on the E-Tender Portal before submission of the Bid.
11. SCI reserves the right to accept or reject any or all Bids, cancel or modify the Tender
process, or withdraw the Tender at any stage in accordance with the Tender Conditions,
without assigning any reason, and no claim shall lie against SCI on this account.
12. Unless otherwise specifically stated in the Financial Bid, the quoted rates shall
be exclusive of GST. GST and other applicable statutory taxes shall be dealt with in
accordance with the applicable laws and Tender Conditions.
13. The cost of preparation and submission of the Bid, including the cost of site visit,
inspection, measurements, documents and any other related expenditure, shall be
borne entirely by the Bidder. SCI shall not be liable for any such expenditure irrespective
of the outcome of the Tender.
3.2 Special Instructions to Bidders
1. The Bidder shall carefully assess the actual site conditions, dimensions, accessibility,
existing railing, RCC structures and working conditions before submitting its Bid.
2. The Bidder shall not rely solely upon the estimated quantities indicated in the BOQ. The
quantities are subject to variation based on actual site requirements.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 10 of
3. The Bidder shall inspect the site conditions and, after award, verify dimensions
and locations against the drawings issued / approved by SCI before fabrication.
4. No fabrication shall be undertaken on the basis of assumed dimensions where site
verification is required.
5. The Bidder shall quote its rate considering the complete scope of work specified in the
Tender Document. No additional payment shall ordinarily be admissible for items or
activities which are necessary for satisfactory completion of the work but are incidental
to the specified scope.
6. The Contractor shall execute the work strictly in accordance with the approved drawing,
technical specifications, BOQ and written instructions of SCI.
7. No deviation from the approved drawing, technical specifications or scope of work shall
be permitted without prior written approval of SCI.
8. The Bidder shall comply with all applicable Labour Laws, Safety Requirements and
statutory requirements during execution of the work.
9. The Bidder shall make its own arrangements for all manpower, tools, tackles, equipment,
transportation, lifting arrangements and other resources required for execution of the
work, unless specifically stated otherwise in the Tender Document.
10. Joint Venture (JV), Consortium or Association of Firms shall not be permitted. The
Bidder shall participate as a single legal entity.
3.3 Mandatory Site Visit
1. Site Visit is Mandatory. Every Bidder shall visit and inspect the project site before
submission of the Bid to fully understand the nature and extent of the work, proposed
railing locations, existing railing, RCC structures, access conditions, working areas and
other site conditions which may affect execution of the Contract.
2. The Bidder shall make its own assessment regarding the scope, dimensions,
quantities, accessibility, working conditions and complexity of the work.
3. The Bidder shall not be entitled to claim additional payment or extension of time on the
ground of ignorance of site conditions which could reasonably have been identified
during the site visit.
4. All costs and expenses incurred by the Bidder in connection with the Site Visit shall be
borne by the Bidder.
5. The Bidder shall obtain a Site Visit Certificate duly signed by SCI and submit the same
along with the Technical Bid.
6. Bids submitted without the mandatory Site Visit Certificate shall be liable for
rejection and shall not be considered for further technical evaluation.
3.4 Clarifications, Corrigenda & Addenda
1. Any clarification required by a Bidder regarding the Tender Document shall be sought
through the prescribed mode within the time specified in the Tender Schedule.
2. SCI may issue Clarifications, Corrigenda or Addenda at any time before the deadline
for submission of Bids.
3. All Clarifications, Corrigenda and Addenda issued by SCI shall form an integral part of
the Tender Document and shall be binding on all Bidders.
4. It shall be the sole responsibility of every Bidder to regularly check the E-Tender Portal
and verify whether any Corrigendum, Addendum or Clarification has been issued before
submission of the Bid.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 11 of
5. No separate communication shall ordinarily be made individually to Bidders regarding
Corrigenda, Addenda or Clarifications.
3.5 No Material Change After Bid Submission
1. No material change in the eligibility criteria, scope of work, technical specifications,
evaluation criteria, commercial conditions or other material terms of the Tender shall be
made after opening of Bids, except through a duly issued Corrigendum / Addendum or as
otherwise permitted under applicable procurement rules.
2. Any Corrigendum / Addendum issued before the Bid Due Date shall form an integral part
of the Tender Document and shall be made available to all prospective Bidders through
the prescribed E-Tender Portal.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 12 of
SECTION 4: ELIGIBILITY CRITERIA & PRE-QUALIFICATION
4.1 General Eligibility
1. The Bidder shall be a Company, Partnership Firm, Limited Liability Partnership (LLP)
or Proprietorship Firm legally registered under the applicable laws of India.
2. The Bidder shall possess a valid “Class E-1 or above Contractor Registration issued by
the Government of Gujarat / GIDC / R&B Department / other competent Government
Authority, or equivalent registration acceptable to SCI.
3. A valid copy of the Class E-1 or above Contractor Registration Certificate shall be
submitted along with the Technical Bid.
4. The Bidder shall possess valid:
o PAN Registration
o GST Registration
o EPF Registration, wherever applicable
o ESIC Registration, wherever applicable
o Other statutory registrations / licences as applicable for execution of the work.
5. The Bid shall be signed and submitted by a person duly authorized to act on behalf of the
Bidder. A valid Power of Attorney, Board Resolution or Authorization Letter, as
applicable, shall be submitted along with the Bid.
6. The Bidder shall comply with all applicable Central Government, State Government and
Local Authority laws, rules, regulations and statutory requirements applicable to
execution of the work.
7. The Bidder shall submit all documents specified under this Section and the relevant
annexures of the Tender Document.
8. SCI reserves the right to verify the authenticity and validity of any certificate, registration,
work order, completion certificate, financial document or other information submitted by
9. Submission of any false, forged, misleading or materially incorrect information or
document shall render the Bid liable for rejection and may result in forfeiture of EMD and
further action as per the Tender Conditions.
10. “The Class E-1 or above Contractor Registration submitted by the Bidder shall be valid as
on the Bid Due Date and shall remain valid for the execution of the Contract, or shall be
duly renewed within the period prescribed by the competent authority. Registration below
Class E-1 shall not be accepted.”
11. “The requirement of Class E-1 or above Contractor Registration shall not substitute the
requirement of Similar Work Experience. Both requirements shall be independently
satisfied by the Bidder.”
4.2 Similar Work Experience
The Bidder shall have successfully completed BOTH (i) RCC / Civil Works and (ii) Railing Works
during the last seven (7) years preceding the Bid Due Date. Experience in both categories is
mandatory; experience in only one category shall not qualify the Bidder.
The Bidder shall submit evidence of the following two separate experience requirements:
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 13 of
(a) RCC / Civil Works – Mandatory
At least one completed work involving RCC structural repair, rehabilitation, strengthening,
reconstruction or construction of industrial structures such as tanks, platforms, walkways or
similar RCC structures.
(b) Railing Works – Mandatory
At least one completed work involving fabrication, supply and installation / fixing of MS or GI
railings, handrails, safety railings or platform railings, including associated anchoring, welding
and painting, wherever applicable.
Location Requirement:
Both the qualifying RCC / Civil Work and the qualifying Railing Work shall have been executed in
a Chemical Zone / Chemical Industrial Estate. Works executed in ordinary residential,
commercial or non-chemical locations shall not be considered for this requirement.
Definition of Similar Work
For the purpose of this Tender, “Similar Work” shall mean completed works executed in a
Chemical Zone / Chemical Industrial Estate, involving BOTH of the following categories.
Experience in both categories is mandatory; experience in either category alone shall not be
(i) RCC / Civil Works: RCC structural repair, rehabilitation, concrete reconstruction,
reinforcement treatment, grouting, waterproofing, civil construction or repair / strengthening of
industrial tanks, platforms, walkways and other associated RCC structures.
(ii) Railing Works: Fabrication, supply, installation and fixing of MS / GI hand railings, safety
railings, platform railings or industrial railings, including anchoring, welding and painting.
The two categories may be covered under separate work orders or under a single work order,
provided that the respective work components are clearly specified and actual execution of both
categories is established through the relevant Completion / Performance Certificate(s).
For both categories, the work shall have been executed within a notified / identifiable Chemical
Zone or Chemical Industrial Estate. The Bidder shall submit documentary evidence establishing
the location of each qualifying work as a Chemical Zone / Chemical Industrial Estate.
The following shall be considered eligible, subject to fulfilment of BOTH categories and
the location requirement stated above:
• RCC structural repair, rehabilitation, strengthening or construction works executed in a
Chemical Zone / Chemical Industrial Estate.
• MS / GI railing fabrication and installation works executed in a Chemical Zone /
Chemical Industrial Estate.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 14 of
Works of any value shall be accepted, provided the nature of the work, its successful
completion and its execution within a Chemical Zone / Chemical Industrial Estate are
established through the required documentary evidence.
Both qualifying works shall have been successfully completed within the last seven (7)
years preceding the Bid Due Date. Works executed outside a Chemical Zone / Chemical
Industrial Estate shall not be considered for meeting this qualifying experience
Routine operation and maintenance (O&M), general maintenance, housekeeping,
manpower supply, operation services and supply-only works without actual execution of
the relevant RCC / Civil Works or Railing Works shall not be considered as qualifying
Supply-only works shall not be considered as qualifying experience.
4.3 Documentary Evidence for Similar Work
The Bidder shall submit the following documents separately for the qualifying RCC / Civil Work
and the qualifying Railing Work:
1. Copy of the respective Work Order / Letter of Award; and
2. Copy of the respective Completion Certificate / Performance Certificate issued by the
Client, establishing successful execution of the relevant work.
The submitted certificate should clearly indicate, wherever possible:
Name of the work;
Name of Client;
Nature of work;
Contract value;
Completed value; and
Date of completion.
SCI may seek additional documentary evidence where the submitted documents do not
adequately establish the eligibility of the work.
4.4 Financial Eligibility Criteria
4.4.1 Average Annual Turnover
The Bidder shall have achieved an average annual turnover of not less than 100% of the Estimated
Tender Value (₹48,83,500/-) during the last three (3) completed financial years immediately
preceding the Bid Due Date. The Bidder shall submit:
Turnover Certificate duly certified by a Chartered Accountant; and
Supporting audited financial statements / financial documents.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 15 of
4.4.2 Bank Solvency
The Bidder shall submit a valid Bank Solvency Certificate issued by a Scheduled Commercial
Bank for an amount not less than 20% of the Estimated Tender Value (₹9,76,700/-).
The Solvency Certificate shall not be older than twelve (12) months from the Bid Due Date.
4.5 Statutory Compliance
The successful Bidder shall comply with all applicable statutory requirements relating to its
employees, workers and execution of the work, including, wherever applicable:
Employees' Provident Fund (EPF);
Employees' State Insurance (ESI);
Applicable Labour Laws;
Minimum Wages requirements;
Workmen / Employee Compensation requirements;
Applicable Safety requirements; and
Other statutory requirements applicable to the work.
4.6 Non-Blacklisting / Debarment
1. The Bidder shall declare that it has not been blacklisted, debarred, suspended or
banned by any Government Department, Government Agency, PSU, GIDC, Local
Authority or other statutory authority during the last three (3) years preceding the Bid Due
2. The Bidder shall submit a duly signed Non-Blacklisting Declaration in the prescribed
3. If the declaration submitted by the Bidder is subsequently found to be false, incorrect or
misleading, SCI shall have the right to reject the Bid or terminate the Contract, as
applicable, and take further action in accordance with the Tender Conditions.
4.7 Joint Venture / Consortium
Joint Venture, Consortium or Association of Firms shall not be permitted under this Tender.
The Bidder shall participate as a single legal entity.
4.8 Conflict of Interest
1. The Bidder shall disclose any common ownership, common Directors, controlling
interest or other relationship with another Bidder participating in the same Tender which
may result in a conflict of interest.
2. SCI reserves the right to reject the Bid where, in its reasonable opinion, such relationship
may adversely affect fair competition or the integrity of the bidding process.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 16 of
SECTION 5: BID SUBMISSION REQUIREMENTS
1. The Bidder shall submit its Bid through the prescribed E-Tender Portal within the date
and time specified in the NIT.
2. The Bid shall be submitted under the Two Bid System, comprising:
o Technical Bid
o Financial Bid
3. The Technical Bid shall contain all documents required to establish the Bidder's
eligibility, technical capability and compliance with the Tender requirements.
4. The Financial Bid shall contain the rates strictly in the prescribed Schedule-B / BOQ.
5. The Bidder shall not indicate or disclose its quoted price in the Technical Bid. Any
disclosure of the Financial Bid / quoted rates in the Technical Bid may render the Bid
liable for rejection.
5.2 Technical Bid – Documents to be Submitted
The Bidder shall upload the following documents along with the Technical Bid:
A. Eligibility & Statutory Documents
1. Valid Class E-1 or above Contractor Registration Certificate.
3. GST Registration Certificate.
4. EPF Registration Certificate, wherever applicable.
5. ESIC Registration Certificate, wherever applicable.
6. Any other statutory registration applicable to the execution of the work.
B. Experience Documents
7. Copies of Work Orders / Letters of Award and Completion / Performance Certificates for
BOTH the qualifying RCC / Civil Work and the qualifying Railing Work.
8. Copies of corresponding Completion Certificate / Performance Certificate(s).
9. Details of both qualifying work categories executed during the prescribed period, in the
format provided in the Tender.
C. Financial Capacity
10. CA-certified Average Annual Turnover Certificate for the prescribed three financial
11. Audited financial statements / supporting financial documents.
12. Valid Bank Solvency Certificate as specified in Section
D. Tender-Specific Documents
13. Mandatory Site Visit Certificate duly signed by SCI.
14. Duly filled Technical Compliance Sheet.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 17 of
15. Signed and stamped copy of the Technical Specification.
16. Signed Non-Blacklisting Declaration.
17. Signed Tender Acceptance / Undertaking.
18. Authorization / Power of Attorney / Board Resolution / Authorization Letter, as applicable.
5.3 Financial Bid
1. The Bidder shall submit the Financial Bid strictly in the prescribed Schedule-B /
2. The Bidder shall quote only one consolidated percentage rate (Above / Below / At Par) on
the total estimated tender value of ₹48,83,500/- for the complete combined work
comprising Railing Work and Civil Repair Work. No separate job-wise or item-wise rates
shall be quoted.
3. The quoted consolidated percentage shall include all costs required for complete
execution of the respective job as specified in the Tender Document.
4. GST shall be indicated separately in the Financial Bid, wherever the E-Tender Portal / BOQ
format provides a separate provision for GST.
5. No condition, qualification or deviation shall be attached to the quoted Financial Bid.
6. The Financial Bid of only those Bidders who are found technically responsive and
eligible shall be opened.
5.4 Submission of Technical Compliance and Acceptance
1. The Bidder shall carefully examine the Scope of Work, Technical Specifications, BOQ and
all other conditions of the Tender Document before submitting the bid.
2. The Bidder shall submit a duly signed and stamped Technical Compliance Sheet,
confirming compliance with each major technical requirement specified in the Tender
3. Detailed drawings, layouts and other relevant technical details, wherever required for
execution of the work, shall be provided by SCI to the successful bidder after issuance of
the Work Order. Such drawings shall not be required to be submitted along with the bid.
4. Any deviation from the specified material, dimensions, pipe class, anchoring system,
painting system or other technical requirements shall be clearly declared by the Bidder
in the Technical Compliance Sheet.
5. Any material deviation from the Tender requirements may render the bid non-responsive
and may result in its rejection.
5.5 Bid Security / EMD
1. The Bidder shall submit an Earnest Money Deposit (EMD) of ₹48,835/- (Rupees Forty-
Eight Thousand Eight Hundred Thirty-Five Only), equivalent to 1% of the Estimated Tender
Value, in the manner prescribed in the NIT / E-Tender Portal.
2. Bids submitted without the required EMD, except where a valid exemption is specifically
applicable and supported by documentary evidence, shall be liable for rejection.
3. The EMD of unsuccessful Bidders shall be dealt with in accordance with the applicable
E-Tender / Tender Conditions.
4. The EMD of the successful Bidder shall be dealt with as specified in the Tender
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 18 of
The Bidder shall pay a non-refundable Tender Document Fee of ₹2,832/- (₹2,400/- plus 18% GST)
in the manner specified in the NIT / E-Tender Portal.
5.7 Authorization of Bid
1. Where the Bidder is a Company, Partnership Firm, LLP or Proprietorship Firm, the Bid
shall be signed by a person duly authorized to bind the Bidder.
2. Documentary evidence of such authorization shall be submitted along with the Technical
3. A Bid submitted by an unauthorized person may be treated as non-responsive.
5.8 Completeness of Bid
1. The Bidder shall ensure that all mandatory documents and information required under
the Tender Document are uploaded before the Bid Due Date and Time.
2. SCI may seek clarification regarding a document already submitted by the Bidder,
wherever considered necessary.
3. Such clarification shall not permit the Bidder to alter, modify or improve its original
Bid, except where specifically permitted under the applicable procurement rules.
4. Failure to provide a required clarification within the specified period may result in
rejection of the Bid.
5.9 Consequences of False Information
If any document, certificate, declaration or information submitted by the Bidder is subsequently
found to be false, forged, fabricated, misleading or materially incorrect, SCI shall have the
Reject the Bid;
Forfeit the EMD, wherever applicable;
Cancel the award / Work Order, if already issued;
Terminate the Contract, if already executed; and
Take such further action as may be permissible under the Tender Conditions and
applicable law.
5.10 Bid Submission Checklist
Sr. No. Document Technical Bid Financial Bid
1 Class E-1 or above Registration ✓ —
3 GST Registration ✓ —
4 EPF / ESIC, wherever applicable ✓ —
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 19 of
Sr. No. Document Technical Bid Financial Bid
5 Work Orders for BOTH RCC and Railing Works ✓ —
6 Completion / Performance Certificate ✓ —
7 Turnover Certificate ✓ —
8 Audited Financial Statements ✓ —
9 Bank Solvency Certificate ✓ —
10 Non-Blacklisting Declaration ✓ —
11 Site Visit Certificate ✓ —
12 Technical Compliance Sheet ✓ —
13 Signed & Stamped Technical Specification ✓ —
14 Authorization / Power of Attorney ✓ —
15 Tender Acceptance / Undertaking ✓ —
17 Tender Fee ₹2,832/- —
18 Schedule-B / Financial BOQ — ✓
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 20 of
SECTION 6: BID EVALUATION, QUALIFICATION & DISQUALIFICATION
1. The Bids shall be evaluated by the Evaluation Committee / Competent Authority of
Sarigam Clean Initiative (SCI) in accordance with the requirements of the Tender
2. The evaluation shall be carried out in the following stages:
Stage-I: Preliminary Scrutiny and Technical Evaluation
Stage-II: Financial Evaluation of Technically Responsive Bidders
3. Only those Bidders who satisfy the eligibility requirements and are found technically
responsive shall be considered for opening and evaluation of their Financial Bids.
4. Submission of a Bid shall not confer any right upon the Bidder to be declared technically
qualified or to have its Financial Bid opened.
6.2 Preliminary Scrutiny
SCI shall initially examine each Bid to determine whether:
1. The Bid has been submitted within the prescribed date and time.
2. The prescribed EMD and Tender Fee, wherever applicable, have been submitted in the
required manner or a valid exemption has been claimed with supporting documentary
3. The Bid has been submitted through the prescribed E-Tender Portal.
4. All mandatory documents specified in Section 4 and Section 5 have been submitted.
5. The Bid is properly signed / digitally authenticated by the authorized person.
6. The Bid is free from any material condition, reservation or deviation affecting the
requirements of the Tender.
7. The Bidder has submitted the mandatory Site Visit Certificate.
A Bid failing to satisfy any material mandatory requirement may be treated as non-
responsive and rejected.
6.3 Technical Evaluation
The Technical Bid shall be evaluated with respect to the following:
The Bidder shall satisfy all requirements specified under Section 4 – Eligibility Criteria & Pre-
Qualification Requirements, including:
Valid Class E-1 or above Contractor Registration;
PAN and GST Registration;
Required statutory registrations;
Similar Work Experience;
Average Annual Turnover;
Bank Solvency;
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 21 of
Non-Blacklisting Declaration; and Other mandatory eligibility requirements.
B. Technical Compliance
The Bidder shall demonstrate compliance with all material, dimensional, fabrication,
anchoring, welding, installation and painting requirements specified in Section 8 and the
approved drawings.
C. Tender Acceptance
The Bidder shall have accepted the Scope of Work, Technical Specifications, BOQ, Drawing and
Conditions of Contract without any material deviation.
6.4 Technical Responsiveness
A Bid shall be considered Technically Responsive when the Bidder satisfies the eligibility
and financial criteria in Section 4, submits all mandatory documents, provides the Site
Visit Certificate and Technical Compliance Sheet, accepts the Tender requirements
without material deviation, and meets the technical requirements of Section
Only Technically Responsive Bidders shall proceed to Financial Evaluation.
6.5 Clarifications During Evaluation
1. SCI may seek clarification from a Bidder regarding any document or information already
submitted with the Bid where such clarification is considered necessary for evaluation.
2. The Bidder shall furnish the clarification within the time specified by SCI.
3. Any clarification sought shall not permit the Bidder to change, modify, substitute or
improve the substance of its original Bid or quoted price.
4. Failure to provide the required clarification within the specified time may result in
evaluation of the Bid based on the documents already available or rejection of the Bid.
5. SCI may verify any document, certificate, work order, completion certificate, registration
or other information submitted by the Bidder from the issuing authority or Client.
6.6 Financial Evaluation
1. The Financial Bids of only Technically Responsive Bidders shall be opened.
2. The Financial Bids shall be evaluated based on the total evaluated Bid Price as per the
prescribed Schedule-B / BOQ.
3. The Bidder quoting the lowest evaluated total price (L1) shall ordinarily be considered
for award, subject to compliance with all Tender Conditions and approval of the
Competent Authority of SCI.
4. The lowest quoted rate shall not, by itself, confer an automatic right to award of the
5. SCI reserves the right to seek justification from a Bidder where the quoted rate
appears abnormally low or otherwise inconsistent with the scope and technical
requirements of the work.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 22 of
6. If the Bidder fails to provide a satisfactory justification for an abnormally low rate, SCI
may reject such Bid in accordance with the applicable Tender Conditions.
6.7 Comparison of Rates
For the purpose of financial evaluation:
Evaluated Bid Price = Basic Bid Price + applicable GST / statutory components, as specified
in the Financial Bid format.
The basis of comparison shall be clearly indicated in the Financial Bid / BOQ.
Where GST is separately quoted, comparison of the basic rate excluding GST shall be made for
determining the lowest basic quoted rate, subject to the applicable tax provisions and Tender
6.8 Equal / Tie Bids
In the event that two or more technically qualified Bidders are determined to have identical
lowest evaluated Bid prices, the tie shall be resolved through an objective and transparent
mechanism permissible under the applicable procurement rules and / or the prescribed E-
Tender Portal procedure.
The method adopted for resolving such tie shall be recorded in the Tender Evaluation /
Comparative Statement.
No post-bid negotiation or opportunity for revision of quoted rates shall ordinarily be permitted,
except where specifically permitted under applicable procurement rules and duly approved by
the Competent Authority.
6.9 Grounds for Disqualification / Rejection
Without prejudice to any other provision of the Tender Document, SCI may reject or disqualify a
1. The Bidder fails to satisfy any mandatory eligibility criterion.
2. The Bidder does not possess a valid Class E-1 or above Contractor Registration as
required under the Tender.
3. The Bidder fails to establish completed experience in BOTH the qualifying RCC /
Civil Work and the qualifying Railing Work in a Chemical Zone / Chemical
Industrial Estate, through acceptable documentary evidence.
4. Mandatory documents are not submitted.
5. The Site Visit Certificate is not submitted.
6. The Bid contains material deviations, conditions or reservations against the Tender
7. False, forged, fabricated, misleading or materially incorrect information or documents
8. The Bidder submits an incomplete or conditional Bid.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 23 of
9. The Bidder attempts to influence or interfere with the evaluation process.
10. The Bidder conceals material information relating to its eligibility or qualification.
11. The Bidder is found to be blacklisted, debarred, suspended or otherwise ineligible as
declared under the Tender.
12. The Bidder has a conflict of interest which, in the opinion of SCI, may adversely affect fair
13. The Bidder fails to provide clarification sought by SCI within the specified period.
14. The Bidder otherwise fails to comply with any material requirement of the Tender
6.10 Minor Omissions / Clarifications
SCI may, at its discretion, seek clarification regarding a minor omission, clerical error or non-
material discrepancy which does not alter the substance of the Bid or affect the Bidder's
eligibility, technical compliance or quoted price.
No clarification shall be permitted to cure a material deficiency, introduce a new
qualification, replace a mandatory eligibility document, alter the quoted price or modify the
substance of the Bid.
6.11 Right of SCI
1. SCI reserves the right to verify any information submitted by the Bidder.
2. SCI may seek clarification or additional documentary evidence for verification of
submitted credentials.
3. SCI reserves the right to accept or reject any or all Bids, in whole or in part, in accordance
with the Tender Conditions.
4. The decision of the Competent Authority of SCI regarding qualification, disqualification,
technical responsiveness and award of work shall be final, subject to applicable law and
procurement rules.
6.12 Award of Contract
After completion of Technical and Financial Evaluation:
1. The successful Bidder shall be issued a Letter of Acceptance / Work Order, as
2. The successful Bidder shall furnish the required Performance Security / Security
Deposit within the prescribed period.
3. The successful Bidder shall commence the work within the period specified in the Work
4. Failure of the successful Bidder to furnish the required Performance Security or comply
with the conditions precedent to commencement may result in cancellation of the award
and such further action as provided under the Tender Conditions.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 24 of
SECTION 7: GENERAL & SPECIAL CONDITIONS OF CONTRACT
7.1 Contract Documents
The Contract shall be governed by and construed in accordance with the following documents:
1. Notice Inviting E-Tender (NIT);
2. Instructions to Bidders;
3. Eligibility Criteria;
4. Bid Submission Requirements;
5. Bid Evaluation Criteria;
6. General & Special Conditions of Contract;
7. Technical Specifications;
8. Scope of Work;
9. Schedule-B / BOQ;
10. Drawings and technical details issued / approved by SCI;
11. Accepted Financial Bid;
12. Letter of Acceptance / Work Order; and
13. Corrigenda, Addenda and Clarifications issued by SCI.
In case of any discrepancy or conflict between the Contract Documents, the order of precedence
shall be as determined by SCI, unless otherwise specifically stated in the Contract.
7.2 Contract Agreement / Work Order
1. The successful Bidder shall enter into an Agreement / accept the Work Order issued by
SCI in the prescribed form within the period specified by SCI.
2. The Contractor shall not commence the work until the required formalities, including
submission of Performance Security, are completed, wherever applicable.
3. The Contractor shall comply with all terms and conditions of the Work Order and Tender
Document throughout the Contract Period.
7.3 Performance Bank Guarantee
1. The successful Bidder shall furnish a Performance Bank Guarantee (PBG) equivalent
to 5.00% of the Contract Value prior to commencement of the Contract in the
prescribed format.
2. The PBG shall remain valid for the period specified in the Tender / Contract and shall be
subject to the conditions governing its invocation and release.
3. The Performance Security shall remain valid until completion of the Contract and for
such additional period as may be specified by SCI.
4. Failure to furnish the required Performance Security within the prescribed period shall
constitute a breach of the award conditions and SCI may cancel the award and take
further action as provided under the Tender Conditions.
5. The Performance Security may be invoked by SCI in accordance with the Contract in case
of failure by the Contractor to fulfil its contractual obligations.
6. Invocation of Performance Bank Guarantee: Without prejudice to any other rights or
remedies available under the Contract, SCI shall have the right to invoke and encash the
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 25 of
Performance Bank Guarantee in accordance with the Contract Conditions in the event of
default by the Contractor.
7.4 Security Deposit
The Contractor shall furnish / provide a Security Deposit equivalent to 5.00% of the Contract
Value, comprising:
a) 2.50% Initial Security Deposit to be submitted before execution of the Agreement;
b) remaining 2.50% shall be recovered proportionately from Running Account Bills
until the total Security Deposit of 5.00% is achieved.
SCI shall have the right to recover any amount payable by the Contractor under the Contract from
any Running Account Bill, Security Deposit, Performance Bank Guarantee or any other amount
payable to the Contractor, without prejudice to any other legal rights and remedies available to
7.5 Commencement of Work
1. The Contractor shall commence the work within 7 days from the date specified in the
Work Order / Letter of Commencement, unless otherwise directed by SCI.
2. The Contractor shall mobilize adequate manpower, materials, tools, equipment and
other resources required for commencement of the work within the stipulated period.
3. Failure to commence the work within the stipulated period without valid justification may
attract action under the Contract Conditions.
7.6 Completion Period
1. The entire work shall be completed within 120 Days from the date of commencement
specified in the Work Order.
2. The Contractor shall plan and execute the work in such a manner that the work does not
interfere unnecessarily with the operation, safety or activities of the CETP.
3. The Contractor shall be responsible for timely completion of the work in accordance with
the approved programme.
7.7 Extension of Time
1. Any request for extension of time shall be submitted by the Contractor in writing before
expiry of the stipulated completion period, clearly stating the reasons and supporting
2. Extension of time may be granted by SCI where the delay is attributable to circumstances
beyond the reasonable control of the Contractor and is accepted by SCI.
3. No extension shall be granted for delays arising from:
o inadequate manpower;
o shortage of materials;
o shortage of tools/equipment;
o poor planning;
o procurement delays attributable to the Contractor;
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 26 of
o failure to verify site conditions; or
o other causes attributable to the Contractor.
4. Any extension granted shall be subject to such terms and conditions as SCI may
7.8 Liquidated Damages for Delay
1. If the Contractor fails to complete the work within the stipulated completion period, for
reasons attributable to the Contractor, Liquidated Damages shall be levied at 0.5% of
the value of the delayed work per week or part thereof.
2. The total Liquidated Damages shall be limited to a maximum of 5% of the Accepted
Contract Value.
3. Levy of Liquidated Damages shall not relieve the Contractor from its obligation to
complete the remaining work.
4. SCI may recover Liquidated Damages from any amount payable to the Contractor,
including pending bills or Security / Performance Security, as applicable.
7.9 Measurement of Work
1. Measurements shall be recorded for completed, executed and accepted work under both
job categories.
2. Railing shall be measured in Running Metres (RM) along the approved alignment / centre
line. Civil repair work shall be measured in the applicable units solely for recording and
verification of executed quantities.
3. No separate measurement or payment shall be made for:
o anchor fasteners;
o chemical anchoring;
o epoxy painting;
o transportation;
o loading/unloading;
o tools and tackles; or
o other incidental works, unless specifically provided as a separate BOQ item.
4. Measurements of completed work shall be jointly recorded / verified by the Contractor
and SCI's Engineer-in-Charge for determining the value payable under the respective job
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 27 of
7.10 Payment Conditions
1. Payment shall be made against actual completed, measured and accepted work under
the complete combined work, applying the corresponding accepted consolidated
percentage rate.
2. No payment shall be made for:
o rejected material;
o incomplete work;
o defective work;
o uninstalled fabricated material;
o excess quantity fabricated without approval; or
o work not accepted by SCI.
3. The Contractor shall submit the required invoice / bill along with measurement records
and other supporting documents required by SCI.
4. Payment shall be subject to applicable statutory deductions including TDS and other
deductions as applicable.
5. GST shall be dealt with as specified in the Financial Bid and applicable statutory
7.11 No Advance Payment
No advance payment shall be payable to the Contractor, unless specifically approved in
writing by SCI under exceptional circumstances.
The Contractor shall arrange all resources, materials, labour and working capital necessary for
execution of the work.
7.12 Material Inspection & Approval
1. All materials supplied by the Contractor shall be new, unused and conforming to the
approved Technical Specifications and Drawing.
2. SCI shall have the right to inspect materials at the Contractor's premises, supplier's
premises or at site.
3. SCI may require submission of Manufacturer's Test Certificate / Material Test Certificate
(MTC) for MS B-Class pipes and other major materials.
4. Any material found to be defective, damaged, undersized, substandard or not
conforming to the specified MS B-Class pipe and other material requirements
shall be rejected.
5. Rejected material shall be removed and replaced by the Contractor at its own cost.
7.13 Quality of Workmanship
1. All fabrication and installation shall be carried out by skilled and experienced
2. Welding shall be sound, continuous / adequate as per approved drawing and free from
visible defects.
3. The railing shall be installed true to line, level and vertical alignment.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 28 of
4. Base plates shall be securely fixed using the specified 12 × 125 mm chemical anchoring
5. Any defective, loose, damaged, misaligned or improperly fabricated work shall be
rectified or replaced by the Contractor at no additional cost.
6. SCI's inspection or acceptance of any work shall not relieve the Contractor of its
responsibility for the quality and performance of the completed work.
7.14 Existing Structures & Property
1. The Contractor shall take all necessary precautions while drilling, anchoring, welding,
cutting, dismantling and installing the railing.
2. The Contractor shall ensure that no damage is caused to:
o RCC structures;
o electrical installations;
o existing railing; or
o any other SCI property.
3. Any damage caused due to negligence, improper execution or unsafe working practices
of the Contractor shall be repaired / restored by the Contractor at its own cost to the
satisfaction of SCI.
7.15 Dismantling of Existing Railing
1. Existing railing shall be dismantled only at locations specifically identified or instructed
2. Dismantling shall be carried out carefully without causing damage to the existing RCC
structure or adjacent facilities.
3. Dismantled material shall be handed over to SCI at the designated location within the
4. Dismantled material shall remain the property of SCI.
5. No dismantled material shall be removed from the CETP premises without written
permission of SCI.
7.16 Safety Requirements
1. The Contractor shall be solely responsible for the safety of its workers, supervisors and
other persons engaged by it.
2. The Contractor shall provide appropriate PPE including:
o Safety helmet;
o Safety shoes;
o Safety gloves;
o Safety goggles;
o Welding shield;
o Safety harness, wherever required; and
o Other PPE appropriate to the work.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 29 of
3. All welding, cutting and other hot-work activities shall be carried out only after obtaining
the required Work Permit / Hot Work Permit from SCI, wherever applicable.
4. The Contractor shall provide suitable barricading, warning signs and safe access around
5. Work at height shall be carried out using safe and suitable access arrangements and fall-
protection measures.
6. The Contractor shall comply with all applicable safety and labour laws and SCI's site
safety requirements.
7.17 Housekeeping & Removal of Waste
1. The Contractor shall maintain the work area in a clean and safe condition throughout
2. Scrap, welding electrodes, cutting waste, packaging material, debris and other waste
generated from the work shall be collected and removed regularly.
3. On completion of the work, the Contractor shall thoroughly clean the work area and hand
over the area to SCI in a satisfactory condition.
4. No additional payment shall be made for housekeeping and removal of Contractor-
generated waste.
7.18 Contractor's Labour & Personnel
1. The Contractor shall deploy adequate skilled and semi-skilled manpower required for
timely completion of the work.
2. All personnel deployed by the Contractor shall comply with SCI's site entry, safety and
security requirements.
3. The Contractor shall be responsible for wages, statutory contributions, insurance,
compensation and other obligations relating to its employees/workers.
4. SCI shall have the right to require removal from site of any person whose conduct, safety
violation or performance is considered unsatisfactory.
7.19 Tools, Equipment & Resources
The Contractor shall arrange, at its own cost, all tools, equipment and resources required for
execution, including but not limited to:
Welding machines;
Cutting machines;
Grinding machines;
Drilling machines;
Chemical anchoring equipment;
Lifting / shifting arrangements;
Scaffolding / working platforms, wherever required;
Measuring instruments; and
Other equipment necessary for completion of the work.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 30 of
1. Painting shall be carried out in accordance with Clause 8.11. Any coating
damaged during handling or installation, or found defective, shall be rectified by
the Contractor at no additional cost.
7.21 Defect Liability Period
1. The Defect Liability Period (DLP) shall be 12 months from the date of completion and
acceptance of the entire work.
2. During the DLP, the Contractor shall rectify, at its own cost, any defect attributable to:
o defective material;
o poor workmanship;
o defective welding;
o loose / failed anchoring;
o misalignment;
o defective fabrication;
o peeling / defective coating; or
o any other workmanship-related defect.
3. Such defects shall be rectified within the period specified by SCI after receipt of written
4. Failure to rectify defects within the specified period shall entitle SCI to get the work
rectified through another agency and recover the associated cost from the Contractor.
The Contractor shall maintain all insurance required under applicable laws for its workers,
personnel and execution of the work, including Workmen / Employee Compensation
Insurance, wherever applicable.
The Contractor shall be responsible for any loss, injury or damage arising from its operations,
negligence or failure to comply with applicable safety requirements.
The Contractor shall indemnify and keep indemnified SCI against claims, losses, damages,
liabilities, penalties or expenses arising from:
1. Injury or death of Contractor's personnel;
2. Damage to SCI property caused by the Contractor;
3. Violation of applicable labour/statutory requirements attributable to the Contractor; or
4. Negligent or wrongful acts or omissions of the Contractor or its personnel.
7.24 Sub-Contracting
The Contractor shall not assign or sub-contract the whole or substantial part of the
work without prior written approval of SCI.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 31 of
Any approved sub-contractor shall not relieve the Contractor of its contractual responsibility or
liability towards SCI.
7.25 Suspension of Work
SCI may instruct the Contractor to temporarily suspend the work for reasons including:
Safety concerns;
Operational requirements of CETP;
Interference with plant operations;
Emergency situations;
Violation of site rules; or
Other circumstances requiring suspension.
The Contractor shall comply with such instructions immediately.
7.26 Termination
SCI may terminate the Contract / Work Order, after giving appropriate notice where applicable,
if the Contractor:
1. Fails to commence or proceed with the work without reasonable cause;
2. Persistently fails to maintain required quality;
3. Abandons the work;
4. Fails to rectify defective work;
5. Repeatedly violates safety requirements;
6. Submits false or forged documents;
7. Becomes insolvent or otherwise unable to perform the Contract;
8. Materially breaches the Tender / Contract Conditions; or
9. Fails to complete the work within the stipulated period and the delay is attributable to the
10. If the Bidder / Contractor is found to have submitted false documents, made misleading
statements or engaged in fraudulent, corrupt or collusive practices during the Tender
Process or Contract Period, SCI shall have the right to reject the Bid / terminate the
Contract, forfeit the EMD, PBG and/or Security Deposit, and take further action as
permissible under applicable law and the Contract.
Upon termination, SCI shall be entitled to take such action as permitted under the Contract,
including recovery of additional costs and invocation of Performance Security, wherever
7.27 Force Majeure
Neither party shall be liable for failure to perform its obligations to the extent such failure is
directly caused by a Force Majeure Event beyond the reasonable control of the affected party,
subject to timely written notice and supporting evidence.
Force Majeure shall not include:
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 32 of
shortage of manpower;
shortage of materials;
increase in material prices;
financial difficulties;
normal equipment breakdown;
delay of suppliers; or
other circumstances within the reasonable control of the Contractor.
7.28 Variation in Quantity
1. The quantities indicated in the BOQ are estimated quantities and may vary depending
upon actual site requirements.
2. SCI may increase or decrease the quantities during execution of the Contract, subject to
the permissible limits prescribed under the applicable procurement rules, Government
policies / resolutions, approved delegation of powers and the provisions of this Contract.
3. Any variation within the permissible contractual and delegated limits shall be executed at
the applicable accepted consolidated percentage rate, subject to prior approval
wherever required.
4. Any variation beyond the permissible contractual or delegated limits shall require prior
approval of the Competent Authority before execution.
5. Payment shall be made only for the actual quantity executed, measured and accepted by
6. The Contractor shall not be entitled to claim compensation, loss of profit, overheads or
any other additional amount merely due to increase or decrease in the estimated
quantity, except where specifically admissible under the Contract or applicable law.
7.29 No Claim for Unapproved Extra Work
The Contractor shall not execute any additional work outside the approved Scope / BOQ
without prior written approval of SCI.
No payment shall be made for any additional work executed without such prior written approval.
7.30 Dispute Resolution
1. Any dispute, difference or claim arising out of or in connection with the Tender / Contract
shall, in the first instance, be referred in writing to the Engineer-in-Charge / Authorized
Representative of SCI for resolution.
2. If the dispute is not resolved within a reasonable period, the matter shall be referred to
the Competent Authority of SCI for appropriate decision in accordance with the Contract
and applicable law.
3. Where arbitration is specifically provided for or subsequently agreed / authorized in
accordance with the applicable law and approved contractual conditions of SCI, such
arbitration shall be conducted in accordance with the Arbitration and Conciliation Act,
1996, as amended from time to time.
4. Nothing contained in this clause shall restrict SCI from taking immediate action
necessary for protection of its property, safety, plant operations or public interest.
5. Pending resolution of any dispute, the Contractor shall, to the extent reasonably
possible, continue to perform the undisputed obligations of the Contract.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 33 of
7.31 Governing Law & Jurisdiction
The Contract shall be governed by the laws of India.
Subject to the dispute-resolution provisions of the Contract, the courts having appropriate
jurisdiction at Valsad, Gujarat shall have jurisdiction over matters arising out of or in connection
with the Contract.
7.32 Completion & Handover
Completion and handover shall be governed by Clause 9.17. SCI shall issue a
Completion / Acceptance Certificate only after satisfactory inspection and acceptance
of the entire work.
SCI shall issue a Completion / Acceptance Certificate after satisfactory completion of the
7.33 Right of Recovery / Set-o
SCI shall have the right to recover any amount payable by the Contractor under the Contract from
any Running Account Bill, Security Deposit, Performance Bank Guarantee or any other amount
payable to the Contractor, without prejudice to any other legal rights and remedies available to
If the Contractor fails to perform any part of the Contract or fails to rectify any deficiency within
the period specified by SCI, SCI shall have the right to execute such work through another agency
at the risk and cost of the Contractor. Any additional expenditure incurred by SCI shall be
recoverable from the Contractor's Running Account Bills, Security Deposit, Performance Bank
Guarantee or any other amount payable to the Contractor.
7.34 Competent Authority
All approvals, decisions, sanctions, variations, extensions, recoveries, acceptance of work and
other actions under this Tender / Contract shall be undertaken by the Competent Authority or
authorized officer of SCI in accordance with the applicable delegation of powers, approved
financial limits and procurement procedures of SCI. No officer or representative of SCI shall have
authority to approve any matter beyond the financial or administrative powers delegated to such
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 34 of
SECTION 8: TECHNICAL SPECIFICATIONS
1. The Contractor shall supply, fabricate, install and complete the B-Class MS pipe
railing strictly in accordance with the drawings and technical details issued /
approved by SCI, the Technical Specifications, BOQ and instructions of SCI.
2. All materials shall be new, unused and of approved quality.
3. The Contractor shall verify the actual site dimensions and conditions before fabrication.
4. No fabrication shall commence without verification of relevant site dimensions.
5. In case of any discrepancy between actual site conditions and drawings issued /
approved by SCI, the Contractor shall bring the same to SCI's notice before
fabrication. SCI's written decision shall be followed.
8.2 Railing Configuration
The railing shall generally be of approximately 1000 mm height and shall comprise top rail,
vertical posts, intermediate rail and bottom rail as shown in the approved drawing.
The following specifications shall apply:
Component Specification
Top Rail MS B-Class, 40 mm dia
Vertical Post MS B-Class, 40 mm dia
Intermediate / Mid Rail MS B-Class, 32 mm dia
Bottom Rail MS B-Class, 32 mm dia
Railing Height Approx. 1000 mm, as per approved drawing
Base Plate MS 50 × 120 × 6 mm
Chemical Anchor 12 × 125 mm
Elbow Suitable MS elbow/fittings as per approved drawing
Welding ARC welding
Finish Coat 2 coats epoxy paint
8.3 MS B-Class Pipes
1. All railing pipes shall be MS B-Class pipes.
2. The pipes shall be new, straight, free from visible defects and suitable for the intended
3. The following nominal diameters shall be used:
o Top Rail – 40 mm
o Vertical Posts – 40 mm
o Mid Rail – 32 mm
o Bottom Rail – 32 mm
4. Pipe sizes shall not be reduced or substituted without prior written approval of SCI.
5. The Contractor shall submit relevant Material Test Certificates / Manufacturer's
Certificates, whenever required by SCI.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 35 of
1. Each vertical railing post shall be fixed using an MS base plate of 50 × 120 × 6 mm or as
specifically shown in the approved drawing.
2. The base plate shall be properly welded to the vertical post.
3. Base plates shall be properly aligned and securely fixed to the RCC structure.
4. The Contractor shall ensure that the base plate provides adequate stability and does not
project in a manner that creates a safety hazard.
8.5 Chemical Anchoring
1. Railing posts/base plates shall be securely fixed to the existing RCC structure using 12 ×
125 mm chemical anchors.
2. Drilling diameter and hole preparation shall be compatible with the approved chemical
anchoring system and manufacturer's recommended procedure.
3. The Contractor shall ensure proper:
o hole cleaning;
o chemical injection; and
o anchor installation.
4. The chemical anchor shall be allowed to cure for the required period before the railing is
subjected to loading or use.
5. Any loose, defective or improperly anchored post shall be removed and re-fixed by the
Contractor at no additional cost.
8.6 Fabrication
1. Fabrication shall be carried out by experienced and skilled fabricators.
2. Pipes shall be accurately cut, bent and fitted to the required dimensions.
3. All joints shall be properly aligned before welding.
4. Fabrication shall conform to the drawings and technical details issued / approved
5. No excessive heating, deformation or damage to the MS B-Class pipe shall be
permitted during fabrication.
6. Sharp edges, burrs and projections shall be removed by grinding.
1. Welding shall be carried out using suitable ARC welding procedures and equipment.
2. Welded joints shall be sound, properly fused and free from visible defects such as:
o excessive porosity;
o incomplete fusion; or
o sharp projections.
3. Welds shall be properly ground wherever necessary to achieve a neat and safe finish.
4. Any defective weld identified by SCI shall be repaired by the Contractor at no additional
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 36 of
8.8 Installation & Alignment
1. The railing shall be installed strictly at the locations shown in the BOQ / approved drawing
or as directed by SCI.
2. The railing shall be:
o properly aligned;
o securely anchored.
3. The Contractor shall ensure uniform spacing and proper geometry as shown in the
approved drawing.
4. Any misaligned, loose or defective railing shall be dismantled and reinstalled by the
Contractor at its own cost.
8.9 Elbows, End Caps & Fittings
1. All required elbows, bends, end caps, connectors and other fittings necessary for
completing the railing shall be supplied by the Contractor.
2. Elbows shall be MS B-Class, 90°, unless otherwise shown in the approved drawing.
3. Fittings shall be properly aligned and securely welded/fixed.
4. No separate payment shall be made for such fittings unless specifically provided as a
separate BOQ item.
8.10 Surface Preparation
1. Before painting, all surfaces shall be properly cleaned and prepared.
2. Welding residues, dirt, grease, oil, loose particles, sharp projections and other
contaminants shall be removed.
3. Welded areas shall be properly ground and prepared before application of the coating
1. The completed railing shall be provided with:
a. One coat of approved primer; and
b. Two coats of approved epoxy finish paint.
2. Painting shall be carried out after completion of fabrication, welding, installation and
necessary surface preparation.
3. Each coat shall be allowed adequate drying / curing time before application of the
subsequent coat.
4. The final coating shall be uniform and free from:
o peeling; blistering; runs; uneven application; and visible defects.
5. Any damaged coating caused during transportation, handling or installation shall be
repaired by the Contractor at no additional cost.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 37 of
8.12 Technical Inspection
SCI shall have the right to inspect the work at any stage of fabrication and installation.
SCI may inspect:
Pipe quality;
Pipe class and dimensions;
Base plate dimensions;
Welding quality;
Chemical anchoring;
Installation;
Surface preparation; and
Inspection by SCI shall not relieve the Contractor of its responsibility for compliance with the
Tender requirements.
8.13 Rejection of Defective Work
SCI may reject any material or workmanship that does not conform to the approved
specifications, drawing or required quality.
The Contractor shall, at its own cost:
remove rejected material;
dismantle defective work;
replace defective components;
rectify welding defects;
rectify anchoring defects;
rectify alignment; and
repaint defective areas,
within the period specified by SCI.
No additional payment shall be made for such rectification.
8.14 Technical Compliance
The Contractor shall comply with all dimensions, material specifications and construction
requirements stated in the Tender Document and approved drawing.
The following shall be treated as mandatory technical requirements:
MS B-Class Pipe – B-Class
Top Rail – 40 mm dia
Vertical Post – 40 mm dia
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 38 of
Mid Rail – 32 mm dia
Bottom Rail – 32 mm dia
Base Plate – 50 × 120 × 6 mm
Chemical Anchor – 12 × 125 mm
Primer – 1 Coat
Epoxy Finish – 2 Coats
Any deviation from the above shall require prior written approval of SCI.
8.15 Applicable Drawings and Technical Details
Detailed railing fabrication drawings, layouts and other relevant technical details,
wherever required, shall be provided by SCI to the successful Contractor after issuance
of the Work Order.
The Contractor shall fabricate and install the railing in accordance with the drawings and
technical instructions issued or approved by SCI.
Where dimensions are specifically indicated in the drawings issued or approved by SCI,
those dimensions shall be followed. Any proposed deviation shall require prior written
approval from SCI.
All repair materials shall be new and from approved sources. The Contractor shall submit
product data / technical data sheets when requested. SCI may inspect the substrate,
reinforcement, formwork, grout, concrete and finished surfaces at any stage. Defective or
rejected work shall be removed and rectified at the Contractor's cost. The Contractor shall
protect existing plant equipment, pipelines, tanks and operating facilities.
8.16 CIVIL REPAIR AND REHABILITATION – TECHNICAL SPECIFICATIONS
8.16.1 General Requirements
The Contractor shall carry out civil repair and rehabilitation works of existing aeration tank
platforms and associated RCC structures at CETP Sarigam, strictly in accordance with the Scope
of Work, BOQ, technical specifications and instructions issued by SCI.
8.16.2 Controlled Breaking and Dismantling
Damaged, loose, deteriorated or unsound concrete shall be carefully removed by
controlled breaking and dismantling.
The dismantling work shall be carried out without causing damage to the existing
reinforcement, sound concrete, embedded items or adjoining structures.
The exposed surface shall be properly cleaned and prepared before carrying out further
All dismantled debris shall be removed and disposed of at a location approved by SCI.
8.16.3 Reinforcement Treatment and Chemical Anchoring
Exposed reinforcement shall be cleaned properly to remove loose rust, scale and other
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 39 of
Wherever additional reinforcement is required, 12 mm / 16 mm diameter reinforcement
bars shall be fixed using an approved chemical anchoring system.
Drilling diameter, embedment depth, hole cleaning and chemical application shall be as
per the manufacturer's recommendations and approved by SCI.
The Contractor shall ensure proper bonding and anchorage of reinforcement.
8.16.4 Injection Grouting
Injection grouting shall be carried out at identified cracks, voids and locations as
instructed by SCI.
Suitable approved injection grout material shall be used depending on the nature and
condition of the cracks.
The surface shall be properly prepared and sealed before injection.
Grouting shall ensure effective filling of identified cracks and voids.
8.16.5 Waterproof Plaster
Waterproof plaster shall be carried out using cement mortar in the proportion of 1:3
(cement), incorporating an approved waterproofing compound.
The surface shall be cleaned and prepared before application.
The plaster shall be applied uniformly to achieve proper bonding, required thickness and
a smooth finished surface.
Curing shall be carried out adequately as per the approved method and material
manufacturer's recommendations.
8.16.6 Formwork and Shuttering
Formwork and shuttering shall be rigid, properly aligned, leak-proof and adequately
The formwork shall be capable of maintaining the required shape, dimensions and
alignment during concreting.
Shuttering shall be removed only after the concrete has achieved sufficient strength, as
approved by SCI.
8.16.7 Reinforcement Steel
Reinforcement steel shall be of approved Fe500 grade, epoxy coated, as specified in the
Reinforcement shall be cut, bent, placed and secured in accordance with the approved
drawings and instructions of SCI.
Proper cover, spacing, lapping and anchorage shall be maintained.
Any damaged or defective reinforcement shall be replaced at the Contractor's cost.
8.16.8 Concrete Work
Concrete shall be of M30 grade as specified in the BOQ.
Concrete shall be mixed, placed, compacted and finished properly to achieve the
required strength and durability.
Proper compaction shall be ensured to avoid honeycombing and voids.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 40 of
Adequate curing shall be carried out in accordance with applicable standards and
approved procedures.
8.16.9 Quality Control and Inspection
The Contractor shall use new materials from approved sources and submit product data
/ technical data sheets whenever requested by SCI.
SCI shall have the right to inspect the reinforcement, anchoring, surface preparation,
formwork, grouting, concrete and finished surfaces at any stage.
Any defective or rejected work shall be rectified or replaced by the Contractor at its own
The Contractor shall protect existing plant equipment, pipelines, tanks and operating
facilities from damage during execution.
8.16.10 Safety and Protection
The Contractor shall take all necessary safety precautions during breaking, drilling,
reinforcement fixing, concreting and other repair activities.
Work shall be planned and executed in coordination with SCI to avoid disruption to CETP
Any damage caused to existing structures, equipment or facilities due to the Contractor's
activities shall be made good at the Contractor's cost.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 41 of
SECTION 9: SCOPE OF WORK
9.1 General Scope
The work shall comprise the complete supply, fabrication, dismantling, transportation,
installation, chemical anchoring, welding, painting and handing over of B-Class MS pipe railing at
the designated locations of CETP Sarigam, complete in all respects in accordance with the
Tender Document, approved drawing, Technical Specifications, BOQ and instructions of SCI.
The Contractor shall provide all materials, labour, supervision, tools, tackles, equipment,
transportation and other resources necessary for satisfactory completion of the work.
9.2 Site Verification & Measurement
Before commencement of fabrication, the Contractor shall:
1. Visit and inspect all designated railing locations.
2. Verify the actual site dimensions, levels, alignment and existing conditions.
3. Identify the exact locations of railing posts and base plates.
4. Check the condition of the existing RCC structures where chemical anchoring is
5. Verify access and working conditions for transportation, fabrication and installation.
6. Prepare the fabrication requirements based on actual verified site dimensions.
7. Bring any discrepancy between the drawings issued / approved by SCI and actual
site conditions
No claim for additional payment shall be entertained merely on account of failure to verify
site conditions before fabrication.
9.3 Dismantling of Existing Railing
Where specifically instructed by SCI, the Contractor shall:
1. Carefully dismantle the existing railing.
2. Avoid damage to RCC structures, tanks, pipelines, equipment, flooring and other existing
3. Remove the dismantled railing and associated debris from the working area.
4. Shift and stack the dismantled railing at the location designated by SCI.
5. Hand over all dismantled material to SCI.
6. Ensure that dismantling activities do not adversely affect ongoing CETP operations.
9.4 Supply of Materials
The Contractor shall supply all materials required for the complete civil repair and railing work,
including but not limited to:
MS B-Class pipes;
40 mm dia pipes;
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 42 of
32 mm dia pipes;
MS base plates;
12 × 125 mm chemical anchors;
MS elbows and fittings;
Welding consumables;
Chemical anchoring material;
Fasteners and other accessories; and
All other incidental materials required for completion.
All materials shall comply with Section 8 – Technical Specifications.
9.5 Transportation & Handling
The Contractor shall be responsible for:
1. Loading of materials at the source / supplier's premises.
2. Transportation of materials to CETP Sarigam.
3. Unloading at site.
4. Shifting of materials from the unloading point to the work location.
5. Safe storage and protection of materials until installation.
6. Handling of fabricated railing during transportation and erection.
Any damage to materials during transportation, unloading, shifting or handling shall be
rectified/replaced by the Contractor at no additional cost.
9.6 Fabrication
The Contractor shall carry out complete fabrication of the railing, including:
1. Cutting of MS B-Class pipes to required dimensions.
2. Bending / forming wherever required.
3. Preparation and fitting of railing components.
4. Fabrication of vertical posts.
5. Fabrication and fixing of base plates.
6. Fabrication of top, intermediate and bottom rails.
7. Installation of elbows, bends and end caps.
8. Welding of all required joints.
9. Grinding and finishing of welded areas.
10. Checking of dimensions and alignment before installation.
All fabrication shall conform to the approved drawing and Technical Specifications.
9.7 Installation
The Contractor shall install the fabricated railing at the locations identified by SCI.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 43 of
Installation shall include:
1. Setting out and marking of post locations.
2. Drilling of holes in the existing RCC structure.
3. Cleaning and preparation of drilled holes.
4. Application of chemical anchoring material.
5. Installation of 12 × 125 mm chemical anchors.
6. Fixing of base plates.
7. Erection and fixing of vertical posts.
8. Fixing of top, intermediate and bottom rails.
9. Welding / fixing of joints and fittings.
10. Alignment, levelling and verticality checks.
11. Final tightening / securing of all components.
9.8 Chemical Anchoring
The Contractor shall carry out the complete chemical anchoring operation in accordance with
the approved anchoring system manufacturer's recommended procedure.
The work shall include:
Hole cleaning;
Chemical injection;
Anchor installation;
Final fixing and inspection.
The Contractor shall ensure that all anchors are properly installed and adequately cured before
the railing is subjected to normal use.
Any failed, loose or defective anchor shall be replaced by the Contractor at no additional cost.
9.9 Welding & Finishing
The Contractor shall:
1. Carry out all required welding using suitable equipment.
2. Ensure proper alignment before welding.
3. Remove welding slag and other residues.
4. Grind sharp edges and projections.
5. Ensure smooth and safe finished surfaces.
6. Rectify defective welds identified during inspection.
9.10 Surface Preparation & Painting
After completion of fabrication and installation, the Contractor shall carry out:
1. Cleaning of surfaces.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 44 of
2. Removal of dirt, grease, oil, loose material and welding residues.
3. Surface preparation.
4. Application of one coat of approved primer.
5. Application of two coats of epoxy finish paint.
6. Repair of any coating damaged during transportation or installation.
Painting shall be carried out in accordance with Section
9.11 Protection of Existing Facilities
The Contractor shall take adequate precautions to protect existing:
RCC tanks and structures;
Pumps and equipment;
Electrical installations;
Instrumentation;
Walkways and flooring;
Existing railing; and
Other CETP facilities.
Any damage caused by the Contractor shall be repaired/restored at the Contractor's own cost to
the satisfaction of SCI.
9.12 Safety During Execution
The Contractor shall provide and enforce the use of appropriate PPE and safety arrangements
throughout the work.
The Contractor shall:
1. Obtain required work permits before commencing applicable activities.
2. Follow SCI's site safety procedures.
3. Provide suitable barricading and warning signage.
4. Provide safe access and working platforms wherever required.
5. Use proper fall-protection arrangements for work at height.
6. Ensure safe handling of welding and cutting equipment.
7. Maintain safe housekeeping throughout execution.
9.13 Coordination With CETP Operations
Since the work is to be carried out within an operating CETP, the Contractor shall coordinate its
activities with SCI's authorized representative.
1. The Contractor shall not obstruct normal CETP operations unnecessarily.
2. Work in areas affecting plant operation shall be undertaken only with prior coordination
3. SCI may change the sequence or timing of work depending upon operational
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 45 of
4. The Contractor shall comply with such reasonable instructions without affecting the
overall completion obligation.
9.14 Inspection & Rectification
SCI may inspect the work at any stage.
The Contractor shall rectify, at its own cost, any work found to be:
improperly aligned;
inadequately welded;
improperly anchored;
incorrectly fabricated;
otherwise not conforming to the Tender requirements.
No additional payment shall be made for rectification of defective work.
9.15 Housekeeping
The Contractor shall:
1. Keep the work area clean and safe throughout execution.
2. Remove welding slag, metal scrap, packaging material and other waste generated by its
3. Remove dismantled railing debris from the work area.
4. Prevent obstruction of access routes and plant operations.
5. Clean the entire work area after completion.
9.16 Testing / Inspection of Completed Railing
Upon completion, the Contractor shall jointly inspect the railing with SCI.
The inspection shall include, as applicable:
Dimensional compliance;
Alignment and verticality;
Stability and rigidity;
Base plate fixing;
Chemical anchoring;
Weld quality;
Surface finish;
Primer application; and
Epoxy coating.
Any deficiency identified during inspection shall be rectified before final acceptance.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 46 of
9.17 Completion & Handover
The Contractor shall hand over the completed work only after:
1. All specified railing has been installed.
2. All dismantling work, wherever applicable, has been completed.
3. All chemical anchors are properly installed.
4. All welding and fabrication defects have been rectified.
5. Painting has been completed.
6. Work areas have been cleaned.
7. Dismantled material has been handed over to SCI.
8. All defects identified during inspection have been rectified.
9. SCI has inspected and accepted the completed work.
9.18 Contractor's Responsibility
The Contractor shall be fully responsible for providing all resources necessary for completion of
the work, including:
Skilled fabricators;
Welding machines;
Cutting/grinding machines;
Drilling equipment;
Chemical anchoring equipment;
Lifting/shifting arrangements;
Safety equipment;
Transportation; and
Other incidental resources.
No additional payment shall be made for resources normally required for execution of the
specified work.
9.19 Completeness of Scope
The Scope of Work shall be deemed to include all items and activities reasonably necessary for
complete and satisfactory execution of the work, whether or not every minor incidental activity
is separately mentioned, provided that such activity is within the general nature of the specified
work. However, no additional or materially changed work shall be executed or claimed
without prior written approval of SCI. The Contractor shall coordinate breaking, grouting,
concreting and plastering activities with CETP operations. Work shall be planned to avoid
obstruction to plant access and operation. No work a ecting plant safety or operation shall be
undertaken without prior permission / work permit from SCI.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 47 of
9.20 CIVIL REPAIR AND REHABILITATION WORK
1. The Contractor shall execute the civil repair and rehabilitation of existing aeration
tank platforms and associated RCC structures as detailed in Clause 8.16 and the
BOQ, including only those locations and quantities instructed / approved by SCI.
2. Measurements of completed work shall be jointly recorded and verified by the Contractor
and SCI's authorized representative for certification and payment purposes.
9.21 COORDINATION AND SEQUENCING OF CIVIL WORK
1. The Contractor shall plan and execute the civil repair and rehabilitation work in a
systematic sequence in coordination with SCI's authorized representative.
2. Before commencement of work at any location, the Contractor shall obtain permission
and necessary instructions from SCI regarding the work area, execution schedule and
sequence of activities.
3. The work shall be carried out in stages and location-wise, as directed by SCI, to ensure
minimum interference with the normal operation of CETP facilities.
4. The sequence of civil repair activities shall generally include:
o Identification and marking of damaged portions;
o Controlled breaking and removal of damaged concrete;
o Cleaning and preparation of exposed surfaces;
o Reinforcement cleaning, treatment and chemical anchoring, wherever required;
o Injection grouting, wherever required;
o Fixing of reinforcement and formwork;
o Concreting and finishing;
o Waterproof plastering and curing; and
o Final inspection and rectification, if required.
5. The Contractor shall not commence any activity that may affect existing pipelines,
equipment, electrical installations, operating facilities or ongoing CETP operations
without prior approval from SCI.
6. The Contractor shall coordinate with SCI before carrying out activities involving drilling,
breaking, concreting, material movement or any other operation that may interfere with
plant activities.
7. The Contractor shall ensure that completed repair sections are properly protected until
the required curing and inspection are completed.
8. SCI reserves the right to modify the work sequence, locations and execution schedule
depending upon plant operating requirements and site conditions. The Contractor shall
comply with such instructions without compromising the quality and safety of the work.
9. The Contractor shall deploy adequate manpower, materials, tools and equipment to
ensure timely completion of the work in accordance with the approved execution
10. No additional claim shall be entertained solely on account of changes in work sequence
or location-wise scheduling instructed by SCI, provided the overall scope of work
remains unchanged.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 48 of
SECTION 10: SCHEDULE-B – BILL OF QUANTITIES (BOQ)
1. The estimated amounts indicated in Schedule-B are for the purpose of inviting bids.
Detailed quantities and measurements in the Scope of Work and Technical
Specifications are for execution and measurement purposes only; bidders shall not
quote separate item-wise rates.
2. The total estimated cost put to tender for the complete combined work is ₹48,83,500/-
(Rupees Forty-Eight Lakh Eighty-Three Thousand Five Hundred Only), comprising Railing
Work and Civil Repair Work.
3. As one consolidated percentage (Above / Below / At Par) on the total estimated tender
value of ₹48,83,500/- for the complete combined work in the prescribed Financial Bid /
Schedule-B. Separate job-wise or item-wise rates shall not be invited.
4. The quoted percentage rate for the complete combined work shall remain firm and shall
cover all materials, labour, fabrication, dismantling wherever required, transportation,
loading/unloading, installation, chemical anchoring, welding, fittings, painting, tools,
tackles, safety arrangements, housekeeping and all incidental requirements necessary
for complete execution of that job.
5. The quoted rate shall include all materials, labour, fabrication, dismantling wherever
required, transportation, loading/unloading, installation, chemical anchoring, welding,
fittings, painting, tools, tackles, safety arrangements, housekeeping and all other
incidental requirements necessary for complete execution of the work.
6. GST shall be quoted separately, as applicable, in the prescribed Financial Bid format.
10.2 Bill of Quantities
Sr. Description of Complete Estimated Percentage Adjusted
No. Combined Work Amount (₹) (Above / Below Amount (₹)
Complete combined work
comprising (i) Supply, fabrication,
installation and painting of B-
Class MS pipe railings and (ii)
Repairing and strengthening of
existing aeration tank platforms,
including all associated civil repair
works, as per Tender Scope,
Technical Specifications and
TOTAL ESTIMATED COST PUT TO
Estimated Cost Put to Tender: ₹48,83,500/- (In Words: Rupees Forty-Eight Lakh Eighty-Three
Thousand Five Hundred Only.)
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 49 of
The estimated cost put to tender for the complete combined work is ₹48,83,500/-. The Bidder
shall quote only one consolidated percentage above, below or at par against this total estimated
10.3 Location-wise Quantity Schedule
Refer to the Location-wise Quantity Schedule provided in this Tender Document.
10.4 Percentage Rate to be Quoted
As one consolidated percentage (Above / Below / At Par) on the total estimated tender value of
₹48,83,500/- for the complete combined work in the prescribed Financial Bid / Schedule-B.
Separate job-wise or item-wise rates shall not be invited.
Particular Bidder's Quote
Estimated Cost Put to Tender ₹48,83,500/-
Single consolidated percentage
_____ % Above / Below / At Par
Resultant / Adjusted Contract
The Bidder shall quote one consolidated percentage for the complete combined work and clearly
indicate whether the quoted percentage is Above, Below or At Par the total estimated tender
value of ₹48,83,500/-. At Par shall mean 0.00%.
No separate job-wise or item-wise rate or payment shall be applicable. The single quoted
percentage shall cover the complete combined scope, materials, labour, equipment and
incidental requirements of both Railing Work and Civil Repair Work.
10.5 Measurement and Payment
Measurement of each job shall be recorded in the applicable units specified in the
Technical Specifications and Scope of Work; however, no separate item-wise rate shall
Railing quantities shall be measured in Running Metres along the approved alignment.
Civil repair quantities shall be measured in the applicable units for verification of actual
work executed. Such measurements shall be used for assessing completed work under
the respective job and shall not require item-wise rate quotations.
Payment shall be made for the actual completed, measured and accepted work
comprising both Railing Work and Civil Repair Work, applying the single accepted
consolidated percentage above / below / at par to the applicable estimated rates /
amounts for the executed work.
No separate payment shall be made for incidental activities / materials included in the
description of any BOQ item.
No payment shall be made for fabrication completed but not installed and accepted.
No payment shall be made for rejected, defective or dismantled material which is not
accepted by SCI.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 50 of
10.6 Variation in Quantity
The quantities specified in the BOQ are estimated quantities only and may vary according
to actual site requirements.
SCI reserves the right to increase or decrease the quantity according to actual site
requirements, subject to the applicable contractual provisions.
The Contractor shall execute such quantity as directed by SCI within the permissible
contractual provisions.
Payment shall be based on the actual work executed and accepted under the complete
combined work, applying the single accepted consolidated percentage above / below / at
No claim for loss of profit, overhead or compensation shall ordinarily be admissible
merely due to variation in the estimated quantity, except as specifically provided under
10.7 No Separate Payment for Incidental Works
No separate payment shall be made for any minor or incidental activity necessary for completing
the specified railing work, even if such activity is not individually listed in the BOQ, provided that
it falls within the general scope of the work.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 51 of
11.1 Price Basis
1. The Bidder shall quote only one consolidated percentage rate (Above / Below / At Par) on
the total estimated tender value of ₹48,83,500/- for the complete combined work. No
separate job-wise or item-wise rates shall be quoted.
2. The quoted rate shall be a firm and fixed rate for the entire Contract Period.
3. The single quoted consolidated percentage rate shall be deemed to include all costs and
expenses necessary for the complete and satisfactory execution of the entire combined
work, including supply of all required materials, civil repair materials, reinforcement
steel, MS pipes and fittings, fabrication, cutting, bending, welding, dismantling, loading,
unloading, transportation, handling, installation, chemical anchoring, painting, concrete
works, labour, supervision, tools and tackles, safety arrangements, access
arrangements, housekeeping, disposal of waste and all other incidental works and
4. GST shall be quoted separately in the Financial Bid, as applicable.
5. Any applicable statutory deduction / withholding shall be made from payments in
accordance with prevailing laws.
The Bidder shall quote only one consolidated percentage (Above / Below / At Par) against the total
estimated tender value of ₹48,83,500/- shown in Schedule-B. No job-wise, basic rate, unit rate or
item-wise amount shall be quoted.
Description of Quoted Adjusted
Sr. Complete Estimated Percentage Basic
GST Rate Amount Amount
No. Combined Amount (₹) (Above / Amount
Work Below / At (₹)
Below / At applicable
in all respects
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 52 of
11.3 Basis of Payment
1. Payment shall be made on the basis of actual work completed, measured and accepted
by SCI under the complete combined work, applying the single accepted consolidated
percentage rate.
2. The accepted consolidated percentage shall remain applicable to the actual work
executed and measured under the complete combined work, subject to the provisions
relating to variation in scope / quantity.
3. No payment shall be made for:
uninstalled fabricated material;
rejected material;
defective work;
excess material procured by the Contractor;
work executed without authorization; or
work not accepted by SCI.
11.4 Running Account Bills
1. The Contractor may submit Running Account Bills (RA Bills) for the completed and
accepted portion of the work, subject to the billing procedure prescribed by SCI.
2. Each bill shall be supported by:
Joint measurement / measurement record;
Location-wise quantity executed;
Approved measurement sheet;
Required statutory documents; and
Any other supporting documents required by SCI.
3. SCI shall verify the measurements and supporting documents before processing the bill.
4. 2.50% of the Contract Value shall be recovered proportionately from the Running Account
Bills towards Security Deposit until the total Security Deposit of 5.00% is achieved.
11.5 Final Bill
1. The Contractor shall submit the Final Bill after completion of the entire work and after
obtaining the required completion / acceptance certification from SCI.
2. The Final Bill shall include the final measured quantity and all required supporting
3. Payment of the Final Bill shall be subject to:
o Completion of the entire scope;
o Rectification of all defects;
o Completion of painting;
o Completion of housekeeping;
o Handover of dismantled material;
o Submission of required documents; and
o Compliance with all contractual requirements.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 53 of
11.6 Payment Time
Payment shall be processed after verification and acceptance of the relevant bill, joint
measurements, supporting documents and applicable statutory compliances, in accordance
with the prescribed internal financial procedures of SCI and subject to availability of funds.
Any statutory deduction, withholding, recovery or adjustment required under applicable law or
the Contract shall be made before release of payment.
11.7 Statutory Deductions
SCI shall make all deductions required under applicable laws, including but not limited to:
GST-TDS, wherever applicable;
Labour-related statutory deductions, wherever applicable; and
Other statutory recoveries / deductions as applicable.
The Contractor shall be responsible for its own statutory tax and compliance obligations.
11.8 Firmness of Rates
1. The rates quoted by the Contractor shall remain firm and fixed throughout the Contract
2. No escalation shall be payable on account of increase in the cost of:
MS B-Class pipes;
Reinforcement steel, binding wire, formwork and shuttering;
Welding consumables;
Transportation;
Tools and equipment; or
Any other input cost.
3. No price escalation shall be admissible unless specifically provided for in the Contract.
11.9 No Payment for Unapproved Extra Work
1. The Contractor shall not execute any additional or extra work outside the approved Scope
of Work / BOQ without prior written approval of SCI.
2. No payment shall be made for such additional work executed without prior written
3. Where additional work is specifically approved by SCI, the rate shall be determined in
accordance with the applicable provisions of the Contract.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 54 of
SECTION 12: ANNEXURES & FORMS
The following Annexures and Forms shall form an integral part of the Tender Document. The
Bidder shall duly complete, sign, stamp and submit the applicable forms along with the
Technical / Financial Bid as specified.
ANNEXURE-A: BIDDER INFORMATION
A.1 General Information
Particular Details
Constitution of Firm
Registered Office Address
Correspondence Address
GST Registration No.
Class E-1 Registration No.
Validity of Class E-1 Registration
EPF Registration No.
ESIC Registration No.
A.2 Bank Details
Particular Details
Authorized Signatory
Seal of Bidder:
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 55 of
ANNEXURE-B: DETAILS OF SIMILAR WORK EXPERIENCE
The Bidder shall provide separate details and supporting documents for BOTH mandatory
categories: (1) RCC / Civil Work and (2) MS / GI Railing Work, each executed in a Chemical
Zone / Chemical Industrial Estate. No minimum work value is prescribed.
Sr. Work Name Client / Work Contract Completed Completion
No. Category of Chemical Order Value (₹) Value (₹) Date /
(RCC / Work Zone or No. & – No Supporting
Railing) Estate Date Minimum Certificate
The Bidder shall attach copies of the relevant Work Orders and Completion / Performance
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 56 of
ANNEXURE-C: FINANCIAL INFORMATION
C.1 Average Annual Turnover
Financial Year Annual Turnover (₹)
Average Annual Turnover
Minimum Required ₹48,83,500/-
Average Annual Turnover
The above information shall be supported by a Chartered Accountant certified Turnover
Certificate and relevant financial documents.
CA Certificate / Membership No.: __________________
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 57 of
ANNEXURE-D: BANK SOLVENCY CERTIFICATE
The Bidder shall submit a valid Bank Solvency Certificate issued by a Scheduled Commercial
Bank for the amount specified under Section
The original / digitally verifiable Bank Solvency Certificate shall be submitted/uploaded as
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 58 of
ANNEXURE-E: NON-BLACKLISTING DECLARATION
We, M/s. ______________________________, hereby declare that our firm/company has not been
blacklisted, debarred, suspended or banned by any Government Department, Government
Agency, PSU, GIDC, Local Authority or other statutory authority during the period specified in the
Tender Document.
We further declare that no information relating to our eligibility has been concealed or
misrepresented in the Bid submitted against this Tender.
We understand that if any information furnished by us is found to be false, incorrect or misleading
at any stage, SCI shall have the right to take appropriate action in accordance with the Tender
For and on behalf of the Bidder
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 59 of
ANNEXURE-F: SITE VISIT CERTIFICATE
SITE VISIT CERTIFICATE
This is to certify that:
M/s. __________________________________________has visited and inspected the site at SCI CETP
Sarigam, GIDC Sarigam Industrial Estate, Taluka Umbergaon, District Valsad, Gujarat, in
connection with the Tender for:
“Repairing and Strengthening of Existing Aeration Tank Platforms and Supply, Fabrication,
Installation and Painting of MS Pipe Railings at CETP Sarigam.”
The Bidder has inspected the proposed railing locations, existing conditions, access
arrangements and other relevant site conditions and has been provided an opportunity to obtain
necessary information for preparation of its Bid.
Acknowledgement by Bidder
We confirm that we have visited the site and have understood the site conditions relevant to the
execution of the work.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 60 of
ANNEXURE-G: TECHNICAL COMPLIANCE SHEET
The Bidder shall confirm compliance against each major technical requirement.
Sr. Requirement Tender Requirement Bidder's Deviation, if
No. Compliance any
1 Pipe Class MS B-Class
2 Top Rail 40 mm dia
3 Vertical Post 40 mm dia
4 Mid Rail 32 mm dia
5 Bottom Rail 32 mm dia
6 Railing Height Approx. 1000 mm
7 Base Plate 50 × 120 × 6 mm
8 Chemical Anchor 12 × 125 mm
9 Elbow Suitable MS elbow/fittings
10 Welding ARC Welding
11 Primer 1 Coat
12 Epoxy Paint 2 Coats
13 Dismantling Wherever instructed by SCI
14 Installation Complete as per Drawing
15 Site Verification Mandatory before fabrication
16 Civil breaking and As per Section 8.12.1
17 Reinforcement As per Section 8.12.2
chemical repair
18 Injection grouting As per Section 8.12.3
19 1:3 waterproof As per Section 8.12.4
20 Formwork and As per Section 8.12.5
21 Fe500 epoxy- As per Section 8.12.6
22 M30 design-mix As per Section 8.12.7
Authorized Signatory
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 61 of
ANNEXURE-H: ACKNOWLEDGEMENT OF DRAWING ARRANGEMENT
Availability of Drawings
Detailed drawings, layouts and other relevant technical details, wherever required for execution
of the work, shall be provided by SCI to the successful bidder after issuance of the Work Order.
The drawings shall not form part of the tender documents and shall not be required to be
submitted along with the bid. Bidders shall quote their rates based on the Scope of Work,
technical specifications, quantities and site conditions specified in the tender document.
The successful bidder shall execute the work in accordance with the drawings and instructions
issued/approved by SCI. No additional claim on account of non-availability of drawings at the
tender stage shall be entertained.
For and on behalf of the Bidder
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 62 of
ANNEXURE-I: TENDER ACCEPTANCE / UNDERTAKING
We, M/s. __________________________________, hereby confirm that we have carefully examined
and understood the complete Tender Document for:
“Repairing and Strengthening of Existing Aeration Tank Platforms and Supply, Fabrication,
Installation and Painting of MS Pipe Railings at CETP Sarigam.”
We hereby confirm that:
1. We have read and understood all Tender Conditions.
2. We accept all terms and conditions of the Tender without material deviation.
3. We have inspected the site and understood the scope of work.
4. We have considered all site conditions while quoting our rates.
5. We shall comply with the Technical Specifications and approved Drawing.
6. We shall complete the work within the stipulated completion period.
7. Our quoted rates shall remain firm during the Contract Period.
8. We shall comply with applicable statutory, labour and safety requirements.
9. We shall provide all materials, labour, tools, equipment and resources required for
complete execution.
10. We shall rectify defective work at our own cost.
11. We have not submitted any false or misleading information in our Bid.
For and on behalf of the Bidder
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 63 of
ANNEXURE-J: POWER OF ATTORNEY / AUTHORIZATION
Where the Bid is signed by a person other than the proprietor / partner / authorized Director, the
Bidder shall submit appropriate Power of Attorney / Board Resolution / Authorization
Letter authorizing the person to:
Sign and submit the Bid;
Represent the Bidder before SCI;
Submit clarifications;
Sign contractual documents; and
Perform all acts necessary in connection with the Tender.
The authorization document shall be legally valid and duly executed.
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 64 of
The Financial Bid shall be submitted through the prescribed E-Tender Portal / BOQ format.
Description Quoted Adjusted
of Complete Estimated Percentage Basic GST
No Amount Amount
Combined Amount (₹) (Above / Amount Rate
Work Below / At (₹)
Repair Work, As
1 in all 48,83,500.00 applic
respects as able
Bidder's Declaration
We confirm that the above rates are quoted after considering the complete scope of work and all
applicable Tender Conditions.
For and on behalf of the Bidder
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 65 of
ANNEXURE-L: DOCUMENT CHECKLIST
Sr. No. Document Submitted
1 Class E-1 or Above Registration ☐
3 GST Registration ☐
4 EPF / ESIC, wherever applicable ☐
5 Work Orders / Completion Certificates ☐
for BOTH RCC and Railing Works
6 Completion / Performance Certificates ☐
7 CA Certified Turnover Certificate ☐
8 Audited Financial Statements ☐
9 Bank Solvency Certificate ☐
10 Non-Blacklisting Declaration ☐
11 Site Visit Certificate ☐
12 Technical Compliance Sheet ☐
13 Signed Technical Specification ☐
14 Authorization / Power of Attorney ☐
15 Tender Acceptance / Undertaking ☐
16 EMD / Bid Security ☐
17 Tender Fee, wherever applicable ☐
18 Financial Bid / BOQ ☐
SARIGAM CLEAN INITIATIVE | E-TENDER NOTICE NO. 02 OF 2026-27 | Page 66 of
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
E-Short Tender Notice No. 02 of 2026-27.pdf
BOQ2.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .